Passenger lifts: how long to commission?

Status
Not open for further replies.

40907

Member
Joined
17 Nov 2014
Messages
53
A passenger lift was installed alongside the existing footbridge at Hereford station a while ago. As far as I can recall it was complete in January.

Last week I returned by train to Hereford and the lift is still out of use for "safety testing" or similar words.

A member of the station staff acknowledged that it was taking a long time to bring the lift into use, and explained that it was something to do with the "I'm stuck in the lift" call system, which apparently doesn't alert Hereford staff, rather goes through direct to "a centre in Cardiff".

Why is it so complicated and take months to iron out? Anyone had similar experiences elsewhere?

40907
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Altfish

Member
Joined
16 Oct 2014
Messages
1,065
Location
Altrincham
Altrincham Station had a lift fitted in about December/January, it is still not commissioned.
 

Blindtraveler

Established Member
Joined
28 Feb 2011
Messages
9,638
Location
Nowhere near enough to a Pacer :(
Given how many of these are being done at the mo its a tad worrying. Also worrying is how much of a plan have they got for around 15-20 years time when all the ones done in the last few years need replacing?
 

satisnek

Member
Joined
5 Sep 2014
Messages
888
Location
Kidderminster/Mercia Marina
Back in 2007/8 it took months for the new footbridge and lifts at Kidderminster station to be opened to the public. During that time the town's new Morrison's supermarket was built, fitted out and opened.
 

damo44

Member
Joined
13 Feb 2015
Messages
63
Location
Solihull
A replacement footbridge including lifts was built at Shirley (West Mids) last year.

It seemed to be complete around 12 months ago (i.e. workmen left site and it seemed complete to the naked eye), but as of a few days ago the entrance to the new bridge was still fenced off. No idea why.
 

Starmill

Veteran Member
Fares Advisor
Joined
18 May 2012
Messages
23,351
Location
Bolton
Bingley's new lifts sat looking complete for around 7 months before they were finally commissioned. No idea why.
 

dysonsphere

Member
Joined
22 Jan 2013
Messages
518
I guess total lack of intrest by managment, ie weve built it no said anything about using it.
 

route:oxford

Established Member
Joined
1 Nov 2008
Messages
4,949
Lifts at Gleneagles and Dunblane were installed and activiated really quite promptly.
 

driver_m

Established Member
Joined
8 Nov 2011
Messages
2,248
The ones on the southern end of the WCML took an age to be completed.
 

hulabaloo

Member
Joined
5 Apr 2015
Messages
134
It's not right, they were going up double-quick in SE London when the Olympics were round the corner.
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
Network Rail were asked by the local press this week why the Hereford lifts were still not in operation and the same answer was given as before, still testing. Network Rail said should be operative within month.

:cry:
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
28,041
Location
UK
The lifts at Hatfield took MANY months to go live, even though they were seen working a good month or two before. I guess there's a lot of safety certification and other paperwork to sign off.

The multistorey carpark there still doesn't have its lift working, and the car park has been open since before Christmas. It means having to lug bags up/down the stairs, or risk using the ramps used by vehicles.
 

lincolnshire

Member
Joined
12 Jun 2011
Messages
884
Sometimes the lifts can,t be commissioned for other reasons like the lack of sufficient electricity capacity at the station, maybe enough to test them etc on a temporary supply but not put them all into full time operation.

At Lincoln station they installed them and had them running from a generator for quite a few months while the stations electricity supply was upgraded to increase the supply coming into the station for the extra demand from the lifts.
 

PHILIPE

Veteran Member
Joined
14 Nov 2011
Messages
13,472
Location
Caerphilly
I can't turn it up at the moment so relying only on memory, but I'm sure that I read that operative lifts to serve Platforms 1/2 at the improved Cardiff Queen St would not be available until May 2015 although everything else there was completed by last December. (new platforms/signalling etc). May 2015 has now arrived and ATW Journey Check today states lifts to 1/2 not working until further notice. Watch this space, unless anybody has some more info.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
28,041
Location
UK
Sometimes the lifts can,t be commissioned for other reasons like the lack of sufficient electricity capacity at the station, maybe enough to test them etc on a temporary supply but not put them all into full time operation..

I believe this is what caused the delay at Hatfield. Not sure why the one in the car park doesn't work though, as I know the power was upgraded for the whole station redevelopment - which could well be completed in the next couple of months, give or take.

I suspect the lift in the car park will still have a sign saying 'out of order' beyond the grand opening.
 