Two ScotRail power cars went from Ely to Doncaster yesterday, which suggests that the next set might be close to release.Can't see any derogation being issued/accepted unless it is has a specific end date and given the ongoing lack of progress out of Wabtec ...
Congratulations on not answering the question.
So 50 cars less capacity is/was OK, then?
Clearly you are incapable of answering the question as you have deflected twice. I’ll assume that your plan doesn’t exist and is therefore not a credible alternative.Well, the HSTs have hardly solved that problem, have they? When are these trains magically going to appear, and what do we do if they don't?
That is what happens when you try and use a generic commuter design and pass it off on long distance services.
Clearly you are incapable of answering the question as you have deflected twice. I’ll assume that your plan doesn’t exist and is therefore not a credible alternative.
Clue: the first customer for the Class 170 wasn't a commuter operator. It was in fact Midland Mainline.
The units are not commuter units. They are regional express units. Which is the kind of service Inter7City really is.
The anti-170-style-units argument is really just door position prejudice. As long as they are long enough, what's the problem?
There's nothing wrong with 170s that a decent refurb, and reforming into longer sets, couldn't fix. All the other options available are prefectly decent trains too.
If CAF Mark 5s (or coaching stock from another manufacturer) had been ordered at the point where they won the franchise (on a "could be delivered in the required time frame" basis) then clearly loco availaibility wouldn't be an issue- just as with the TPE order, suitable locomotives (Class 68 or something else) would have been ordered.
Ultimately we don't know what options Abellio had explored in putting together their bid, nor what Arriva, First, MTR and NatEx had looked at. It would be fascinating to see all the proposals pitched to each bidder, what their preferred options were and the rational in each case
Absolute bollocks. Firstly they are too small. Not enough seats. If you join two together you can’t get from one to the other. The doors are in the wrong place everyone gets cold at every station in the winter.
Not enough luggage capacity for long distance travel
Not enough cycle capacity for route
Essentially they have been made to work but simply not suitable for long distance travel. You can try and gloss over these failings but they are real and it does your argument no good to ignore its flaws.
They could be re-engined too, no? Or maybe just replace their traction package with that from the 172s?I think, having read his posts, that Journeyman had some sort of plan involving taking centre cars from 3 car units and sticking them into other 3 car units to make longer ones, with the remaining two car units being sent away.
There's not enough centre cars though to deliver 26 5 car sets, let alone 6 car sets
That, or he was suggesting some sort of expensive programme of rebuilding cab ends into corridor ends. Creating 26 units would have required almost all of Scotrail's 55 strong fleet, before that was reduced.
I think Bombardier have said they could install doors at vestibules, similar to those to 1st class.
If all that was possible, then luggage and cycle capacity could certainly have been created through interior reconfiguration.
Still wouldn't have solved the lack of tractive power, especially in winter.
Still not answering the question. It's like talking to Baldrick.So what's your plan?
ScotRail could have done any number of things, including:
So yeah, these amazing magical HSTs - where the hell are they?
- Refurbed 170s (they could have bid on the basis of keeping them, and as they're being released from a number of services by electrification, it may well have been possible to have enough of them)
- Hitachi bi-modes (eminently suitable for the task)
- Mark 5 coaches (ditto, although there's some question marks about locos, but that almost certainly could have been solved)
- CAF Civity (they've been plugging this to operators for some time, and it's a decent train, including an end-door version)
- Stadler FLIRT (another Abellio franchise has made use of these)
Absolute bollocks. Firstly they are too small. Not enough seats. If you join two together you can’t get from one to the other. The doors are in the wrong place everyone gets cold at every station in the winter.
Not enough luggage capacity for long distance travel
Not enough cycle capacity for route
Noisy.
Essentially they have been made to work but simply not suitable for long distance travel. You can try and gloss over these failings but they are real and it does your argument no good to ignore its flaws.
In snow a 170 is not much good. A loco hauled train would be better. Not much controversial in that.
Still not answering the question. It's like talking to Baldrick.
Perhaps you have forgotten the question: ScotRail are losing 20 Class 170 sets (60 vehicles). The HSTs are planned to deliver 121 vehicles. How would your Turbostar plan cover the 61 vehicle capacity shortfall?
Now, to answer your question: I'd have gone with locos+Mark 5s, assuming that it was affordable. Interesting to note, though, that the Mark 5s ordered by the sleeper franchise at around the same time are still not in traffic. Likewise the vehicles for TPE are not in service (and have missed their in service date). So, even if the franchise had gone down that route they wouldn't have the new trains any quicker. Had they done so, no doubt you would have been dribbling how they should have gone with HSTs instead...
The general view is that once you get to 5 coaches and above, having locomotives on diesel trains is more cost effective, as the cost of maintaining lots of engines and cooler groups adds up. Doesn't stop the industry ordering trains with lots of engines, though (9-car 222s as an example).Loco hauled trains are expensive to operate and most of the time don't have any advantage over fixed formations. They're not coming back.
I'm sorry, but are you being so dim deliberately?But are ScotRail only losing them because they've said they don't need them? Could they have bid on the basis of keeping them?
85 Class 170 centre cars have been built, including the ones now converted to 171s. if you add in those built as 171s, you reach 97. If you get really desperate and raid the 168s, that's another 28.Taking each point in order...
