‘Deteriorating’ Cambridgeshire guided busway may need to be ripped up

Status
Not open for further replies.
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

transportphoto

Established Member
Associate Staff
Quizmaster
Joined
21 Jan 2010
Messages
4,581
For those who are unable to view the website linked in the above post:
The busway, which runs between Cambridge and Huntingdon, has had 11 million passengers since it opened four years ago, but it has been plagued with defects.

A technical report six months ago said the busway, which was built by contractor BAM Nuttall, had £31 million worth of defects - in some places the track has risen four inches - which need to be addressed to tackle the “deteriorating” ride quality.

Next weekend, the section from Addenbrookes’s Hospital to Trumpington will be shut for maintenance.

Speaking to BBC Radio Cambridgeshire, Bob Menzies, service director for strategy and development at Cambridgeshire County Council, said they may be forced to put rubber pads under every beam of the track.

“The ride quality has deteriorated since it opened, and the joints are moving. The last thing we want to do is to have to do this work. But on the other hand we have to make sure it’s maintained and kept safe,” he said.

“It’s a real shame we have this problem, that we’re having to close it over a weekend, having to divert the buses round, and we many have to do more of this in the future.

“Our experts’ view is that eventually we’ll need to fix it all. And it’s a real shame.

“If we (the county council) have to we’ll lift every beam up and put these rubber pads back under each one of them as they should have been done properly in the first place.”

Replacing beams cost several thousand pounds at a time, so replacing 6 million joints could add up to a “very big figure”, Mr Menzies admitted.

The council has already spent £1 million on legal action against Bam Nuttall in a bid to get them to take responsibility over the repairs, Mr Menzies added.

He said: “What we believe should happen is Bam Nuttall should come back and fix it all, and get the ride quality back to where it should have been.

“They’re quite clearly defects. It quite clearly doesn’t comply with the terms of the contract. I’m absolutely clear about that, and so are our lawyers. There’s six thousand joints along the busway - that could add up to a very big figure if you have to fix every one over the course of a number of years. That’s why we’re taking legal action against Bam Nuttall.

“I’d like Bam Nuttall to come clean and accept their responsibilities. But I suspect it won’t. In effect it will take a lot longer than that, knowing the previous history.”

FACTFILE


The initial contract between Cambridgeshire County Council and BAM Nuttall was for 130 weeks of work, with the completion date on February 27, 2009.

But the busway construction was not completed until April 2011 and not open for use until August of that year as the council raised concerns about defects along the guideway.

The council instigated the review into the contract after the project ran into problems and delays, resulting in BAM Nuttall, repaying £33million of the £147m costs to settle a long-running dispute about who should pay for the overspend for the concrete route.

The report found BAM Nuttall did not think the design was as complete as it expected it to be when the contract was awarded.

Involving a consultant to review the design was not value for money and removed responsibility from the contractor’s designer, the report added.
 

ainsworth74

Forum Staff
Staff Member
Global Moderator
Joined
16 Nov 2009
Messages
27,641
Location
Redcar
If only they'd used a proven technology that previously travelled over most of that very same route. Something that uses ballast, sleepers and steel rails with vehicles that have steel wheels. Perhaps you could call it a 'railway'...
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
32,369
Location
A semi-rural part of north-west England
Bearing the matter in mind, will both TfGM and their nominated contractor, Balfour Beatty, have taken on board the lessons to be learnt on the Cambridge entity, on the Leigh Guided Busway project that is currently in the stage of construction?
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
28,047
Location
UK
The council is dealing with a company far bigger than it is, so it could be a lengthy and expensive legal process - with no guarantee of a positive outcome.

These large firms usually have very good legal teams that convince councils to accept contract clauses that sound innocent but are later invoked to avoid or drastically reduce liability.

My parents who consult with housing associations and contractors (who in turn often sub-contact) have seen this sort of thing a billion times before.

Councils that outsource to massive firms, whether it's Serco, Veolia, Mears or whatever, often for 10 or 15 years, really don't have a clue until it's too late.
 

Springs Branch

Established Member
Joined
7 Nov 2013
Messages
1,429
Location
Where my keyboard has no £ key
Bearing the matter in mind, will both TfGM and their nominated contractor, Balfour Beatty, have taken on board the lessons to be learnt on the Cambridge entity, on the Leigh Guided Busway project that is currently in the stage of construction?

