Looks like the Tees Yard-Knowsley empty stock working is running today...left
Tees at 9.54... Just passed Church Fenton.This maybe first time this has run although I've been away for a week and could have missed it.
Wandering pete is offline   Reply With Quote
Registered users do not see these banners - join today!
Old 4th June 2016, 07:28   #17
geoffk
Member
 
Join Date: 4 Aug 2010
Posts: 149
Default

Yes it ran yesterday (Friday) with 66152; fairly sure this was the first run. Empty flats only, no containers. Not sure when the loaded train starts.
geoffk is offline   Reply With Quote
Old 4th June 2016, 10:16   #18
Wandering pete
Member
 
Join Date: 19 Nov 2015
Posts: 23
Default

Knowsley-Wilton left last night (Friday 3rd) at 20.17....probably first loaded working ..via Warrington and Calder Valley.
Wandering pete is offline   Reply With Quote
Old 6th June 2016, 07:12   #19
childwallblues
Member
 
Join Date: 3 Jul 2014
Location: Liverpool, UK
Posts: 988
Default

Are these trains likely to take the same route from Warrington to the Calder Valley as the LBT-Drax trains?
childwallblues is offline   Reply With Quote
Old 6th June 2016, 08:31   #20
8A Rail
Member
 
8A Rail's Avatar
 
Join Date: 6 Dec 2012
Location: Liverpool
Posts: 568
Default

Quote:
Originally Posted by childwallblues View Post
Are these trains likely to take the same route from Warrington to the Calder Valley as the LBT-Drax trains?
Loaded trains - yes. Just check RTT, its all there.
__________________
Doug (8A Rail) - Website:-http://www.8arail.uk
8A Rail is offline   Reply With Quote
Old 8th June 2016, 06:37   #21
childwallblues
Member
 
Join Date: 3 Jul 2014
Location: Liverpool, UK
Posts: 988
Default

Quote:
Originally Posted by 8A Rail View Post
Loaded trains - yes. Just check RTT, its all there.
So empty trains will be through MCV.
childwallblues is offline   Reply With Quote
Old 8th June 2016, 21:12   #22
8A Rail
Member
 
8A Rail's Avatar
 
Join Date: 6 Dec 2012
Location: Liverpool
Posts: 568
Default

Quote:
Originally Posted by childwallblues View Post
So empty trains will be through MCV.
Yes, that is what the timetables are suggesting.
__________________
Doug (8A Rail) - Website:-http://www.8arail.uk
8A Rail is offline   Reply With Quote
Old 4th July 2016, 19:57   #23
Wavertreelad
Member
 
Join Date: 24 Feb 2013
Posts: 665
Default

It looks like freight is going to return to the Kirkby to Wigan line six days a week as Potter Logistics reopen their Knowsley terminal.

The first freight train since 2006 last week came through Potter Logistics’ Knowsley rail freight terminal, just east of Liverpool in the northwest of England, in a revival of regular services at the site.

A new twice-daily train service will operate five days per week and once on Saturdays and will initially move freight from Knowsley Industrial Park to the northeast of England.

Following work by Network Rail, the Potter Logistics site is now reconnected to the West Coast mainline at Wigan and onto the rest of the UK network including Europe via the Channel tunnel. This presents several rail freight opportunities for the development land at the terminal, the company claimed.

Potter Logistics managing director Matthew Lamb commented: “We are delighted that the Knowsley train terminal connection has reopened, which allows Potter Logistics to further extend its rail activities. Freight trains into Knowsley represent a significant milestone for the terminal and opens up the adjacent terminal land for rail freight usage.”

Founded in 1965, Potter Logistics employs around 300 staff providing specialist logistics solutions focusing on the chemical, agricultural, pharmaceutical and food industries. Potter Logistics operates six distribution centres located in Droitwich, Ely, Knowsley, Ripon, Selby and York.




http://www.lloydsloadinglist.com/fre...m#.V3q-vY-cE5s
Wavertreelad is offline   Reply With Quote
Old 5th July 2016, 19:53   #24
8A Rail
Member
 
8A Rail's Avatar
 
Join Date: 6 Dec 2012
Location: Liverpool
Posts: 568
Default

Quote:
Originally Posted by Wavertreelad View Post
It looks like freight is going to return to the Kirkby to Wigan line six days a week as Potter Logistics reopen their Knowsley terminal.

The first freight train since 2006 last week came through Potter Logistics’ Knowsley rail freight terminal, just east of Liverpool in the northwest of England, in a revival of regular services at the site.

