Island Line Railway - current state and the future

Status
Not open for further replies.
Joined
19 Aug 2015
Messages
83
Any news on whether the current rolling stock is going to be refurbished or replaced as well as any plans for the physical infrastructure once network rail get the network back in their hands. Lots of talk about the pier and a new loop but nothing new.
 
Last edited:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

MidnightFlyer

Veteran Member
Joined
16 May 2010
Messages
12,857
Out of interest, what would a new loop (I will assume Brading as that is always the place mentioned) achieve? The only thing I can think of is a standard 30:30 interval service, as surely any ramping up of service to 3tph etc would be totally unviable in its current form? Is the current 20:40 split really that big a problem?
 

Chris M

Member
Joined
4 Feb 2012
Messages
1,057
Location
London E14
The loop at Brading is indeed intended to allow an even 30:30 service.
An even service interval is always more attractive for passengers than an uneven one and a 30-minute interval is psychologically significantly better than a 40 minute one.
A 20-minute interval would be even better from a passenger POV of course, as that's about the limit of a turn-up-and-go service, but what infrastructure is required to support that on the IoW I don't know.
 

DelW

Established Member
Joined
15 Jan 2015
Messages
3,833
The crucial factor is the connection with the fastcat ferries to Portsmouth, which a high proportion of passengers are transferring to or from. Those run mostly at even 30 minute intervals, so at present the trains connect well only once per hour, the other hourly train misses the ferry in one direction and gives a longer wait in the other.

A 3tph service at 20 minute intervals could be run on the present infrastructure, as that's what the existing loops were set up for. It would of course need more units to be in use, and there may not be enough serviceable now.

A side benefit of the Brading loop is that trains would no longer need to cross south of St Johns, so Island Line could use a single track and allow the steam line to extend from Smallbrook Junction into St Johns.
 
Joined
19 Aug 2015
Messages
83
Surely the easiest thing to do is to have a 20 minute frequency as the current set up allows for this despute tbere beibg sufficient rolling stock. Longer term a new loop could be installed at Branding to allow the frequency to drop to 30 minutes during less busy periods
 

Chris125

Established Member
Joined
12 Nov 2009
Messages
3,074
Any news on whether the current rolling stock is going to be refurbished or replaced as well as any plans for the physical infrastructure once network rail get the network back in their hands. Lots of talk about the pier and a new loop but nothing new.

South Western Railway have referred to 'more modern' rolling stock replacing the current fleet - we should find out more in the next few weeks when they launch a consultation on their plans.

http://www.islandecho.co.uk/first-mtr-south-western-to-take-over-island-line/
 

DelW

Established Member
Joined
15 Jan 2015
Messages
3,833
South Western Railway have referred to 'more modern' rolling stock replacing the current fleet - we should find out more in the next few weeks when they launch a consultation on their plans.

They would have a job to find any less modern rolling stock than the present fleet. Most preserved lines run newer stock than Island Line.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
28,013
Location
UK
They would have a job to find any less modern rolling stock than the present fleet. Most preserved lines run newer stock than Island Line.

And that could be where SWR will go looking. :)
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
31,258
I wonder if D Trains would fit the tunnel...?

New here? They don't. It's been discussed to death before though.

Important edit for anyone joining this discussion in 2019. This was a valid comment at that time, but the infrastructure had been changed to allow them.
 
Last edited:

philthetube

Established Member
Joined
5 Jan 2016
Messages
3,746
current Bakerloo is probably worse than they have, I understand, (though am happy to be corrected), that there would be potential corrosion issues with the satl water on the pier.
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
17,685
Location
Hertfordshire / Teesdale
What about current Bakerloo stock? Up for replacement soon?

Nope, won't be available til late 2020s perhaps later.

There is virtually no stored LU stock at present. Virtually all of the redundant 67 stock off the Victoria Line has been scrapped now, as has the last of the ex Northern Line 72 stock. There *may* just be enough 67/72 stock still sitting around to cobble together a very small number of 2-car trains, but even that I doubt. In any case, patching up long-stored stock is never a good idea.

Next to go will probably be the Piccadilly Line, still around mid 2020s at the earliest.