A good point. Although it doesn't pass through marshy ground, the area where the Leigh busway is being built has been notorious for subsidence due to collapse of abandoned coal mines beneath.

I recall that one of the reasons put forward by BR for closing the Eccles - Tyldesley - Leigh - Kenyon railway in 1969 was the cost of repairing continuous mining subsidence.
Maybe by now most of the old coal workings have collapsed and it's less of a problem (the subsidence has subsided)?

Further afield, in Adelaide, South Australia, the 7½ mile Adelaide O-Bahn guided busway is approaching 30 years old. Although very substantially built and probably on more favourable ground and in a better climate than Cambridge or Leigh, it is starting to need expensive repairs because of deterioration of the concrete track (accompanied by mutterings by some of "we should have build Light Rail instead").
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
67,750
Location
Yorkshire
They are not known as "misguided busways" for nothing :lol:

I'd recommend anyone who hasn't yet sampled it to give it a go, if nothing else it will convince you such schemes should not be repeated elsewhere.

You get a good view from the front seat of a double-decker. ;)
 

Blindtraveler

Established Member
Joined
28 Feb 2011
Messages
9,641
Location
Nowhere near enough to a Pacer :(
Anyone who has lived in Edinburgh for 10-12 years knows how much of a headake guided busways can be. As many will know, we had a short lived one which now forms part of the tram route. The irony that the busway used to carry one of the citys busyest bus routes, the 22, and now carries a service that many claim is underused is not lost on many of us.

Its a shame this has happened in Cambridge but I agree with Ainsworth74 that rail of any kind would have been better
 

kylemore

Member
Joined
28 Aug 2010
Messages
1,046
Anyone who has lived in Edinburgh for 10-12 years knows how much of a headake guided busways can be. As many will know, we had a short lived one which now forms part of the tram route. The irony that the busway used to carry one of the citys busyest bus routes, the 22, and now carries a service that many claim is underused is not lost on many of us.

Its a shame this has happened in Cambridge but I agree with Ainsworth74 that rail of any kind would have been better

And the Edinburgh one was falling apart by the time it closed as well!

Guided busways - a ludicrous concept.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
24,880
Location
Nottingham
And the Edinburgh one was falling apart by the time it closed as well!

Guided busways - a ludicrous concept.

But based on the last few posts is it the case that the Edinburgh busway was a more cost-effective measure than the tramway that replaced it?
 

ac6000cw

Established Member
Joined
10 May 2014
Messages
3,154
Location
Cambridge, UK
There were good reasons why it was built as a busway - related to how to best serve the transport needs of the areas at each end of the busway itself and financial (like the money wasn't available to build a tramway). These considerations are completely separate from how it was designed and constructed, which is what the current news stories are about.

By the way, the area it travels through is mostly not marsh or drained marshland (fenland).
 

WatcherZero

Established Member
Joined
25 Feb 2010
Messages
10,272
A lot of work had to be redone in the first place because the contractor attempted to skimp on drainage and not meet the councils specified spec which left areas prone to flooding.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
97,783
Location
"Marston Vale mafia"
There were good reasons why it was built as a busway - related to how to best serve the transport needs of the areas at each end of the busway itself and financial (like the money wasn't available to build a tramway). These considerations are completely separate from how it was designed and constructed, which is what the current news stories are about.

True. As it is mostly wide enough, they might have done better to build it as a full width single carriageway tarmac road, rather than the guided bit with cycle path alongside. Proven technology that would have achieved roughly the same thing.
 

kylemore

Member
Joined
28 Aug 2010
Messages
1,046
But based on the last few posts is it the case that the Edinburgh busway was a more cost-effective measure than the tramway that replaced it?

No, because trams need a "track", buses don't. The Lothian 22 bus came off a perfectly good road onto the rapidly flaking concrete of the busway for a couple of miles before going back onto the same road.

Some claim it saved a minute or two due to possible congestion at two junctions on said road but in my extensive experience (unfortunately!) of driving 22s I saw very little evidence of that congestion that could not have been dealt with by much cheaper alternatives.

In short Edinburgh Council's Public Transport Unit consciously spent public money on a Gimmick.
 

