YorkshireBear
Established Member
- Joined
- 23 Jul 2010
- Messages
- 8,692
Did anyone see the bristol metro diagram in the latest edition of modern railways? I thought it looked very interesting to be implemented in stages.
For those who havent seen it, it is listed as two phases.
Phase 1 - includes operating 2 cross city lines and one other route.
Cross city: Severn beach - portishead (hourly)
Severn beach - bath spa (hourly)
Portishead - Bristol Temple Meads (hourly)
Phase two includes some station reopenings and two new routes.
Henbury - Bristol Temple Meads (hourly)
Extend weston super mare service beyond bristol parkway to yate.
Local councils hope for this to be included in 2014-2019 high level output specification.
For those who havent seen it, it is listed as two phases.
Phase 1 - includes operating 2 cross city lines and one other route.
Cross city: Severn beach - portishead (hourly)
Severn beach - bath spa (hourly)
Portishead - Bristol Temple Meads (hourly)
Phase two includes some station reopenings and two new routes.
Henbury - Bristol Temple Meads (hourly)
Extend weston super mare service beyond bristol parkway to yate.
Local councils hope for this to be included in 2014-2019 high level output specification.