• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Eurostar crosses English Channel by ferry!

Status
Not open for further replies.

Cletus

Established Member
Joined
11 Dec 2010
Messages
2,230
Location
Dover
Courtesy of the Port Of Dover twitter account.

CeySAFYWQAAsFeF.jpg
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Phil.

Established Member
Joined
10 Oct 2015
Messages
1,323
Location
Penzance
Good grief how has Eurostar sunk so low? They could have at least waited until it was dark as well as putting a tarpaulin over it.
 

ExRes

Established Member
Joined
16 Dec 2012
Messages
5,824
Location
Back in Sussex
I've heard that the ferry developed a fault and DFDS hired the power car from Eurostar to provide electrical power .......
 

cjmillsnun

Established Member
Joined
13 Feb 2011
Messages
3,254
Not a bad shout but wouldn't they refurb a whole set at a time including power cars and carriages? In which case why not just run the whole train ECS through the tunnel over night?

Probably the same reason that railway carriages are shipped by road over here £££. They'd have to pay Network Rail, Eurotunnel and SNCF for a path. Also it is likely the PCs are being refurbed at a different location to the carriages.
 

dk1

Veteran Member
Joined
2 Oct 2009
Messages
15,913
Location
East Anglia
It's all down to market forces in the same way it's cheaper for fuel to be delivered to many depots by road than by rail. I wouldn't imagine Eurostar would care less who saw it as long as they get it where it needs to be ASAP.
 

najaB

Veteran Member
Joined
28 Aug 2011
Messages
30,782
Location
Scotland
Probably the same reason that railway carriages are shipped by road over here £££. They'd have to pay Network Rail, Eurotunnel and SNCF for a path.
Not if they ran it in service to the correct side of the channel.
 

ExRes

Established Member
Joined
16 Dec 2012
Messages
5,824
Location
Back in Sussex
One thing to bear in mind of course, is it able to be moved by rail?, perhaps it has a major wheelset failure
 

furnessvale

Established Member
Joined
14 Jul 2015
Messages
4,575
I'd be more impressed if Eurotunnel returned a stricken ferry!

I believe in the past, and probably again in the future, Eurotunnel has moved the CONTENTS of ferries (people, cars and lorries) when the ferries have failed, eg inclement weather, so all is not lost.
 

Phil.

Established Member
Joined
10 Oct 2015
Messages
1,323
Location
Penzance
Not a bad shout but wouldn't they refurb a whole set at a time including power cars and carriages? In which case why not just run the whole train ECS through the tunnel over night?

Thus far refurbs have been done ad-hoc by half set and power car individually.
--- old post above --- --- new post below ---
One thing to bear in mind of course, is it able to be moved by rail?, perhaps it has a major wheelset failure

A major state of the art purpose built depot in east London and a power car has to be taken to le continent by road because it can't be attended to there in Temple Mills. C'mon......
--- old post above --- --- new post below ---
Probably the same reason that railway carriages are shipped by road over here £££. They'd have to pay Network Rail, Eurotunnel and SNCF for a path. Also it is likely the PCs are being refurbed at a different location to the carriages.

What has happened in the past is that a power car required for a specific purpose "over there" would be put on a train forming a terminating service there. It's slightly tricky because there's a bit of piggery jokery required computer-wise to get the sets to "talk" to each other.
 

talltim

Established Member
Joined
17 Jan 2010
Messages
2,454
It'd have been impressive if they loaded it onto a lorry and the lorry onto a Chunnel Shuttle train. Suspect it wouldn't have fitted tho'.
 

Peter Mugridge

Veteran Member
Joined
8 Apr 2010
Messages
14,817
Location
Epsom
Ah.... power car 3219 has been spare at Temple Mills for a while; the full set 3219/20 is at Hellemes for refurbishment but with the spare power car 3999. This move now begs the question of whether 3999 is actually being refurbished or not - or if 3219 is heading for scrap.

Note that including the three domestic SNCF full length Eurostars and the hapless Belgian set 3101/2, a total of six full length sets have now been withdrawn - 3013/4 and 3019/20 being the most recent to go.
 

RichmondCommu

Established Member
Joined
23 Feb 2010
Messages
6,912
Location
Richmond, London
Note that including the three domestic SNCF full length Eurostars and the hapless Belgian set 3101/2, a total of six full length sets have now been withdrawn - 3013/4 and 3019/20 being the most recent to go.

Have the SNCF started cutting up TGV's given that some of them have been withdrawn for some time now?
 

Cletus

Established Member
Joined
11 Dec 2010
Messages
2,230
Location
Dover
It's suggested in the earlier link that it may be going for preservation?
 
Status
Not open for further replies.

Top