IanXC

Emeritus Moderator
Joined
18 Dec 2009
Messages
6,335
I wonder how much will end up being spent on the guided busway in, say, it's first 25 years as compared to a rail solution?
 

MCR247

Established Member
Joined
7 Nov 2008
Messages
9,593
True. As it is mostly wide enough, they might have done better to build it as a full width single carriageway tarmac road, rather than the guided bit with cycle path alongside. Proven technology that would have achieved roughly the same thing.

Why can't there just build a normal road with buffers on it?

This is what I don't get. Why do we need to spend money on a special surface for buses? Why not just a dedicated tarmac road?
 

Teflon Lettuce

Established Member
Joined
22 Aug 2013
Messages
1,750
This is what I don't get. Why do we need to spend money on a special surface for buses? Why not just a dedicated tarmac road?

the idea being that if it is a special surface then other traffic CAN'T use it... however on the Luton busway it's a regular occurance for cars to at least TRY.

I don't see however how anyone can say that the CONCEPT is flawed from the cambridge experience... what seems to be the problem there is poor construction... after all the same system worked well for many years in Essen and the Adelaide O-Bahn was a huge success.

One only has to see how many BILLIONS HS2 is projected to cost (going up all the time) to see why busways are being built in places where a "rail" solution is needed but cannot be justified financially by projected usage.

Horses for courses so to speak
 

Mojo

Forum Staff
Staff Member
Administrator
Joined
7 Aug 2005
Messages
20,391
Location
0035
This is what I don't get. Why do we need to spend money on a special surface for buses? Why not just a dedicated tarmac road?
Because a railway line is narrower than a road. Parts of the route are on embankments, or passing under narrow bridges. If it were a road, buses would have to slow down as they pass each other to avoid crashing.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
38,942
Location
Yorks
the idea being that if it is a special surface then other traffic CAN'T use it... however on the Luton busway it's a regular occurance for cars to at least TRY.

I don't see however how anyone can say that the CONCEPT is flawed from the cambridge experience... what seems to be the problem there is poor construction... after all the same system worked well for many years in Essen and the Adelaide O-Bahn was a huge success.

One only has to see how many BILLIONS HS2 is projected to cost (going up all the time) to see why busways are being built in places where a "rail" solution is needed but cannot be justified financially by projected usage.

Horses for courses so to speak

The fact is, Cambridge - St Ives already had a railway in place, so wouldn't have cost anything like the billions required for HS2 to bring it back into use. A lot of it had to do with the Government of the day's luke warm attitude to rail. Had the route been in Scotland where Governments have taken a more enlightened attitude to public transport, it would have got the rail solution that residents wanted in the first place.

Horses for courses was briefly considered in the 1980's but dismissed since rail passengers, not unreasonably, preferred to travel by train. Cheap and nasty would be a better description for the rash of guided busway conversions forced on local authorities during the noughties.
 

Teflon Lettuce

Established Member
Joined
22 Aug 2013
Messages
1,750
The fact is, Cambridge - St Ives already had a railway in place, so wouldn't have cost anything like the billions required for HS2 to bring it back into use. A lot of it had to do with the Government of the day's luke warm attitude to rail. Had the route been in Scotland where Governments have taken a more enlightened attitude to public transport, it would have got the rail solution that residents wanted in the first place.

Horses for courses was briefly considered in the 1980's but dismissed since rail passengers, not unreasonably, preferred to travel by train. Cheap and nasty would be a better description for the rash of guided busway conversions forced on local authorities during the noughties.

maybe the public did want the railway re-instated... but would it have been cost effective?

the truth is that most guided busways so far have been short sections to give buses a quick way through traffic bottlenecks (Crawley, Ispwich, Edinburgh)

so far the only 2 operational busways that cover ground that could be covered by rail are the cambridge and luton ones.

In the case of cambridge, being a deeply rural area albeit with large commuter flows I doubt there would ever be the passenger numbers to make it a viable rail route. As for luton all that would've been feasible as a rail route is a detached shuttle due to the layout and topography of the junction with the main line. It would've cost millions just to re-align and rebuild the junction.

I am sure (or would hope) that the councils did their due diligence to cost out all the options against projected passenger flows.

