Default My idea for Stansted Express Norwich?

Hi, wandering wether having a Stansted Express Service to Norwich would be viable, with the Ely North Junction set to be Upgraded and High demand for the Norwich - Cambridge route, Would it be possible to Intergrate this Service into a Half Hourly Norwich - Cambridge Service with an hourly extension to Stansted Airport using Class 170s?
oliMw is offline  
Sponsored links - Registered users do not see these banners - join today!
Unread 10th June 2012, 08:58   #2
SprinterMan
Established Member
 
SprinterMan's Avatar
 
Join Date: 20 Sep 2010
Location: Bangor (Gwynedd) or Sudbury (Suffolk)
Posts: 1,569
Default

Quote:
Originally Posted by oliMw View Post
Hi, wandering wether having a Stansted Express Service to Norwich would be viable, with the Ely North Junction set to be Upgraded and High demand for the Norwich - Cambridge route, Would it be possible to Intergrate this Service into a Half Hourly Norwich - Cambridge Service with an hourly extension to Stansted Airport using Class 170s?
Certainly would be feasible. It would be very nice if this happened, but lack of stock and maybe lack of platforms at Stansted could be a problem.

Adam
SprinterMan is offline  
Unread 10th June 2012, 09:29   #3
gordonthemoron
Established Member
 
gordonthemoron's Avatar
 
Join Date: 4 Sep 2006
Location: Leighton Buzzard
Posts: 2,737
Default

since this service would probably have to share platform with XC, they'd have to cut back the XC layover at Stansted (45 mins)
__________________
Operators travelled with in 2013:
Virgin, LM, XC, ST, LOROL, TPX, ME, SET
gordonthemoron is offline  
Unread 10th June 2012, 10:11   #4
Sir_Clagalot
Member
 
Join Date: 9 Aug 2007
Posts: 818
Default

Wire Ely-Norwich and extend the Stansted Expresses through to Norwich, but dont advertise it at Liv St/Norwich as being a through train as it's quicker via Ipswich!!
__________________
All Opinions expressed are Mine and Mine alone and do NOT represent any company.
Sir_Clagalot is offline  
Unread 10th June 2012, 10:14   #5
HLE 13
Member
 
Join Date: 1 Mar 2012
Posts: 714
Default

Quote:
Originally Posted by Sir_Clagalot View Post
Wire Ely-Norwich and extend the Stansted Expresses through to Norwich, but dont advertise it at Liv St/Norwich as being a through train as it's quicker via Ipswich!!
How many of the 170s are required to work Cambridge to Norwich?

If the above did happen, would there be enough 317s for example to operate between Norwich and Cambridge?
HLE 13 is online now  
Unread 10th June 2012, 10:23   #6
oliMw
Member
 
Join Date: 11 Feb 2012
Posts: 51
Default

I think it is about 4 but I am not to Sure
oliMw is offline  
Unread 10th June 2012, 10:31   #7
317666
Member
 
317666's Avatar
 
Join Date: 4 Sep 2009
Posts: 903
Default

I think three 170s tend to be allocated to Cambridge - Norwich services each day, but then there's also the Cambridge - Ipswich, Ipswich - Lowestoft and Ipswich - Peterborough services they are used on too, and Greater Anglia have a shortage of DMUs as it is.
__________________
Last 317 travelled on: 317670
317666 is offline  
Unread 10th June 2012, 10:34   #8
Big Chris
Member
 
Join Date: 11 Sep 2009
Location: Norfolk
Posts: 125
Default

3 units are required to run the Norwich to Cambridge service
Big Chris is offline  
Unread 10th June 2012, 10:36   #9
David10
Member
 
Join Date: 25 May 2012
Location: Manchester
Posts: 385
Default

Quote:
Originally Posted by Sir_Clagalot View Post
Wire Ely-Norwich and extend the Stansted Expresses through to Norwich, but dont advertise it at Liv St/Norwich as being a through train as it's quicker via Ipswich!!
Ely-Norwich is probably priority number 178 on the list of lines to be electrified, ie no chance.
David10 is offline  
Unread 10th June 2012, 10:36   #10
jopsuk
Established Member
 
Join Date: 13 May 2008
Posts: 6,220
Default

Quote:
Originally Posted by Sir_Clagalot View Post
Wire Ely-Norwich and extend the Stansted Expresses through to Norwich, but dont advertise it at Liv St/Norwich as being a through train as it's quicker via Ipswich!!
I agree on the "wire it up" bit, but not the "make it a through train" bit- pointless. Better run as an extension of the Norwich-Cambridge service, perhaps calling all-stations Cambridge-Airport. I know this would be fairly slow, but it would give those stations a second hourly link to Cambridge- the XC service stops only at Audley End.

There's the 317/7 fleet sitting spare.
jopsuk is offline  
Unread 10th June 2012, 11:49   #11
LE Greys
Established Member
 
LE Greys's Avatar
 
Join Date: 6 Mar 2010
Location: Hitchin
Posts: 5,336
Default

Quote:
Originally Posted by jopsuk View Post
I agree on the "wire it up" bit, but not the "make it a through train" bit- pointless. Better run as an extension of the Norwich-Cambridge service, perhaps calling all-stations Cambridge-Airport. I know this would be fairly slow, but it would give those stations a second hourly link to Cambridge- the XC service stops only at Audley End.

There's the 317/7 fleet sitting spare.
Ely-Peterborough also needs wiring, which would give container traffic a second electrified route to Felixstowe (albeit a bit of a roundabout one unless they did Ely-Stowmarket just for freight) and act as a diversionary route for the ECML. Really, the best answer is to rebuilt the route from Braintree and divert it to Stansted, making that a through station (the XC layover could turn into an extension to Colchester or Chelmsford) but I do like the idea of the Norwich-Cambridge service extending to Stansted.
__________________
Always thinking as I type, sometimes not very well
LE Greys is offline  
Unread 10th June 2012, 11:55   #12
David10
Member
 
Join Date: 25 May 2012
Location: Manchester
Posts: 385
Default

Quote:
Originally Posted by HLE 13 View Post
How many of the 170s are required to work Cambridge to Norwich?
Service requires 3 170s. 170270-273 were built specifically for this service although now 3 car 170s are normally used.
David10 is offline  
Unread 10th June 2012, 12:05   #13
Bald Rick
Established Member
 
Join Date: 28 Sep 2010
Posts: 1,056
Default

Quote:
Originally Posted by SprinterMan View Post
Certainly would be feasible. It would be very nice if this happened, but lack of stock and maybe lack of platforms at Stansted could be a problem.

Adam
And lack of a 2nd bore of Stansted Tunnel...
Bald Rick is offline  
Unread 10th June 2012, 12:12   #14
TheBigD
Member
 
Join Date: 19 Nov 2008
Posts: 363
Default

Quote:
Originally Posted by David10 View Post
Service requires 3 170s. 170270-273 were built specifically for this service although now 3 car 170s are normally used.
The current service utilises 4 x 170's, though only 3 are in use at a time. The 1940 ex Norwich & return is booked a 2 car whilst all the rest are 3 car units.

On Sundays 4 units are required for most of the day.
TheBigD is offline  
Closed Thread

Bookmarks

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump



All times are GMT. The time now is 10:35.
Powered by vBulletin® Version 3.8.7
Copyright © 2000 - 2013, Jelsoft Enterprises Ltd.
© RailUK Forums 2005 - the year after 2012