• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Crossrail GEML Section

Status
Not open for further replies.

AlanFry1

Member
Joined
17 Nov 2011
Messages
662
Hi - I'm not sure if this is something I'm wondering and alone in with opinion, but has the Crossrail on the slow rather than fast GEML services been a big mistake?:idea:

I was just wondering whether crossrail trains could have gone to Clacton/southend/Ipswich/Harwich etc leaving only the Norwich and WAML services and the shenfield metro services into the shed - that would have freed capacity more so at liv st, on the GEML, WAML and further across the field?

Didn't crossrail think of this before only operating on a bottleneck on the shenfield line? :-?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

eddp

Member
Joined
5 Aug 2011
Messages
39
Location
Berlin
There was a proposal called Superlink (https://en.wikipedia.org/wiki/Superlink_(railway_network)) to make Crossrail a regional rather than a suburban network, but from memory it was discarded, among other reasons, due to issues with services throughout the network being delayed by delays well outside London, which the chosen option, being pretty self-contained, won't have to the same extent. Thameslink on the other hand probably will suffer from these issues (the frequency of trains through the core means that the trains have to arrive at the core at the right time, and if a train coming from say Horsham is delayed en-route that could have a knock-on effect right back to Brighton and Eastbourne, and as far up as Bedford and Cambridge).

I remember once also reading a report that basically concluded that people travelling into an urban area from outside prefer/expect to travel to a terminus and then make onward travel from there, whereas from inside the urban area people don't have the same expectation and instead prefer to have a choice of locations to travel to. Up to a point it's the same argument as why Intercity trains don't stop much inside urban areas - it slows down the overall journey time and you can't please all of the people all of the time. Crossrail is basically an S-Bahn/RER style service.
 
Last edited:

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
29,157
The GEML isn't just full at Liverpool St, it's also full all the way to Shenfield on the main lines. It's not so full on the electric lines. The WAML is full at Liverpool St, and in the approaches from Bethnal Green, and again from Hackney Downs to Broxbourne via Tottenham Hale.

Putting the GEML 'Outers' down the hole would only free up space at Liverpool St. It would do nothing to provide more capacity from the portal to Shenfield on the main lines. Arguably, as Crossrail is a 200m long train railway, and most GEML peak trains are 240m, it would actually reduce capacity.
 

ChiefPlanner

Established Member
Joined
6 Sep 2011
Messages
7,783
Location
Herts
There was a proposal called Superlink (https://en.wikipedia.org/wiki/Superlink_(railway_network)) to make Crossrail a regional rather than a suburban network, but from memory it was discarded, among other reasons, due to issues with services throughout the network being delayed by delays well outside London, which the chosen option, being pretty self-contained, won't have to the same extent. Thameslink on the other hand probably will suffer from these issues (the frequency of trains through the core means that the trains have to arrive at the core at the right time, and if a train coming from say Horsham is delayed en-route that could have a knock-on effect right back to Brighton and Eastbourne, and as far up as Bedford and Cambridge).

I remember once also reading a report that basically concluded that people travelling into an urban area from outside prefer/expect to travel to a terminus and then make onward travel from there, whereas from inside the urban area people don't have the same expectation and instead prefer to have a choice of locations to travel to. Up to a point it's the same argument as why Intercity trains don't stop much inside urban areas - it slows down the overall journey time and you can't please all of the people all of the time. Crossrail is basically an S-Bahn/RER style service.

In a futile attempt to save the first Crossrail Bill (1994) - an effort was made to add Shenfield - Southend and even a connection to the LT+S via grade seperation at Forest Gate Junction. (and - abandoning the Metropolitan ?Chiltern section and addingMilton Keynes / Tring into the equation. More value etc. Course these ides failed due to (a) Railtrack (b) Upsetting the privatisation concepts of early franchises - funny how the Tring concept may yet have it's day.
 

GB

Established Member
Joined
16 Nov 2008
Messages
6,457
Location
Somewhere
The GEML isn't just full at Liverpool St, it's also full all the way to Shenfield on the main lines. It's not so full on the electric lines. The WAML is full at Liverpool St, and in the approaches from Bethnal Green, and again from Hackney Downs to Broxbourne via Tottenham Hale.

Putting the GEML 'Outers' down the hole would only free up space at Liverpool St. It would do nothing to provide more capacity from the portal to Shenfield on the main lines. Arguably, as Crossrail is a 200m long train railway, and most GEML peak trains are 240m, it would actually reduce capacity.

Out of interest, where is "the hole" going to be located? I know its the stratford area but how will it fit in with existing infrastructure?

Caveat: I know nothing at all about crossrail.
 

NotATrainspott

Established Member
Joined
2 Feb 2013
Messages
3,223
Out of interest, where is "the hole" going to be located? I know its the stratford area but how will it fit in with existing infrastructure?

Caveat: I know nothing at all about crossrail.

At the original site of Pudding Mill Line DLR station. Crossrail moved the DLR station south east by far enough that the tunnels will surface between the running lines to Liverpool Street. You can see it on Google Maps.
 

Dave1987

On Moderation
Joined
20 Oct 2012
Messages
4,563
When you look at where the tunnel mouth is and how close the ring road at Bow is the gradient down must be pretty steep to get under the road.
 

