Basingstoke Resignalling Project is also running late, last i heard of it, was that phase 3 had been postponed until porstmouth was sorted...
Phase 3 due to go live Easter 2010 I believe, nearly two years late. I'd heard it was because after the disaster of Port Talbot and Portsmouth at the same time, NR would not commission two signalling schemes at the same time again. As other schemes were already pencilled in, Basingstoke Phase 3 was kicked back two years to a vacant slot, even though installation was well advanced (i.e. signals and cabling in place). There will still be work after this I'd imagine, removing redundant equipment and cabling, plus decommissioning the old Signal Box (YW).
__________________
Helvellyn is offline  
Sponsored links - Registered users do not see these banners - join today!
Unread 13th December 2009, 20:31   #17
SWT Driver
Awaiting Email Confirmation
 
Join Date: 29 Aug 2009
Location: The Twiglet Zone.
Posts: 777
Default

Oh well another BARS day coming up Easter 2010!
SWT Driver is offline  
Closed Thread

Bookmarks

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump



All times are GMT. The time now is 20:17.
Powered by vBulletin® Version 3.8.7
Copyright © 2000 - 2013, Jelsoft Enterprises Ltd.
© RailUK Forums 2005 - the year after 2012