CrossCountry (XC) HST modifications including power doors

Status
Not open for further replies.

_toommm_

Established Member
Joined
8 Jul 2017
Messages
5,842
Location
Yorkshire
Looks a little bit weird with the silver metal below the door, but apart from that, they do look very smart. Just does to show what a livery can do to a train. The FGW purple livery looks very antiquated IMO.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

DanNCL

Established Member
Joined
17 Jul 2017
Messages
4,178
Location
County Durham
First service with New Door XC HST set will be the 07:25 Newcastle to Taunton on Sept 17th.
And what is this source? Unless a VSTP path goes in there is no way of it getting from Craigentinny to NCL as an ECS (So would therefore not be the first service.) Also the 0725 would need to be retimed for HST timings and it is running to Exeter not Taunton as you stated.
Reported on HST gen that the sliding door set may indeed enter service on the 17th September, but on 1V52 07:00 Edinburgh - Exeter St Davids, which makes more sense as that run is booked HST anyway.
 

221129

Established Member
Joined
21 Mar 2011
Messages
6,520
Location
Sunny Scotland
Reported on HST gen that the sliding door set may indeed enter service on the 17th September, but on 1V52 07:00 Edinburgh - Exeter St Davids, which makes more sense as that run is booked HST anyway.
IF it enters service on Monday that will be the one it's on.
 

oliverpckehoe

Member
Joined
3 Dec 2017
Messages
59
Location
Cornwall
Any news on when a service down to Plymouth/Cornwall will be booked for a sliding door set? Just curious as I normally see a HST stationed at Plymouth on my way home (I assume it's running the 16:25).
 
Joined
24 Jun 2014
Messages
432
Location
Derby
Does anyone know why this particular option for fitting powered doors was adopted?

Reference is made elsewherre in this forum to the Mk 2e TSO 5809 which was modified by ABB; initially, only the inside was modified, and the work was undertaken in the early 1990s (pre-privatisation of BR) and was at the time a speculative project partially as input (by ABB) to the Mk 2f/Mk 3 refurbishment programme being developed at that time. Older members of this forum will probably remember the HST with at seat audio, etc, running about to measure passenger reactions to some ideas - wasn't it on the 'Master Cutler' for a time?

At a later date, ABB worked with Tebel (now part of IFE) to produce a framed power operated plug door for replacing the slam doors on Mk 2s and Mk 3s; this is as fitted to 5809.

The concept was very simple; the outer frame dimensions were the same as the curved door of the later Mk 2s and Mk 3s, so old door out, new framed door in - job done! Obviously, this is an oversimplification, but the logic behind the design was to minimise the structural work necessary to replace manual doors (on Mk 2fs/Mk 3s) with power operated ones.

Fitting sliding pocket doors to Mk 3s requires major work at vehicle corners; by contrast, the ABB design was "simple". So does anyone know why something like the ABB concept was not adopted by Wabtec for fitting power operated doors to Mk 3s, please?
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,768
Because (as explained in the GW and Scotrail threads) the experience of fitting power doors to the WSMR/Chiltern mark 3s was that in reality every single door had to be made to measure individually. This approach has allowed "mass production" of the doors and other components.
 
Joined
24 Jun 2014
Messages
432
Location
Derby
Because (as explained in the GW and Scotrail threads) the experience of fitting power doors to the WSMR/Chiltern mark 3s was that in reality every single door had to be made to measure individually.

I appreciate the problems with door sizes; however, the ABB design tried to overcome this "weakness" in Mk 3 vehicles.

It is, of course, some 30 years since ABB modified the Mk 2e, but as I remember it being described to me (on site at Litchurch Lane by ABB staff) the idea of the framed door was to overcome this door size problem; the framed door was supplied as a complete unit manufactured by Tebel, and it was dimensioned so that it fitted in the existing door pocket. I guess it was therefore slightly smaller than the nominal Mk3 door size, and any gaps between the door's frame and the existing door aperture would have been filled as appropriate. Also, I THINK the passenger door operating buttons were part of the frame, and the existing door release controls were to be used for permitting them to be opened; I can't remember how they were to be closed by the train crew.

I'm not familiar with the detail of the actual procedure used to fit powered doors to Chiltern's Mk 3s, but from what I have read I didn't think they were supplied to Wabtec as complete framed, factory produced, units, and a fair amount of work was required to each door opening to accomodate powered sliding plug doors; if this understanding is wrong, I'm sure someone will be able to explain how the work was done (or direct me to somewhere where it is explained).
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,768
ah, the issue with sticking a unit like that into the existing hole would be the resulting door aperture would be too narrow for modern accessibility requirements- not even just for wheelchairs, in general too.
 
Joined
24 Jun 2014
Messages
432
Location
Derby
ah, the issue with sticking a unit like that into the existing hole would be the resulting door aperture would be too narrow for modern accessibility requirements- not even just for wheelchairs, in general too.

That makes sense - thanks for that.
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
67,340
Location
Yorkshire
There was a thread for diagrams and allocation information, but the introduction of the train has been delayed. Therefore once the information is confirmed someone can make a thread at that point.
 
