Lynford1976

Member
Joined
3 Oct 2015
Messages
130
Just wondered if the completion of the works at Reading has resulted in a more reliable service, or if there are still occasional delays?

I used to have friends who lived just up the line and they were always complaining about the service during the works. I suspect it was a contributory factor towards their later divorce...;)

Many thanks
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

D1009

Established Member
Joined
22 Feb 2012
Messages
3,166
Location
Stoke Gifford
Just wondered if the completion of the works at Reading has resulted in a more reliable service, or if there are still occasional delays?

I used to have friends who lived just up the line and they were always complaining about the service during the works. I suspect it was a contributory factor towards their later divorce...;)

Many thanks
In my experience the delays are more occasional than previously.
 

Ironside

Member
Joined
16 Aug 2012
Messages
418
The delays due to the lack of platforms have gone but there are many other reasons for delays and these still have a effect.
 

coppercapped

Established Member
Joined
13 Sep 2015
Messages
3,099
Location
Reading
Just wondered if the completion of the works at Reading has resulted in a more reliable service, or if there are still occasional delays?

I used to have friends who lived just up the line and they were always complaining about the service during the works. I suspect it was a contributory factor towards their later divorce...;)

Many thanks
As far as I am aware, no statistics referring to Reading alone have been published, but global data suggest that GWR's performance is slowly improving. Apart from having more through mainline platforms delays because of crossing movements immediately to the west of the station are also noticeably fewer.

Anecdata would also suggest that the performance of the South Western service to Bracknell and Waterloo and the North Downs service to Gatwick is also better than before as there are now three platforms instead of two with a two track approach rather than a single line bottleneck right at the end of the platforms.

As Ironside says, there are still other causes of delay, as is to be expected. In the past this was often due to signalling problems after weekend engineering work, but even these seem to have been decreasing of late.
 

MarkyT

Established Member
Joined
20 May 2012
Messages
6,245
Location
Torbay
Anecdotally, when I travelled to Reading frequently in years before the upgrade, mostly arriving from the Westbury direction, the epithet "Snooker Junction"(*) seemed most appropriate, as I was almost always stopped or heavily checked on approach. The handful of times I've travelled that way since the rebuild have seen a smooth run in to the up main platforms under the flyover, and the way the parallel tracks either side of the new islands seem able to deal with the flow is impressive often with the train in front departing just as you arrive and the next one drawing in just as you pull away.

* Snooker Junction - a red before any other colour!
 

bnm

Established Member
Joined
12 Oct 2009
Messages
4,996
Infrastructure failings (signals, points) further east are the most common cause of delays now.
 

QueensCurve

Established Member
Joined
22 Dec 2014
Messages
1,912
Infrastructure failings (signals, points) further east are the most common cause of delays now.

These seem to be one of the most common "incidents" on the National Rail Enquiries service updates.
 

cactustwirly

Established Member
Joined
10 Apr 2013
Messages
7,453
Location
UK
My relief Stopping from the East, go straight into the platforms, previously they waited for a few minutes (especially before going into platform 6)
 

DaveNewcastle

Established Member
Joined
21 Dec 2007
Messages
7,387
Location
Newcastle (unless I'm out)
J . . . . they were always complaining about the service during the works. I suspect it was a contributory factor towards their later divorce.
I'm not aware of any studies into the relationship between rail infrastructure work and divorce.

Perhaps you've just hit on an innovative area for research?

And perhaps Network Rail would like to commission a study into their impact on society in terms of benefits and harms to marital relations.

But probably not.

But I am curious as to how their works had contributed to a divorce.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
31,385
But I am curious as to how their works had contributed to a divorce.

Bloke was probably going out at all hours to take photos of the works as they progressed, posting to online forums and all that sort of thing.

Wife thought that was behaving a bit strange for a long period...

QED...
 