To castigate the busway option as cheap and nasty shows that you have a natural bias towards rail.... probably rail or nothing.... I wonder what the passengers would say given the option of rail or nothing? I'm sure they wouldn't choose "nothing"

As I said above the system used in luton and cambridge has worked well in other parts of the world... so the problem isn't the system or idea of busways in use.... it is the poor execution in the construction..

all a guided busway is is a rubber tyred tram.... seeing as though Paris has managed for years with rubber tyred trains I don't see why people are so anti busway when the only other viable option is "nothing at all"
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
38,942
Location
Yorks
maybe the public did want the railway re-instated... but would it have been cost effective?

the truth is that most guided busways so far have been short sections to give buses a quick way through traffic bottlenecks (Crawley, Ispwich, Edinburgh)

so far the only 2 operational busways that cover ground that could be covered by rail are the cambridge and luton ones.

Quite. Guided busways are suitable for short urban stretches of the type we have in Leeds (providing there is enough land available without destroying the fabric/character of the area.

They are not suitable for longer distance inter-urban routes that travel through rural areas.

I am sure (or would hope) that the councils did their due diligence to cost out all the options against projected passenger flows.

Government policy not only sets out not only what goes into the benefit/cost calculation, but has also conspired to ensure that the revenue costs of running a railway are as high as possible, which is why re-openings were quite common during the late eighties and early nineties and why busways were forced on routes such as Cambridge-St Ives which should have been rail more recently. Rubbish policy masquerading as an " objective" calculation.

To castigate the busway option as cheap and nasty shows that you have a natural bias towards rail.... probably rail or nothing.... I wonder what the passengers would say given the option of rail or nothing? I'm sure they wouldn't choose "nothing"

It's simply not good enough to say that people should put up with a busway or nothing. They should demand a change to the policies that unnecessarily inflate the cost of the rail option.
 
Last edited:

Teflon Lettuce

Established Member
Joined
22 Aug 2013
Messages
1,750
They are not suitable for longer distance inter-urban routes that travel through rural areas.

again I point to Adelaide where the distance is similar

It's simply not good enough to say that people should put up with a busway or nothing. They should demand a change to the policies that unnecessarily inflate the cost of the rail option.

why not? you appear to argue that the only choice should be rail and if that choice is unaffordable then the only other option is nothing...

I think what I said was that if rail is not feasible for any reason then a busway should be considered... so if people want a railway reinstated and the money isn't there or the demand wouldn't be high enough then the option should be busway.

of course... IF the traffic generated then makes rail a viable option it can always be converted at a later date.

there is too much "rail or nothing" arguments with public transport funding. Here where I live in rural west wales there is a vociferous campaign to reinstate the Aberystwyth- Carmarthen railway line... blindly ignoring all the facts such as much of the land has been sold off... more has been built over... and there aren't even enough prospective passengers (unless you start counting the sheep!) to make an hourly normal bus service commercially viable!

again my point is missed.... that the CONCEPT isn't flawed... in the case of the Cambridge busway it is clear that it is the EXECUTION ie the build quality... remember Cambridgeshire County Council have been in dispute with the contractors since BEFORE the busway was completed... and that the busway's opening was delayed by over a year due to build quality issues...

The news item that started this thread was just another small step in this long running dispute.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
38,942
Location
Yorks
again I point to Adelaide where the distance is similar



why not? you appear to argue that the only choice should be rail and if that choice is unaffordable then the only other option is nothing...

I think what I said was that if rail is not feasible for any reason then a busway should be considered... so if people want a railway reinstated and the money isn't there or the demand wouldn't be high enough then the option should be busway.

of course... IF the traffic generated then makes rail a viable option it can always be converted at a later date.

there is too much "rail or nothing" arguments with public transport funding. Here where I live in rural west wales there is a vociferous campaign to reinstate the Aberystwyth- Carmarthen railway line... blindly ignoring all the facts such as much of the land has been sold off... more has been built over... and there aren't even enough prospective passengers (unless you start counting the sheep!) to make an hourly normal bus service commercially viable!

again my point is missed.... that the CONCEPT isn't flawed... in the case of the Cambridge busway it is clear that it is the EXECUTION ie the build quality... remember Cambridgeshire County Council have been in dispute with the contractors since BEFORE the busway was completed... and that the busway's opening was delayed by over a year due to build quality issues...

The news item that started this thread was just another small step in this long running dispute.