Last edited:

NoOnesFool

Member
Joined
26 Aug 2018
Messages
602
Any news on when a service down to Plymouth/Cornwall will be booked for a sliding door set? Just curious as I normally see a HST stationed at Plymouth on my way home (I assume it's running the 16:25).
There is a thread in the Allocations section that can give daily fleet numbers.
Does anyone know why this particular option for fitting powered doors was adopted?
Hi, this project is being undertaken to meet accessibility legislation for passengers with reduced mobility (PRM).
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
31,182
Hi, this project is being undertaken to meet accessibility legislation for passengers with reduced mobility (PRM).
I think the question was about the reason for the specific design chosen, ie as compared to the Chiltern solution, as was explained in post #96.
 
Joined
24 Jun 2014
Messages
432
Location
Derby
I think the question was about the reason for the specific design chosen, ie as compared to the Chiltern solution, as was explained in post #96.

Yep - but really why sliding pocket rather than the ABB Mk 2e framed plug, and this was answered by 98; surprised by that answer though, as by observation of the photos published herein thus far and from memory, I didn't think the door aperture on the Mk 2e would have been any narrower than Wabtec has achieved with the HST conversions.
 

221129

Established Member
Joined
21 Mar 2011
Messages
6,520
Location
Sunny Scotland
XC03 is allocated to work 1V50 and 1E63 today. Meaning it's likely to drop onto 1V44/1S51 tomorrow subject to not breaking.
 

pt_mad

Established Member
Joined
26 Sep 2011
Messages
2,960
XC03 is allocated to work 1V50 and 1E63 today. Meaning it's likely to drop onto 1V44/1S51 tomorrow subject to not breaking.

Was today it's first day in public service? Can't wait for some pics.
 

SC43090

Member
Joined
7 Sep 2018
Messages
197
After travelling on 1525 Plymouth Leeds earlier this evening, each coach in XC03 set as lost a few seats.... Here are the new seats numbers for each coach.....

43304

41193 as got 39 seats, also 1 X Disabled Toilet also wheelchair space.... Fact Panel says 39 seats

45003 as got 30 first class / also 8 standard class seats, also 1 X toilet Fact Panel says 30 / 8

42370 as got 80 seats, also 1 X toilet Fact Panel says 80

42378 as got 80 seats, also 1 X toilet Fact Panel says 80

42036 as got 80 seats, also 1 X toilet Fact Panel says 80

42376 as got 62 seats, also 1 X Disabled toilet, also wheelchair spaces Fact Panel says 62 seats

44052 as got 67 seats, NO TOILET....

43357

SC43090
 
Last edited:

Mitchell Hurd

On Moderation
Joined
28 Oct 2017
Messages
1,648
Just calculated that - 446. Might only be 11 less seats (55 in total eventually on each set) but I remember one Sunday a little while ago this year someone catching the 12:11 from Leeds to Bristol and reporting no seats. Hard to believe this was an HST but I think it was.

What makes me laugh is XC don't want to lose seats. Yet by removing 11 in each set is (unless someone can correct me) XC being a bit hypocritical.

If there's a good reason behind the reduction then fine but that's odd.I

Looks like they'll have to update their online HST seating layout.
 

NoOnesFool

Member
Joined
26 Aug 2018
Messages
602
Just calculated that - 446. Might only be 11 less seats (55 in total eventually on each set) but I remember one Sunday a little while ago this year someone catching the 12:11 from Leeds to Bristol and reporting no seats. Hard to believe this was an HST but I think it was.

What makes me laugh is XC don't want to lose seats. Yet by removing 11 in each set is (unless someone can correct me) XC being a bit hypocritical.

If there's a good reason behind the reduction then fine but that's odd.I

Looks like they'll have to update their online HST seating layout.
Probably extra space for wheelchair areas and priority seating.
 

sprinterguy

Established Member
Joined
4 Mar 2010
Messages
11,044
Location
Macclesfield
Running shortformed as 2+6 since yesterday after one of the Trailer Standards developed a door fault. Something that I suspect will be a recurring issue until there is more than one set (plus one spare vehicle) available for use.
 

221129

Established Member
Joined
21 Mar 2011
Messages
6,520
Location
Sunny Scotland
Running shortformed as 2+6 since yesterday after one of the Trailer Standards developed a door fault. Something that I suspect will be a recurring issue until there is more than one set (plus one spare vehicle) available for use.
The fault was more to do with the battery which caused faults. It's also running round with all 4 doors in coach F LOOU.
 

Mitchell Hurd

On Moderation
Joined
28 Oct 2017
Messages
1,648
Hopefully teething troubles!

I wonder what the acceleration is like, with a 6-coach HST, against a 4 and 5-car Voyager.
 

XCTurbostar

Established Member
Joined
13 Sep 2014
Messages
1,873
43357 + 43304 with slidings doors just left New Street on 1S52. Didn’t check the coaches/doors.
 

greyman42

Established Member
Joined
14 Aug 2017
Messages
4,863
I was on it on Wednesday between York and Birmingham and there was a technician from Wabtec walking up and down the train with a member of staff.
 

158820

Member
Joined
1 Nov 2017
Messages
242
XC01 ran from Craigintinny to Doncaster Wabtec Works departed at 05.29 today as 5Z43
 
Status
Not open for further replies.