A new twice-daily train service will operate five days per week and once on Saturdays and will initially move freight from Knowsley Industrial Park to the northeast of England.

Following work by Network Rail, the Potter Logistics site is now reconnected to the West Coast mainline at Wigan and onto the rest of the UK network including Europe via the Channel tunnel. This presents several rail freight opportunities for the development land at the terminal, the company claimed.

Potter Logistics managing director Matthew Lamb commented: “We are delighted that the Knowsley train terminal connection has reopened, which allows Potter Logistics to further extend its rail activities. Freight trains into Knowsley represent a significant milestone for the terminal and opens up the adjacent terminal land for rail freight usage.”

Founded in 1965, Potter Logistics employs around 300 staff providing specialist logistics solutions focusing on the chemical, agricultural, pharmaceutical and food industries. Potter Logistics operates six distribution centres located in Droitwich, Ely, Knowsley, Ripon, Selby and York.

http://www.lloydsloadinglist.com/fre...m#.V3q-vY-cE5s
I think they are referring to the "Binliners" to be honest which the first trial trains already operated. The rail image in the article is actually one of those trains too. The frequency of the service and destination as per article co-incides with the "binliner" schedules and Wilton, being in the North East also.

Now if is anything else, then it has been kept very quiet indeed and would be "news" indeed.
__________________
Doug (8A Rail) - Website:-http://www.8arail.uk
8A Rail is offline   Reply With Quote
Old 6th July 2016, 06:00   #25
Wavertreelad
Member
 
Join Date: 24 Feb 2013
Posts: 665
Default

Quote:
Originally Posted by 8A Rail View Post
I think they are referring to the "Binliners" to be honest which the first trial trains already operated. The rail image in the article is actually one of those trains too. The frequency of the service and destination as per article co-incides with the "binliner" schedules and Wilton, being in the North East also.

Now if is anything else, then it has been kept very quiet indeed and would be "news" indeed.
Yes as far as I know it is the binliner trains and it reality it is just confirmation that the service is going to run but at least it is step in the right direction. It will be interesting to see if the adjacent Peel site provides further traffic in the longer term.

http://peellogistics.co.uk/sites/kno.../#.V3ybto-cE5s
Wavertreelad is offline   Reply With Quote
Old 6th February 2017, 22:21   #26
Wandering pete
Member
 
Join Date: 19 Nov 2015
Posts: 23
Default

The Knowsley to Wilton binliner doesn't seem to be running at the moment ...nothing for a couple of weeks or so...pre Christmas there were often 2 trains a day...Anyone know what's (not)occurring.....??
Wandering pete is offline   Reply With Quote
Old 6th February 2017, 22:26   #27
Bevan Price
Established Member
 
Bevan Price's Avatar
 
Join Date: 22 Apr 2010
Posts: 2,648
Default

Quote:
Originally Posted by Wandering pete View Post
The Knowsley to Wilton binliner doesn't seem to be running at the moment ...nothing for a couple of weeks or so...pre Christmas there were often 2 trains a day...Anyone know what's (not)occurring.....??
Not sure if it is accurate, but I have heard that there are "problems with the loading equipment" at Knowsley.
Bevan Price is online now   Reply With Quote
Old 7th February 2017, 00:45   #28
Geeves
Member
 
Join Date: 6 Jan 2009
Location: Rochdale
Posts: 532
Default

Ha yes I had heard the same problem as Bevan I think. Some kind of damage to the actual building during a 'shunting mishap'.
Geeves is online now   Reply With Quote
Old 17th February 2017, 15:57   #29
Wandering pete
Member
 
Join Date: 19 Nov 2015
Posts: 23
Default

Looks like the return of the Binliner...66 worked down LE from Tees Yard in the usual morning path today..17 th Feb...heading for Knowsley.Interesting to see a Pathfinder Tours scheduled to visit the Knowsley terminal on the 11th March as part of a railtour.
Wandering pete is offline   Reply With Quote
Old 19th February 2017, 07:45   #30
childwallblues
Member
 
Join Date: 3 Jul 2014
Location: Liverpool, UK
Posts: 988
Default

I wonder what the Merseyside Waste Authority has been doing with the waste pro tem?
__________________
Last new unit: 170508 Telford Central-Birmingham New Street
childwallblues is offline   Reply With Quote
Reply

Bookmarks

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump



All times are GMT. The time now is 22:12.
Powered by vBulletin® Version 3.8
© RailUK Forums 2005 - 2017