You are incorrect to suggest that it is a case of "rail or nothing" when I have stated that there are places where busways work very well - notably short urban routes around congestion bottlenecks, such as in my own local area of area of Leeds.

You also fixate on the issue of affordability, conveniently ignoring the fact that particularly on our railway, affordability is very much affected by Government policy. Think track access charges, rolling stock leasing costs, rolling stock shortages, all of which push up the cost unnecessarily.

Whether traffic generated makes rail "a viable option" is also down to Government policy in how the sums are added up. This notably differs not only between different countries within the UK, but also, as HS2 illustrates, between different rail projects within England. There is no hard and fast objective formula for what constitutes a "viable option". The only way there would be an objective definition of viability would be to go back to the Beeching idea of all lines paying for themselves directly through farebox revenue, yet we choose to subsidise routes for the greater public good, so this is clearly not an option.
 

ac6000cw

Established Member
Joined
10 May 2014
Messages
3,154
Location
Cambridge, UK
maybe the public did want the railway re-instated... but would it have been cost effective?

the truth is that most guided busways so far have been short sections to give buses a quick way through traffic bottlenecks (Crawley, Ispwich, Edinburgh)

so far the only 2 operational busways that cover ground that could be covered by rail are the cambridge and luton ones.

In the case of cambridge, being a deeply rural area albeit with large commuter flows I doubt there would ever be the passenger numbers to make it a viable rail route. As for luton all that would've been feasible as a rail route is a detached shuttle due to the layout and topography of the junction with the main line. It would've cost millions just to re-align and rebuild the junction.

I am sure (or would hope) that the councils did their due diligence to cost out all the options against projected passenger flows.

To castigate the busway option as cheap and nasty shows that you have a natural bias towards rail.... probably rail or nothing.... I wonder what the passengers would say given the option of rail or nothing? I'm sure they wouldn't choose "nothing"

As I said above the system used in luton and cambridge has worked well in other parts of the world... so the problem isn't the system or idea of busways in use.... it is the poor execution in the construction..

all a guided busway is is a rubber tyred tram.... seeing as though Paris has managed for years with rubber tyred trains I don't see why people are so anti busway when the only other viable option is "nothing at all"

Exactly.

It's not a perfect solution - nothing ever is, there always have to be compromises in the real world.

In relation to the Cambridge area busway, the heavy rail option would almost certainly have been the worst one due to high operating costs in relation to service frequency and no ability to directly serve the central part of Cambridge. It would likely have required a complete rebuilding to modern standards of what was only ever a single-track branch line (and of which the extension earthworks to Huntingdon station from St.Ives had been partly obliterated - not least by the current A14 road).

In the current timetable, off-peak Mon-Sat there are 8 buses per hour between St.Ives and Cambridge city centre in each direction - and that is higher frequency than when it opened due to it's popularity (it carried 3.5 million passengers in the year up to August 2014). Once the 'Cambridge North' railway station opens (to which the busway will be extended) I'd expect those passenger numbers to increase noticeably because people will be able to go directly from (fast) bus from St.Ives etc. to train.

It seems to be mostly outsiders who criticise it - the locals just happily use it ;)
 
Last edited:

Teflon Lettuce

Established Member
Joined
22 Aug 2013
Messages
1,750
The only way there would be an objective definition of viability would be to go back to the Beeching idea of all lines paying for themselves directly through farebox revenue, yet we choose to subsidise routes for the greater public good, so this is clearly not an option.

and what is wrong with that? it is the standard that buses have had to abide by for the last 30 years (with the feeble sop that councils can buy back limited "socially neccessary" services.... IF they can find the money)

whats good for the goose....
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
38,942
Location
Yorks
and what is wrong with that? it is the standard that buses have had to abide by for the last 30 years (with the feeble sop that councils can buy back limited "socially neccessary" services.... IF they can find the money)

whats good for the goose....

Go on then. Get your political party of choice to propose another round of Beeching cuts and see how far it gets them.
 
Last edited:

MCR247

Established Member
Joined
7 Nov 2008
Messages
9,593
Because a railway line is narrower than a road. Parts of the route are on embankments, or passing under narrow bridges. If it were a road, buses would have to slow down as they pass each other to avoid crashing.

Oh ok that makes sense. I knew there was a rail route but didn't realise the busway used the same alignment
 