Does anyone know exactly what improvements are being installed on Tramlink? There's been vague talk and closures in relation to single track sections being doubled (plus all the platform extensions for the new trams) anyone have any more information?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,857
Doubling the current single track between Mitcham and Mitcham Jn is being worked on at the moment, and along with a new platform at Wimbledon should open for autumn I think. There's also work going on on the Elmers End branch this week, I'm not sure what exactly, though it could be for work for the new Route 4 coming soon (Elmers End-Therapia Lane-Elmers End).
--- old post above --- --- new post below ---
Elmers End-Arena is closed this week until Monday, Mitcham-Mitcham Jn is closed Saturday and Sunday.
 
Last edited:

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
Does anyone know exactly what improvements are being installed on Tramlink? There's been vague talk and closures in relation to single track sections being doubled (plus all the platform extensions for the new trams) anyone have any more information?

I think part of the reason they chose Variotram was there wasnt as many physical alterations as they expected there would be, very few if any platform alterations just some signal repositioning and track doubling to increase capacity.
 

robvulpes

Member
Joined
11 Jan 2007
Messages
149
Doubling the current single track between Mitcham and Mitcham Jn is being worked on at the moment, and along with a new platform at Wimbledon should open for autumn I think.

Yes to the doubling (sooner than that I believe, but don't have a specific date); but the new platform is a difficult much longer-term aspiration.

There's also work going on on the Elmers End branch this week, I'm not sure what exactly, though it could be for work for the new Route 4 coming soon (Elmers End-Croydon-Elmers End).

Dualling much of the (short) branch.

Rob
Croydon
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,857
Where would the new platform go? Between the current Tramlink one and the edge of the station presumably? Not in the way of the "Thameslink" line?

As mentioned above, that's a long term version (my error). I'm not sure where it would be located but I suspect that it isn't impossible.
 

Ivo

Established Member
Joined
8 Jan 2010
Messages
7,307
Location
Bath (or Southend)
There's also work going on on the Elmers End branch this week, I'm not sure what exactly, though it could be for work for the new Route 4 coming soon (Elmers End-Croydon-Elmers End).

Hang on - how does that work? Is that not already Route 2? Is the network being redrawn or something?
 

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,857
Hang on - how does that work? Is that not already Route 2? Is the network being redrawn or something?

Nope, it's in addition to provide extra capacity, it actually runs to Therapia Lane on the Wimbledon branch. All in addition to current operations, nothing's being redrawn or altered elsewhere.
 