Old 8th March 2011, 13:08   #1
LNW-GW Joint
Established Member
 
Join Date: 22 Feb 2011
Location: Mold, Clwyd
Posts: 4,302
Default North West Electrification

Network Rail have "broken silence" and published a note on plans and progress.

http://www.networkrailmediacentre.co...chCategoryID=5

Looks like Preston-Blackpool will open before Manchester-Preston.

Bridgework on the Chat Moss line to start this month.

Richard
LNW-GW Joint is offline  
Sponsored links - Registered users do not see these banners - join today!
Old 8th March 2011, 14:15   #2
tbtc
I am the passenger...
Established Member
 
tbtc's Avatar
 
Join Date: 16 Dec 2008
Location: Sheffield
Posts: 13,357
Default

Quote:
Originally Posted by LNW-GW Joint View Post
Looks like Preston-Blackpool will open before Manchester-Preston
Seems strange to me as there will be no EMUs which will be able to use the line west of Preston until the lines to/from Manchester/Liverpool are electrified. Still, good that they are starting it
tbtc is offline  
Old 8th March 2011, 14:21   #3
LNW-GW Joint
Established Member
 
Join Date: 22 Feb 2011
Location: Mold, Clwyd
Posts: 4,302
Default

Manchester-Preston/Blackpool will be able to run under the wires via Parkside and Wigan while the Bolton route is being wired.
LNW-GW Joint is offline  
Old 8th March 2011, 14:25   #4
tbtc
I am the passenger...
Established Member
 
tbtc's Avatar
 
Join Date: 16 Dec 2008
Location: Sheffield
Posts: 13,357
Default

Ah, so the Newton le Willows line is being done first? Makes sense then

(apologies, am at work, so didn't click on the document link)
tbtc is offline  
Old 8th March 2011, 14:30   #5
scrapy
Member
 
Join Date: 15 Dec 2008
Posts: 342
Default

EMU's would be able to work on the Liverpool - St Helens - Wigan - Preston - Blackpool route though. There may also be some EMU's routed Manchester - Eccles - Wigan - Preston - Blackpool, as the line through the Farnworth tunnels will probably have to be closed for a lengthy period for electrificatiion.
scrapy is offline  
Old 8th March 2011, 14:43   #6
jonesy3001
Established Member
 
jonesy3001's Avatar
 
Join Date: 13 Jul 2009
Location: Morecambe
Posts: 1,316
Default

Wonder what EMU's will work the routes when the OHL work is completed??
jonesy3001 is offline  
Old 8th March 2011, 14:44   #7
gordonthemoron
Established Member
 
gordonthemoron's Avatar
 
Join Date: 4 Sep 2006
Location: Milton Keynes
Posts: 4,107
Default

thameslink cascades?
gordonthemoron is offline  
Old 8th March 2011, 14:56   #8
anthony263
Established Member
 
anthony263's Avatar
 
Join Date: 19 Aug 2008
Location: South Wales
Posts: 4,967
Default

Quote:
Originally Posted by jonesy3001 View Post
Wonder what EMU's will work the routes when the OHL work is completed??
The class 319's were to be cascaded from thameslink by new stock and would either go to FGW or up to Northern.

Speaking of the new thameslink stock any idea when the 1st new trainsis likely to appear in service?
anthony263 is offline  
Old 8th March 2011, 15:31   #9
jonesy3001
Established Member
 
jonesy3001's Avatar
 
Join Date: 13 Jul 2009
Location: Morecambe
Posts: 1,316
Default

Are northern still getting the other 323's from LM or is that on the back burner?
Also will TPE be getting EMU's for the scotland services to free up 185's for the yorkshire routes?
jonesy3001 is offline  
Old 8th March 2011, 16:25   #10
ajax103
Established Member
 
ajax103's Avatar
 
Join Date: 28 Apr 2009
Posts: 4,277
Default

Quote:
Originally Posted by anthony263 View Post
The class 319's were to be cascaded from thameslink by new stock and would either go to FGW or up to Northern.

Speaking of the new thameslink stock any idea when the 1st new trainsis likely to appear in service?
If you've got this month's issue of Rail, it goes into a bit of detail about Network Rail's new ERTMS testing facility at Hertford North where the signalling tests will be performed on a 5 mile section of track leaving the other track for regular services to use.

