Default Transport for London Looking for New DMUs?

I presume the GOBLIN Still isnt justifying elecftrication then?

Quote:
Railway Gazette‏@railwaygazette

TfL seeks expressions of interest in the supply of 8 x 3 or 4-car diesel trains for London Overground's Gospel Oak-Barking line from 2013
(From the railway gazettes twitter feed)

I wonder if these to supplement or replace the 172's then?
fgwrich is offline  
Sponsored links - Registered users do not see these banners - join today!
Unread 21st May 2012, 14:27   #2
anthony263
Established Member
 
anthony263's Avatar
 
Join Date: 19 Aug 2008
Location: South Wales
Posts: 3,849
Default

From what I heard they wanted a centre carriage for the current London Overground class 172's together with perhaps some additional units to provide extra capacity.
anthony263 is offline  
Unread 21st May 2012, 14:29   #3
Failed Unit
Established Member
 
Join Date: 26 Jan 2009
Location: Central Belt
Posts: 3,937
Default

Quote:
Originally Posted by anthony263 View Post
From what I heard they wanted a centre carriage for the current London Overground class 172's together with perhaps some additional units to provide extra capacity.
Surely on one supplier can do this? Would be shocked if a whole new train is cheaper than adding coaches to an existing one.
Failed Unit is offline  
Unread 21st May 2012, 14:36   #4
anthony263
Established Member
 
anthony263's Avatar
 
Join Date: 19 Aug 2008
Location: South Wales
Posts: 3,849
Default

Nothing to stop TFL ordering a complete new fleet of new dmu's from another train builder although I do agree that would be unlikely.
anthony263 is offline  
Unread 21st May 2012, 14:36   #5
ainsworth74
Moderator
 
ainsworth74's Avatar
 
Join Date: 16 Nov 2009
Location: Redcar
Posts: 8,829
Default

Quote:
Originally Posted by Failed Unit View Post
Surely on one supplier can do this? Would be shocked if a whole new train is cheaper than adding coaches to an existing one.
You would think so wouldn't you? I would guess this will end up the same way as the Southern 377 deal did. Written in such a way that only one company can actually win a tender to supply the vehicles/units.
ainsworth74 is offline  
Unread 21st May 2012, 14:53   #6
HSTEd
Established Member
 
Join Date: 14 Jul 2011
Posts: 3,454
Default

They could be planning to buy a new fleet of TfL specific (ie Cl378 style interior) DMUs and then cascade the Cl172s to whoever.
HSTEd is offline  
Unread 21st May 2012, 15:23   #7
jopsuk
Established Member
 
Join Date: 13 May 2008
Posts: 6,218
Default

or get intermediate 172 carriages to the same spec as a relatively short term stop gap measure as electrification seems to be well beyoond when they'd like to go to three/four car operation. Perhaps once GOBLIN is electrified Chiltern might be interested in additional longer units...
jopsuk is offline  
Unread 21st May 2012, 15:37   #8
jcollins
Established Member
 
Join Date: 23 Jan 2009
Posts: 8,427
Default

Just a thought it might be 8 x 4 car units but what if it's actually 16 centre carriages for LO with 8 x 2 car 172s for LM? With the LO units not having toilets that may be more logical than building new longer trains for LO and cascading the existing trains to LM.
__________________
"We apologise for the delay. It is due to some selfish ******* throwing themselves in front of the train." - Andy Parsons.
jcollins is offline  
Unread 21st May 2012, 16:06   #9
317666
Member
 
317666's Avatar
 
Join Date: 4 Sep 2009
Posts: 903
Default

As I understand it, the reason that the London Overground Class 172s have 2+2 seating rather than longitudinal is so that one day they can be cascaded without having to have the internal layout changed to make them more suitable. It's possible that the new DMUs TfL are after may have a 378-style, longitudinal seated interior.
__________________
Last 317 travelled on: 317670
317666 is offline  
Unread 21st May 2012, 16:23   #10
jcollins
Established Member
 
Join Date: 23 Jan 2009
Posts: 8,427
Default

Quote:
Originally Posted by 317666 View Post
As I understand it, the reason that the London Overground Class 172s have 2+2 seating rather than longitudinal is so that one day they can be cascaded without having to have the internal layout changed to make them more suitable.
Seems strange they made them toilet less then as generally DMUs aren't used on frequent metro style services so it will be difficult to find them an alternative route without fitting toilets or permanently attaching them to other 172s with toilets - maybe even splitting them up in a similar way to how the 150/2s were split and used as centre carriages.
__________________
"We apologise for the delay. It is due to some selfish ******* throwing themselves in front of the train." - Andy Parsons.
jcollins is offline  
Unread 21st May 2012, 16:36   #11
fgwrich
Established Member
 
fgwrich's Avatar
 
Join Date: 15 Apr 2009
Location: The North (Of The South) Of the Southern Great Western!
Posts: 2,349
Default

Quote:
Originally Posted by jcollins View Post
Seems strange they made them toilet less then as generally DMUs aren't used on frequent metro style services so it will be difficult to find them an alternative route without fitting toilets or permanently attaching them to other 172s with toilets - maybe even splitting them up in a similar way to how the 150/2s were split and used as centre carriages.
True, although as were seeing with Scotrails 320s that fitting a new Toilet Module, although probably not the easiest is possible.

And as LOROL is part operated by Chiltern / DB, perhaps thats why Chiltern only ordered 4 units - with future cascades of ex London Overground units in mind?
fgwrich is offline  
Unread 21st May 2012, 16:36   #12
Failed Unit
Established Member
 
Join Date: 26 Jan 2009
Location: Central Belt
Posts: 3,937
Default

Do the LOROL 172s have corridor connections?
Failed Unit is offline  
Unread 21st May 2012, 16:46   #13
RPM
Driver
Member
 
RPM's Avatar
 
Join Date: 24 Sep 2009
Location: Waddesdon, Bucks
Posts: 753
Default

Quote:
Originally Posted by Failed Unit View Post
Do the LOROL 172s have corridor connections?
Only within each unit. Not between units.
RPM is online now  
Unread 21st May 2012, 16:48   #14
ainsworth74
Moderator
 
ainsworth74's Avatar
 
Join Date: 16 Nov 2009
Location: Redcar
Posts: 8,829
Default

Quote:
Originally Posted by Failed Unit View Post
Do the LOROL 172s have corridor connections?
No, though Bombardier are supposed to have said that it would be a very simple job to fit them (basically send them to Derby cut the current front off and fit a new one).
ainsworth74 is offline  
Unread 21st May 2012, 17:19   #15
John55
Member
 
Join Date: 24 Jun 2011
Location: South East
Posts: 800
Default

The actual wording of the TfL notice on the Government Online website issued on 16/05/12 is;

TfL is seeking expressions of interest for the following Supplies and/or Services.
a) Provision of approximately eight 3-car DMUs suitable for operation on the Gospel Oak -Barking railway, without associated train-maintenance services
b) Provision of approximately eight 3-car DMUs suitable for operation on the Gospel Oak -Barking railway, with associated train-maintenance services
TfL may consider 4-car DMUs in lieu of 3-car, but does not envisage a fleet of mixed train length.
TfL has an aspiration to introduce longer trains from 2013.
This notice is for information and to help TfL gauge market interest.
John55 is offline  
Closed Thread

Bookmarks

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump



All times are GMT. The time now is 16:28.
Powered by vBulletin® Version 3.8.7
Copyright © 2000 - 2013, Jelsoft Enterprises Ltd.
© RailUK Forums 2005 - the year after 2012