Default Croydon tramlink improvements

Does anyone know exactly what improvements are being installed on Tramlink? There's been vague talk and closures in relation to single track sections being doubled (plus all the platform extensions for the new trams) anyone have any more information?
Waddon is offline  
Sponsored links - Registered users do not see these banners - join today!
Unread 25th May 2012, 11:37   #2
MattE2010
The cry was No Surrender
Established Member
 
MattE2010's Avatar
 
Join Date: 16 May 2010
Location: North
Posts: 9,637
Default

Doubling the current single track between Mitcham and Mitcham Jn is being worked on at the moment, and along with a new platform at Wimbledon should open for autumn I think. There's also work going on on the Elmers End branch this week, I'm not sure what exactly, though it could be for work for the new Route 4 coming soon (Elmers End-Therapia Lane-Elmers End).
--- old post above --- --- new post below ---
Elmers End-Arena is closed this week until Monday, Mitcham-Mitcham Jn is closed Saturday and Sunday.
__________________
RIP Clive Burr

Last edited by MattE2010; 25th May 2012 at 13:37. Reason: Correcting Route 4
MattE2010 is offline  
Unread 25th May 2012, 12:12   #3
WatcherZero
Established Member
 
Join Date: 25 Feb 2010
Posts: 4,090
Default

Quote:
Originally Posted by Waddon View Post
Does anyone know exactly what improvements are being installed on Tramlink? There's been vague talk and closures in relation to single track sections being doubled (plus all the platform extensions for the new trams) anyone have any more information?
I think part of the reason they chose Variotram was there wasnt as many physical alterations as they expected there would be, very few if any platform alterations just some signal repositioning and track doubling to increase capacity.
WatcherZero is offline  
Unread 25th May 2012, 12:17   #4
robvulpes
Member
 
Join Date: 11 Jan 2007
Posts: 63
Default

Quote:
Originally Posted by MattE2010 View Post
Doubling the current single track between Mitcham and Mitcham Jn is being worked on at the moment, and along with a new platform at Wimbledon should open for autumn I think.
Yes to the doubling (sooner than that I believe, but don't have a specific date); but the new platform is a difficult much longer-term aspiration.

Quote:
Originally Posted by MattE2010 View Post
There's also work going on on the Elmers End branch this week, I'm not sure what exactly, though it could be for work for the new Route 4 coming soon (Elmers End-Croydon-Elmers End).
Dualling much of the (short) branch.

Rob
Croydon
robvulpes is offline  
Unread 25th May 2012, 13:00   #5
tbtc
I am the passenger...
Established Member
 
tbtc's Avatar
 
Join Date: 16 Dec 2008
Location: Sheffield
Posts: 11,517
Default

Quote:
Originally Posted by MattE2010 View Post
a new platform at Wimbledon should open for autumn I think
Where would the new platform go? Between the current Tramlink one and the edge of the station presumably? Not in the way of the "Thameslink" line?
tbtc is offline  
Unread 25th May 2012, 13:02   #6
MattE2010
The cry was No Surrender
Established Member
 
MattE2010's Avatar
 
Join Date: 16 May 2010
Location: North
Posts: 9,637
Default

Quote:
Originally Posted by tbtc View Post
Where would the new platform go? Between the current Tramlink one and the edge of the station presumably? Not in the way of the "Thameslink" line?
As mentioned above, that's a long term version (my error). I'm not sure where it would be located but I suspect that it isn't impossible.
__________________
RIP Clive Burr
MattE2010 is offline  
Unread 25th May 2012, 13:35   #7
Ivo
Starmie
Established Member
 
Ivo's Avatar
 
Join Date: 8 Jan 2010
Location: Bath (or Southend)
Posts: 7,057
Default

Quote:
Originally Posted by MattE2010 View Post
There's also work going on on the Elmers End branch this week, I'm not sure what exactly, though it could be for work for the new Route 4 coming soon (Elmers End-Croydon-Elmers End).
Hang on - how does that work? Is that not already Route 2? Is the network being redrawn or something?
__________________
Official Member of the Bath & Wells FirstGroup Bus Customer Panel
Starmie
Ivo is offline  
Unread 25th May 2012, 13:37   #8
MattE2010
The cry was No Surrender
Established Member
 
MattE2010's Avatar
 
Join Date: 16 May 2010
Location: North
Posts: 9,637
Default

Quote:
Originally Posted by Ivo View Post
Hang on - how does that work? Is that not already Route 2? Is the network being redrawn or something?
Nope, it's in addition to provide extra capacity, it actually runs to Therapia Lane on the Wimbledon branch. All in addition to current operations, nothing's being redrawn or altered elsewhere.
__________________
RIP Clive Burr
MattE2010 is offline  
Closed Thread

Bookmarks

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump



All times are GMT. The time now is 06:25.
Powered by vBulletin® Version 3.8.7
Copyright © 2000 - 2013, Jelsoft Enterprises Ltd.
© RailUK Forums 2005 - the year after 2012