#1 | |
|
Established Member
Join Date: 15 Apr 2009
Location: The North (Of The South) Of the Southern Great Western!
Posts: 2,349
|
I presume the GOBLIN Still isnt justifying elecftrication then?
Quote:
I wonder if these to supplement or replace the 172's then? |
|
|
|
| Sponsored links - Registered users do not see these banners - join today! |
|
|
|
|
#2 |
|
Established Member
Join Date: 19 Aug 2008
Location: South Wales
Posts: 3,849
|
From what I heard they wanted a centre carriage for the current London Overground class 172's together with perhaps some additional units to provide extra capacity.
|
|
|
|
|
#3 |
|
Established Member
Join Date: 26 Jan 2009
Location: Central Belt
Posts: 3,937
|
Surely on one supplier can do this? Would be shocked if a whole new train is cheaper than adding coaches to an existing one.
|
|
|
|
|
#4 |
|
Established Member
Join Date: 19 Aug 2008
Location: South Wales
Posts: 3,849
|
Nothing to stop TFL ordering a complete new fleet of new dmu's from another train builder although I do agree that would be unlikely.
|
|
|
|
|
#5 |
|
Moderator
Join Date: 16 Nov 2009
Location: Redcar
Posts: 8,829
|
You would think so wouldn't you? I would guess this will end up the same way as the Southern 377 deal did. Written in such a way that only one company can actually win a tender to supply the vehicles/units.
|
|
|
|
|
#6 |
|
Established Member
Join Date: 14 Jul 2011
Posts: 3,454
|
They could be planning to buy a new fleet of TfL specific (ie Cl378 style interior) DMUs and then cascade the Cl172s to whoever.
|
|
|
|
|
#7 |
|
Established Member
Join Date: 13 May 2008
Posts: 6,218
|
or get intermediate 172 carriages to the same spec as a relatively short term stop gap measure as electrification seems to be well beyoond when they'd like to go to three/four car operation. Perhaps once GOBLIN is electrified Chiltern might be interested in additional longer units...
|
|
|
|
|
#8 |
|
Established Member
Join Date: 23 Jan 2009
Posts: 8,427
|
Just a thought it might be 8 x 4 car units but what if it's actually 16 centre carriages for LO with 8 x 2 car 172s for LM? With the LO units not having toilets that may be more logical than building new longer trains for LO and cascading the existing trains to LM.
__________________
"We apologise for the delay. It is due to some selfish ******* throwing themselves in front of the train." - Andy Parsons. |
|
|
|
|
#9 |
|
Member
Join Date: 4 Sep 2009
Posts: 903
|
As I understand it, the reason that the London Overground Class 172s have 2+2 seating rather than longitudinal is so that one day they can be cascaded without having to have the internal layout changed to make them more suitable. It's possible that the new DMUs TfL are after may have a 378-style, longitudinal seated interior.
__________________
Last 317 travelled on: 317670 |
|
|
|
|
#10 |
|
Established Member
Join Date: 23 Jan 2009
Posts: 8,427
|
Seems strange they made them toilet less then as generally DMUs aren't used on frequent metro style services so it will be difficult to find them an alternative route without fitting toilets or permanently attaching them to other 172s with toilets - maybe even splitting them up in a similar way to how the 150/2s were split and used as centre carriages.
__________________
"We apologise for the delay. It is due to some selfish ******* throwing themselves in front of the train." - Andy Parsons. |
|
|
|
|
#11 | |
|
Established Member
Join Date: 15 Apr 2009
Location: The North (Of The South) Of the Southern Great Western!
Posts: 2,349
|
Quote:
And as LOROL is part operated by Chiltern / DB, perhaps thats why Chiltern only ordered 4 units - with future cascades of ex London Overground units in mind? |
|
|
|
|
|
#12 |
|
Established Member
Join Date: 26 Jan 2009
Location: Central Belt
Posts: 3,937
|
Do the LOROL 172s have corridor connections?
|
|
|
|
|
#13 |
|
Driver
Member
Join Date: 24 Sep 2009
Location: Waddesdon, Bucks
Posts: 753
|
|
|
|
|
|
#14 |
|
Moderator
Join Date: 16 Nov 2009
Location: Redcar
Posts: 8,829
|
|
|
|
|
|
#15 |
|
Member
Join Date: 24 Jun 2011
Location: South East
Posts: 800
|
The actual wording of the TfL notice on the Government Online website issued on 16/05/12 is;
TfL is seeking expressions of interest for the following Supplies and/or Services. a) Provision of approximately eight 3-car DMUs suitable for operation on the Gospel Oak -Barking railway, without associated train-maintenance services b) Provision of approximately eight 3-car DMUs suitable for operation on the Gospel Oak -Barking railway, with associated train-maintenance services TfL may consider 4-car DMUs in lieu of 3-car, but does not envisage a fleet of mixed train length. TfL has an aspiration to introduce longer trains from 2013. This notice is for information and to help TfL gauge market interest. |
|
|
![]() |
| Bookmarks |
| Thread Tools | |
|
|