• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Why do I need two tickets?

Status
Not open for further replies.

alexl92

Established Member
Joined
12 Oct 2014
Messages
2,275
I'm travelling later today from Huddersfield to Cottingley. There's no direct train during the day so my options are as follows:

13:59 HUD - DEW (nt)* and then 14:41 DEW - COT (nt), arr 14:54
or
14:27 HUD - LDS (ftpe) and then 15:56 LDS - COT (nt), arr 15:02

The latter is a better fit for me time-wise, but apparently I'd have to buy two separate tickets for it - one to Leeds and then one back to Cottingley. This seems crazy to me - why is it like that? Why can't I just buy a HUD - COT single and travel that way?


*The 14:12 FTPE service from Huddersfield which would have got me to Dewsbury at a better time is cancelled today.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

najaB

Veteran Member
Joined
28 Aug 2011
Messages
30,783
Location
Scotland
The latter is a better fit for me time-wise, but apparently I'd have to buy two separate tickets for it - one to Leeds and then one back to Cottingley. This seems crazy to me - why is it like that? Why can't I just buy a HUD - COT single and travel that way?
Usually when journey planners offer two tickets rather than one it's because the the itinerary isn't a permitted route for the direct A to B ticket.
 

Crossover

Established Member
Joined
4 Jun 2009
Messages
9,253
Location
Yorkshire
On the cancellation, there are signalling problems in Standeege Tunnel - we have just seen a backlog of trains waiting for the signal
 

34D

Established Member
Joined
9 Feb 2011
Messages
6,042
Location
Yorkshire
The simple answer is because going through Cottingley to Leeds and then back to Cottingley is a 'double back' which isn't allowed (in general). See section 3.5 of this forums ticketing FAQ
 

Crossover

Established Member
Joined
4 Jun 2009
Messages
9,253
Location
Yorkshire
The simple answer is because going through Cottingley to Leeds and then back to Cottingley is a 'double back' which isn't allowed (in general). See section 3.5 of this forums ticketing FAQ

Agreed. The problem is the way Northern are screwing around with the service pattern, a double back really isn't all that unreasonable IMO
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
30,783
Location
Scotland
Agreed. The problem is the way Northern are screwing around with the service pattern, a double back really isn't all that unreasonable IMO
If the service pattern means that it's not possible to make a journey without a double-back for large parts of the day, then the TOC(s) concerned should request an easement be added to the routeing guide. It might take Transport Focus or similar to put some pressure on them.
 

clagmonster

Established Member
Joined
8 Jun 2005
Messages
2,442
If the service pattern means that it's not possible to make a journey without a double-back for large parts of the day, then the TOC(s) concerned should request an easement be added to the routeing guide. It might take Transport Focus or similar to put some pressure on them.
The trouble is that the journey can be made without using the double back by changing at Dewsbury all day, however doubling back increases the range of journies available. I would suggest the appropriate thing to do would be:
1) make the current tickets route 'not Leeds' at the current fares
2) introduce a new easement allowing the double back
3) introduce a new Huddersfield-Cottingley route any permitted flow, priced the same as Huddersfield-Leeds.

This would give passengers the flexibility to double back without causing any fare anomolies, and also allow the journey to be done at the current fare using the current permitted routes, thus avoiding a fare rise. Everyone's a winner.
 

kieron

Established Member
Joined
22 Mar 2012
Messages
3,052
Location
Connah's Quay
The trouble is that the journey can be made without using the double back by changing at Dewsbury all day, however doubling back increases the range of journies available. I would suggest the appropriate thing to do would be:
1) make the current tickets route 'not Leeds' at the current fares
2) introduce a new easement allowing the double back
3) introduce a new Huddersfield-Cottingley route any permitted flow, priced the same as Huddersfield-Leeds.
It would work the same if the new route was "via Leeds", except that no new easement would be needed.

This wouldn't have helped alexl92 in the original case, though. The 14:27 he mentioned was 15 minutes late at Huddersfield, 21 at Leeds, meaning that he'd have missed his connection at Leeds and got in an hour later had he taken the later train.

If I was in that situation, I think I would get the first train I saw to Morley and walk from there. While it's a shame that Cottingley gets Leeds-Huddersfield trains in one direction and Leeds-Brighouse ones in the other, this isn't quite as big a problem as the original post might suggest.
 
Status
Not open for further replies.

Top