Whatever option is being looked at for newer stock, I can't see it being ex LU at the present time.
 

johnnychips

Established Member
Joined
19 Nov 2011
Messages
3,675
Location
Sheffield
How many trains do you need to cover the current diagrams, as a matter of interest? Presume it would be the same with the passing loop, but they would be able to have a fixed-interval timetable.
 

tom1649

Member
Joined
5 Jul 2010
Messages
960
I had a thought about a possible reuse for the current Glasgow subway stock but it has a narrower running gauge unfortunately.
 

trash80

Established Member
Joined
18 Aug 2015
Messages
1,204
Location
Birches Green
The delay in the Deep Tube Upgrade stuffed them, they declined the 83TS in favour of the 73TS which was supposed to have been replaced on the Piccadilly Line already (and thus already running on the Island Line).

They have been talking about going down the tram route with ex-Brum T69s but i hope not.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
97,521
Location
"Marston Vale mafia"
The AnsaldoBreda trams are garbage, the lot of them. That's why Metrolink replaced theirs early.

If they're going tram, it'd be as well to buy new, they are cheaper than trains and in such an undemanding role (provided they don't rot) should last well.

Here's a curved ball - DLR units when the new ones arrive?
 

DPWH

On Moderation
Joined
8 Sep 2016
Messages
244
So if they can't use ex-LUL stock, could an order for a few more carriages be tacked onto an existing LUL order for new stock?
 

trash80

Established Member
Joined
18 Aug 2015
Messages
1,204
Location
Birches Green
Is there the money to buy new? Quite novel for the Isle of Wight railways, when was the last time they had new stock on the island? :D
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
17,685
Location
Hertfordshire / Teesdale
How many trains do you need to cover the current diagrams, as a matter of interest? Presume it would be the same with the passing loop, but they would be able to have a fixed-interval timetable.

Seems to be 2x 2-car units most of the time, doubled up increasingly less often at busy times. So minimum fleet size would need to be 8 cars. Asking for 100% availability of old trains is not ideal, so a working minimum is really 10 - which is what they run with at present (I believe 002 has been out of use for many years).
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
17,685
Location
Hertfordshire / Teesdale
So if they can't use ex-LUL stock, could an order for a few more carriages be tacked onto an existing LUL order for new stock?

Again, unlikely to be any LU orders for perhaps 3 to 5 years, and any LU order would be rather over-specified for the island.

One other fleet could be the current Waterloo and City trains, if this ends up being the testbed for the next generation of LU trains. Whether it would be wise to take on the problematic 92 stock is another matter, although the drain units have probably had a less intensive life. Not sure how easy it would be to make them into 2 cars however, plus LU may want them for spares, and they could be rather obsolete if they get left out from the retractioning of the main fleet as is I believe the current plan.
 
Last edited:

bb21

Emeritus Moderator
Joined
4 Feb 2010
Messages
24,151
How many trains do you need to cover the current diagrams, as a matter of interest? Presume it would be the same with the passing loop, but they would be able to have a fixed-interval timetable.

Two trains required.

Where resources allow, the longer diagram does a unit swap during the day, so utilising 3 units.
 

gazthomas

Established Member
Joined
5 Jun 2011
Messages
3,039
Location
St. Albans
Something has to happen with the Island Line. As fond as I am of the stock, it's so well past its sell by date that it's grown antlers and a tail
 

bramling

Veteran Member
Joined
5 Mar 2012
Messages
17,685
Location
Hertfordshire / Teesdale
Something has to happen with the Island Line. As fond as I am of the stock, it's so well past its sell by date that it's grown antlers and a tail

Does anyone have any idea how expensive / difficult it would be to simply resolve the clearance issue in the Ryde tunnel?

If it's feasible to do fairly easily, this gives the option to use plenty of forthcoming available DC units - for example retractioned 455s - plus the option of diesel units. Plenty of Pacers from 2020 onwards.

A lot presumably depends on just how feasible it is to keep the 38 stock running. The "do nothing" option has always prevailed to date.
 
Last edited:

DelW

Established Member
Joined
15 Jan 2015
Messages
3,833
Quite novel for the Isle of Wight railways, when was the last time they had new stock on the island? :D

I'd guess at least a century ago, if even then. The island railways have run on suburban cast-offs since pre-grouping days.
 

DerekC

Established Member
Joined
26 Oct 2015
Messages
2,107
Location
Hampshire (nearly a Hog)
Does anyone have any idea how expensive / difficult it would be to simply resolve the clearance issue in the Ryde tunnel?.

I believe the answer is difficult and expensive because somebody laid pipes under the trackbed after the end of steam on the island - but that is third hand and I am not sure that it's true.
 