Nice to see the original abutment exposed after all these years. Good to see how quickly things are starting to move on too.
How many people are working on the ground at any one time do you think Phil?
Cowley is offline   Reply With Quote
Registered users do not see these banners - join today!
Old 5th April 2017, 07:09   #92
Flying Phil
Member
 
Join Date: 18 Apr 2016
Posts: 190
Default

Quote:
Originally Posted by Cowley View Post
Nice to see the original abutment exposed after all these years. Good to see how quickly things are starting to move on too.
How many people are working on the ground at any one time do you think Phil?
I have seen there are about 6 - 8 people on site, but I think it varies as to what jobs are being done at the time.
Flying Phil is offline   Reply With Quote
Old 6th April 2017, 15:19   #93
Flying Phil
Member
 
Join Date: 18 Apr 2016
Posts: 190
Default

The site was quiet today but more work has been done. The timbers are in place ready for pile driving on the North abutment site



and the lowered top of the Preci Spark car park is a lot tidier.



I also went to the North of L'bro shed and the clean up there has continued.
The next job I think will be the removal of the old 35025 Brocklebank Line shed.

Flying Phil is offline   Reply With Quote
Old 6th April 2017, 22:08   #94
Cowley
I'm only here to relax
Established Member
 
Cowley's Avatar
 
Join Date: 14 Apr 2016
Location: Devon
Posts: 1,703
Default

Phil - The photo with the bridge works, the 222 and Brush works in the background is pretty special. It's a moment in time photo when you think about it (like I seem to be doing ).
One to look back on in a few years and place alongside a picture from the early 60s and a picture of when the first train crosses the new bridge in a few years time...
Cowley is offline   Reply With Quote
Old 7th April 2017, 10:35   #95
Flying Phil
Member
 
Join Date: 18 Apr 2016
Posts: 190
Default

Glad that you liked the picture Cowley - Interestingly, just as I arrived, there was a short loco stock train going through which I only glimpsed, with three old diesel locomotives, possibly a 47, 31 and something else????
However, it would be really historic and iconic, if the bridge could be in use in March 2019 as that would be 120 years since the GCR opened to London for passenger trains. I doubt that the gap would be closed, but the bridge itself should be in, and could be connected to the North and so to the Chord to the MML.........
Flying Phil is offline   Reply With Quote
Old 11th April 2017, 14:31   #96
Flying Phil
Member
 
Join Date: 18 Apr 2016
Posts: 190
Default

Exciting times!
There is now a giant pile boring lorry on the North abutment site and the steel Reinforcement bars are being made up for the deep piles. there is also another heap of spoil - ready to build up the embankment later?

the Preci Spark site has been levelled further and is being made accessible for the boring lorry?



Flying Phil is offline   Reply With Quote
Old 11th April 2017, 22:37   #97
L+Y
Member
 
Join Date: 4 Jul 2011
Posts: 163
Default

Thanks again for the updates, Phil!
L+Y is offline   Reply With Quote
Old 12th April 2017, 13:33   #98
fflint
Member
 
Join Date: 16 Apr 2012
Posts: 67
Default

Keep up the good work Phil.
fflint is offline   Reply With Quote
Old 12th April 2017, 13:39   #99
Flying Phil
Member
 
Join Date: 18 Apr 2016
Posts: 190
Default

More progress as more equipment is on site and more Re-Bar piling has been made

This is the big pile of spoil mentioned before at the North abutment site.

The South abutment has some of the Re-Bar work


The Preci Spark car park area is having stone chippings laid to 20cm depth. This will be where the big bridge lift crane will be situated later on.

No piling holes have been drilled yet though, possibly started by the end of the week.
Flying Phil is offline   Reply With Quote
Old 19th April 2017, 13:57   #100
Flying Phil
Member
 
Join Date: 18 Apr 2016
Posts: 190
Default

After the Easter break there is more action on the "Gap" site. The Pile Drilling lorry is now correctly located and about to start drilling.


The Preci Spark car park has been completely covered in chippings and the Pile Re-Bars are being assembled ready to drop into the holes (When drilled)

Flying Phil is offline   Reply With Quote
Old 19th April 2017, 14:32   #101
Cowley
I'm only here to relax
Established Member
 
Cowley's Avatar
 
Join Date: 14 Apr 2016
Location: Devon
Posts: 1,703
Default

Thanks for updating us Phil. The first photo gives a good impression of what needs to be bridged. It's a big gap looking from that angle.
Cowley is offline   Reply With Quote
Reply

Bookmarks

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump



All times are GMT. The time now is 07:20.
Powered by vBulletin® Version 3.8
© RailUK Forums 2005 - 2017