Default Gravesend station rebuild approved. new 12 car central platform











Rational Plan is offline  
Sponsored links - Registered users do not see these banners - join today!
Old 23rd September 2012, 18:31   #2
yorksrob
Established Member
 
yorksrob's Avatar
 
Join Date: 6 Aug 2009
Location: Yorks
Posts: 7,656
Default

That's certainly an interesting reuse of existing space. I'm guessing the new island platform will be fairly narrow.
__________________
Let the train take the strain...
yorksrob is online now  
Old 23rd September 2012, 18:37   #3
Rational Plan
Member
 
Join Date: 3 Aug 2011
Posts: 189
Default

Quote:
Originally Posted by yorksrob View Post
That's certainly an interesting reuse of existing space. I'm guessing the new island platform will be fairly narrow.
Yes, it has railings on one side.
Rational Plan is offline  
Old 23rd September 2012, 18:53   #4
John55
Member
 
Join Date: 24 Jun 2011
Location: South East
Posts: 800
Default

Quote:
Originally Posted by Rational Plan View Post
Yes, it has railings on one side.
There are some more detailed drawings on Gravesham Council's website. Platform is about 5m wide with the fence about 0.5m from one edge.
John55 is offline  
Old 23rd September 2012, 18:56   #5
MidnightFlyer
Resident minarchist
Established Member
 
MidnightFlyer's Avatar
 
Join Date: 16 May 2010
Location: North / Midlands
Posts: 11,055
Default

Quote:
Originally Posted by John55 View Post
There are some more detailed drawings on Gravesham Council's website. Platform is about 5m wide with the fence about 0.5m from one edge.
Are there any links? I've had a quick flick through the website but can't find anything.
MidnightFlyer is offline  
Old 23rd September 2012, 19:28   #6
John55
Member
 
Join Date: 24 Jun 2011
Location: South East
Posts: 800
Default

Quote:
Originally Posted by MattE2010 View Post
Are there any links? I've had a quick flick through the website but can't find anything.
I just typed in railway station on the search facility on their planning page.

http://plan.gravesham.gov.uk/online-...=LS4ENHHP05800
John55 is offline  
Old 23rd September 2012, 20:30   #7
jopsuk
Established Member
 
Join Date: 13 May 2008
Posts: 8,064
Default

the illustrative "photo montages" (they're neither!) show the fenced off side of the platform as having a platform edge that, were the fence removed, would be usable. This seems a bit odd?
jopsuk is offline  
Old 23rd September 2012, 21:36   #8
cyclebytrain
Member
 
Join Date: 11 Jul 2009
Posts: 259
Default

Whilst I've come to accept that this plan is making the best of a bad job; I still really don't like it.
cyclebytrain is offline  
Old 24th September 2012, 07:00   #9
jopsuk
Established Member
 
Join Date: 13 May 2008
Posts: 8,064
Default

Care to expand on your objections? I don't really know the area.
jopsuk is offline  
Old 24th September 2012, 07:47   #10
cyclebytrain
Member
 
Join Date: 11 Jul 2009
Posts: 259
Default

The Metro services that currently terminate on the down platform will (presumably) go into the new bay -making them the wrong side of the station for the bus stop and the multi storey car park (although the right side for the station car park).

Whelchairs/bikes/pushchairs etc. for up trains are going to have to either go round the end of the bay, or use a lift. And the island is going to be narrow, so difficult to get a wheelchair up to the other end in the rush hour, especially when half the platform are waiting for the next HS/metro rather than the one currently in the platform.

The shops will now be on only the bay platform, ditto toilets, etc. (not room to put them on the island.

In summary, I don't think it's going to work very well; but I also see no other way of getting the extra platform length in there
cyclebytrain is offline  
Old 25th September 2012, 11:48   #11
cle
Established Member
 
Join Date: 17 Nov 2010
Posts: 1,142
Default

No C word in the release/summary. But obviously useful.
cle is offline  
Old 25th September 2012, 22:59   #12
Lexicon10uk
New Member
 
Join Date: 25 Sep 2012
Posts: 1
Smile

Quote:
Originally Posted by cyclebytrain View Post
Wheelchairs/bikes/pushchairs etc. for up trains are going to have to either go round the end of the bay, or use a lift. And the island is going to be narrow, so difficult to get a wheelchair up to the other end in the rush hour, especially when half the platform are waiting for the next HS/metro rather than the one currently in the platform.

The shops will now be on only the bay platform, ditto toilets, etc. (not room to put them on the island.

In summary, I don't think it's going to work very well; but I also see no other way of getting the extra platform length in there


The new central platform is 'single faced' and is (as mentioned earlier) fenced off. This platform is actually wider than both current platforms, although you are correct in noting the lack of any facilities on it - save, seating and an 80 metre modern canopy. There is scope, however, for a coffee/tea kiosk near the new footbridge on this platform and the current shop on platform 1, will be able to extend into the space vacated by the soon to be demolished old footbridge. - although I understand that the owners of the very small Pumpkin shop, are unwilling to invest as such, (after all, they possess a complete monopoly at this station. The space to be soon available on platform 3 (currently platform 2), where the other end of the old footbridge remains in situ for the time being, will also be available for retail - should anyone wish to enquire.

The majority of the station buildings are indeed Grade 11 listed, however, to many, it is now seen as it's achilles heel. The ideal solution would have been to replace the London end road bridge and extend there, or even a replacement 4 platform station altogether. But there we go.
Lexicon10uk is offline  
Closed Thread

Bookmarks

Tags
12 car lengthening, gravesend, kent

Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

BB code is On
Smilies are On
[IMG] code is On
HTML code is Off

Forum Jump



All times are GMT +1. The time now is 12:17.
Powered by vBulletin® Version 3.8.8
Copyright © 2000 - 2014, Jelsoft Enterprises Ltd.
© RailUK Forums 2005 - 2014