GB

Established Member
Joined
16 Nov 2008
Messages
6,457
Location
Somewhere
At the original site of Pudding Mill Line DLR station. Crossrail moved the DLR station south east by far enough that the tunnels will surface between the running lines to Liverpool Street. You can see it on Google Maps.

Ah, thank you.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
31,372
When you look at where the tunnel mouth is and how close the ring road at Bow is the gradient down must be pretty steep to get under the road.

There's also the Lee (Lea?) Navigation that comes first, in terms of obstructions to dive under...
 

AndyNLondon

Member
Joined
20 Jan 2014
Messages
189
Here's a diagram illustrating Pudding Mill Lane DLR's old & new locations, and how the Crossrail portal fits into the space created:
pudding%20mill%20lane%20aerial%20graphic_136881.jpg

(from Crossrail press release about the new DLR station)
 

Alfie1014

Member
Joined
27 Jun 2012
Messages
1,126
Location
Essex
In a futile attempt to save the first Crossrail Bill (1994) - an effort was made to add Shenfield - Southend and even a connection to the LT+S via grade seperation at Forest Gate Junction. (and - abandoning the Metropolitan ?Chiltern section and addingMilton Keynes / Tring into the equation. More value etc. Course these ides failed due to (a) Railtrack (b) Upsetting the privatisation concepts of early franchises - funny how the Tring concept may yet have it's day.

I remember working with ChiefPlanner on the LTS (off peak) option in the 1990s it was a pretty limited offer and would have probably only triggered demands for a better all day service off of the route. Somewhere I've still got the original draft timetables.

Interestingly there are current campaigns to extend the eastern side of Crossrail 2 down to the LTS (all day), it's surprising what goes around come around!
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
29,157
Interestingly there are current campaigns to extend the eastern side of Crossrail 2 down to the LTS (all day), it's surprising what goes around come around!

Not going to happen
--- old post above --- --- new post below ---
When you look at where the tunnel mouth is and how close the ring road at Bow is the gradient down must be pretty steep to get under the road.

About 1:30 IIRC
 

NotATrainspott

Established Member
Joined
2 Feb 2013
Messages
3,223
Considering 25+ year-old 319s with 25% axles driven manage the 1:29 between City Thameslink from a standing start, the 345s should eat the climb to the surface at Bow.

There's a 1-in-32 descent east of Paddington too.
 

Dave1987

On Moderation
Joined
20 Oct 2012
Messages
4,563
I'm sure I read somewhere that its one of the steepest gradients in the country. And that they can only get away with it because it's covered and so not affected by low adhesion factors.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
14,232
Location
St Albans
There's a 1-in-32 descent east of Paddington too.

All easy for EMUs. Most of the ramps in UK urban areas were built with the maximum gradients that victorian steam hauled trains could reliably (or not sometimes) climb.
 
Last edited:

Starmill

Veteran Member
Fares Advisor
Joined
18 May 2012
Messages
23,350
Location
Bolton
I have this recollection that Ken Livingstone chose the Metro option rather than the Express option because although the latter had a slightly better BCR, it wouldn't achieve his aim of regenerating the inner-suburbs if it didn't stop there.
 

Wolfie

Established Member
Joined
17 Aug 2010
Messages
6,119
I have this recollection that Ken Livingstone chose the Metro option rather than the Express option because although the latter had a slightly better BCR, it wouldn't achieve his aim of regenerating the inner-suburbs if it didn't stop there.

Yup and he who pays the piper picks the tune! Given the amount of Croassrail funding that came from London it is unsurprising that London's priorities dominated...
 

ComUtoR

Established Member
Joined
13 Dec 2013
Messages
9,428
Location
UK
Considering 25+ year-old 319s with 25% axles driven manage the 1:29 between City Thameslink from a standing start

They struggle and there are specific instructions for making it up there too. About a week ago I almost didn't make it up and came to a grinding halt just after the signal.

Heading down from City Thameslink is probably the worst part of my day. Sitting at City, waiting for the RA, staring at that climb, in a 319... not fun.

The best thing they ever did was increase the linespeed up it.
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
29,157
IIRC it was revealed somewhere that sending this Eastern branch via Barking is the current thinking at TfL, so it's not entirely out of the question.

It's in the current thinking of various local authorities, which is a rather different thing. You might notice how no-one has explained how you could get a Crossrail frequency, all stations service on the Thameside line without removing services to Fenchurch street...
 

rebmcr

Established Member
Joined
15 Nov 2011
Messages
3,848
Location
St Neots
It's in the current thinking of various local authorities, which is a rather different thing. You might notice how no-one has explained how you could get a Crossrail frequency, all stations service on the Thameside line without removing services to Fenchurch street...

Grade separation east of Barking, and entirely replace the Purfleet line services?
 

Taunton

Established Member
Joined
1 Aug 2013
Messages
10,066
All easy for EMUs. Most of the ramps in UK urban areas were built with the maximum gradients that victorian steam hauled trains could reliably (or not sometimes) climb.
I believe the steepest gradient on the passenger network is 1 in 27 on the climb from under the Mersey to Liverpool James Street (1 in 30 up the other side to Birkenhead). This was easily achieved, including restarting from signal stops, by 40-year old EMUs in the late 1970s. It had also been achieved by an intensive steam service prior to electrification, with locos sapped for power by condensing gear.
 
Status
Not open for further replies.

Top