Tied in with this, Network Rail has explained on a recent visit that a lot more drivers are to be based/working at Hertford North in connection with these tests meaning new staff accommodation is urgently needed as the existing accommodation isn't suitable.

It also says that a 313, believed to be 313123 is to be used as the test train during this period.

As to the new Greater Thameslink EMUs, I believe one will be tested on the Hertford Loop - when though I don't know but at a guess 2013 at the earliest.
__________________
Platform Dispatcher of the Year 2008 | Honorary Saltley Man | Birdsong Radio - A peaceful Dawn Chorus broadcast live over the internet
ajax103 is offline  
Old 8th March 2011, 19:00   #11
WatcherZero
Established Member
 
Join Date: 26 Feb 2010
Posts: 5,544
Default

Thameslink order to be announced this year with first delivery approx 24 months later. So 2013/14 though with refurb required probably not significant numbers of cascades avaliable to enter service until 2015.
WatcherZero is online now  
Old 8th March 2011, 19:57   #12
tbtc
I am the passenger...
Established Member
 
tbtc's Avatar
 
Join Date: 16 Dec 2008
Location: Sheffield
Posts: 13,357
Default

Quote:
Originally Posted by anthony263 View Post
The class 319's were to be cascaded from thameslink by new stock and would either go to FGW or up to Northern
There are more than enough 319s to run both the Thames Valley services and the Lancashire Triangle (based on current plans/ operating levels).

However the "Thameslink will have some spare 319s" + "newly electrified lines will need EMUs" = "319s go to Thames Valley/ Lancashire Triangle" equation isn't guaranteed. 319s could go elsewhere (with other older EMUs moving west/north instead)
tbtc is offline  
Old 8th March 2011, 22:07   #13
ajax103
Established Member
 
ajax103's Avatar
 
Join Date: 28 Apr 2009
Posts: 4,277
Default

Quote:
Originally Posted by tbtc View Post
There are more than enough 319s to run both the Thames Valley services and the Lancashire Triangle (based on current plans/ operating levels).

However the "Thameslink will have some spare 319s" + "newly electrified lines will need EMUs" = "319s go to Thames Valley/ Lancashire Triangle" equation isn't guaranteed. 319s could go elsewhere (with other older EMUs moving west/north instead)
What interests me is if Southern take over the existing TL Inners (St Albans to Luton via Sutton services and run it as proposed between Blackfriars and Blackfriars via Sutton instead.

If this is the case then would we NOT see the NXEMUs on the loop as they wouldn't actually be part of the Thameslink route as such and so any rolling stock would to be Southern's responsibility and not whoever succeeds FCC.

This being the case, they might decide to keep a small fleet of 319s for the Suttons - after all the 375/6s operated by South Eastern have both AC and DC equipment and they're only used on 3rd rail routes.

As to the GN, I'm sure the basic understanding is for the 365s to stay or be replaced by 377s with the 321s and 317s moving elsewhere.

Now if 319s don't end up going to work the Lancashire Triangle, then it probably would be better if Northern or their successor asked for the 321s from FCC to bolster their own 321 fleet especially as brand new EMUs would be a rarity.
__________________
Platform Dispatcher of the Year 2008 | Honorary Saltley Man | Birdsong Radio - A peaceful Dawn Chorus broadcast live over the internet
ajax103 is offline  
Old 9th March 2011, 01:16   #14
WatcherZero
Established Member
 
Join Date: 26 Feb 2010
Posts: 5,544
Default

How many would be needed for commuter services on the GWML, e.g. Oxford?
WatcherZero is online now  
Old 9th March 2011, 22:27   #15
bluenoxid
Established Member
 
Join Date: 9 Feb 2008
Posts: 1,434
Default

Quote:
Originally Posted by tbtc View Post
Seems strange to me as there will be no EMUs which will be able to use the line west of Preston until the lines to/from Manchester/Liverpool are electrified. Still, good that they are starting it
*cough*

Fits in well with the governments West Coast Track Access bid for the new West Coast franchise with trains to Blackpool. Goodbye Voyagers, goodbye.
bluenoxid is offline  
Closed Thread

Bookmarks

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump



All times are GMT +1. The time now is 15:22.
Powered by vBulletin® Version 3.8.8
Copyright © 2000 - 2014, Jelsoft Enterprises Ltd.
© RailUK Forums 2005 - 2014