How to perfectly cut railtracks?

Status
Not open for further replies.

djmk1988

Member
Joined
21 Feb 2013
Messages
11
Location
cardiff
Good evening buddies and hello to everyone.
Quite new to this forum but been a railway passionate since I was a little boy, nice railway careers in my family as well :) . My hobby is locomotives, but I'm rejecting my dream to be a driver now as the work patterns won't suit me well - even though driving them massive machines feels like a hug from God himself. Recently started my PTS course which I more than enjoy and looking to make the best out of it and move up as much as I can. My experience on working on the railtrack is next to zero , however I'm more than interested to learn so will pay attention to what each of you has to say.
The guy who's got me into this mentioned that cutting the railtrack is an art which only a few master it properly... at least in the begining. Must admit i've been using tools since I was about 11 (I'm 30 now ) including disk cutters, grinders, welding machines, drills etc etc- no accidents or mistakes what so ever as I tend to be very calculated and precaucious with what I do (I'm designing and servicing electronics of all kinds as a job ). However , would like to ask you guys what's the best way to do it - both quick and efficient, without grinding down the disc too much. I saw some clips on youtube and to my first impression I understood that what makes an actual diference is the way you swing the disc cutter while cutting the track. Again I might be (Very) wrong. And this is why I'm here. Not looking to demonstrate i'm a genious on the track but definetly want to learn and do my best and above all be well prepared. A lovely evening to you all,
Mario Alex.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Boodiggy

Member
Joined
8 Nov 2012
Messages
524
Location
MK
Hi,
It depends on what rail you need to cut.
For stressed track the first cut needs to be a flame cut (done by welders usually) and any disc cutting can be done once you pass the training course - and like anything it takes a bit of practice to master it...

Rail also comes in varoius grades and profiles.
 
Last edited:

AndrewE

Established Member
Joined
9 Nov 2015
Messages
5,075
However , would like to ask you guys what's the best way to do it - both quick and efficient, without grinding down the disc too much. I saw some clips on youtube and to my first impression I understood that what makes an actual diference is the way you swing the disc cutter while cutting the track.
A PWay specialist will be able to correct this if I am wrong, but I think most discs (resin-bound ones anyway) are designed to wear away so that fresh cutting grit is always presented to the work. You use them until they get too small (and the actual speed of the disc edge against the work drops too low) then you change them. Special ones (diamond-impregnated or whatever) might go on for ever, but probably need to be used more carefully, with coolant or whatever.
 

Robvdub73

New Member
Joined
14 Feb 2020
Messages
4
Location
staffordshire
I've been on the railway now for 19yes as a track welder and we have to use a mounted rail saw for cutting rail or I use oxy-propane cutting head and a cutting guide. the best cut comes from a new blade as it cuts it wears down and if you push down on the saw to hard it glazes the blade and wont cut properly
 

civ-eng-jim

Member
Joined
16 Jul 2011
Messages
396
Location
Derby
Ah - one question you might be able to answer Robvdub73. When welding up an S&C layout or plain line panels, do you cut a bit of the end of each rail off on each panel to cater for the weld size? So if you were to weld up 60ft panels and didn't cut the ends, eventually over a number of panels it could lead to critical track features being out of position.
 

Robvdub73

New Member
Joined
14 Feb 2020
Messages
4
Location
staffordshire
hi when the panels go in they go in the end to end and when we come to weld them we have to cut a gap to weld as with most projects and renewal sites we have to cut gaps as its safe as sometimes the engineers make the gaps too big and then you have an issue
 