- You could easily reform 170s into longer sets by inserting non-driving vehicles from other sets, reducing some to 2-car formations and extending others. You could create 4, 5 or 6 car sets this way, and I've seen proposals for longer refurbed sets. Still more flexible than an HST, which can't be extended at all, and a huge chunk of the train length is engines, which makes very poor use of platform length.
TPE didn't order any extra 68s, they're using the existing DRS fleets. As far as I know, no further 68s can be ordered due to the emissions being too high to meet current standards, so that's a big question mark.
Agreed, it would be very interesting to see what the others proposed.
I'm sure one of the manufacturers will supply a UK compliant fleet of locomotives if required. It's much easier than a DMU given the space available.
I think it was Gerard Fiennes who lamented that the railway measures its delays in minutes, whereas its suppliers measure delays in weeks and months. Nothing more true than that!The HSTs are late with no end in sight. The new sleepers are late and I've no more idea of what's going on there than I have with the HSTs. Hitachi's late with everything and getting stuff wrong all over the place. While we're on the subject of tarting up 15-20 year old 170s then let's not forget how long it took Southern to do that, and then abandon the project for any further sets.
Taking each point in order...
- You could easily reform 170s into longer sets by inserting non-driving vehicles from other sets, reducing some to 2-car formations and extending others. You could create 4, 5 or 6 car sets this way, and I've seen proposals for longer refurbed sets. Still more flexible than an HST, which can't be extended at all, and a huge chunk of the train length is engines, which makes very poor use of platform length.
- Luggage racks and cycle racks can easily be fitted.
- They're not particularly noisy, and the noise issue is not generally anything that non-enthusiasts complain about. The first class sections are noticeably quieter because of the power vestibule doors, and if those were fitted throughout it would improve the situation enormously, and solve your gripe about door positioning.
- Loco hauled trains are expensive to operate and most of the time don't have any advantage over fixed formations. They're not coming back.
Well the Scotrail sets will be limited to a maximum length of 2+6 due to platform lengths at Glasgow Queen Street, and I think the number of those would be limited due to both platform availability there and depot infrastructure at Haymarket, but yes it seems a bizarre claim that the HSTs cannot be lengthened when, if desired, there will be swathes of available trailer stock going spare over the next few years.An HST when or if they are delivered form WABTEC will be four or 5 car formations. They can be extended to 9 or ten if required. So why say they cant be extended? When it would be easier to extend an HST than a 170..
But ultimately it's the passengers who would suffer if there was no train at all - including those who are of reduced mobility.
Not suggesting derogations should be granted on an open-ended basis
So you keep telling us, you think they are a bad choice. But with respect to you I have yet to see you come up with a feasible alternative with the funds that ScotRail had available, and please don't go back to your notion of using a 6 car Class 170. As an intercity train they are a complete joke. Leaving the underfloor engine argument aside which I accept we could go back and forth on all day, the doors are in the wrong place, they don't have nearly enough luggage space and their engines are woefully underpowered, and that's just for starters. That is what happens when you try and use a generic commuter design and pass it off on long distance services.
Plenty in the industry thought it crazy so you say. Those probably would be the same people who foisted Class 170's, 180's, 185's and other glorified railbus designs on long distance travellers. We need to wait for more trains to enter service but with their performance they could be a game changer and they were designed without the compromises we see on many of the shiny "modern" designs of today. The unfortunate thing is that train design is too often dictated by accountants which leads to poorly designed trains. Many of the HST replacements have been like trading a 40 year old Rolls Royce for a brand new Fiat 500. No disrespect to those who drive a Fiat but you're not comparing like with like and I know which one I'd rather have. You think the HSTs are such a bad idea? Go ahead and suggest a serious proven alternative that a) is available now and b) matches the performance of a short formed HST. Just because it's shiny and "new" doesn't mean it's better.
So what's your plan?
ScotRail could have done any number of things, including:
So yeah, these amazing magical HSTs - where the hell are they?
- Refurbed 170s (they could have bid on the basis of keeping them, and as they're being released from a number of services by electrification, it may well have been possible to have enough of them)
- Hitachi bi-modes (eminently suitable for the task)
- Mark 5 coaches (ditto, although there's some question marks about locos, but that almost certainly could have been solved)
- CAF Civity (they've been plugging this to operators for some time, and it's a decent train, including an end-door version)
- Stadler FLIRT (another Abellio franchise has made use of these)
If it was so easy to extend 170's why has it not been done? Southern modified them took for ever and they said no more. Kind of undermines your argument methinks.
An HST when or if they are delivered form WABTEC will be four or 5 car formations. They can be extended to 9 or ten if required. So why say they cant be extended? When it would be easier to extend an HST than a 170..
Where you putting the luggage and cycle racks? On the roof? Any more reduces seats and we don't have enough seats already.
Well the Scotrail sets will be limited to a maximum length of 2+6 due to platform lengths at Glasgow Queen Street, and I think the number of those would be limited due to both platform availability there and depot infrastructure at Haymarket, but yes it seems a bizarre claim that the HSTs cannot be lengthened when, if desired, there will be swathes of available trailer stock going spare over the next few years.
Inverness handles a full HST every day so does Waverley. Only problem would be at GLQ. As to your point about luggage and cycles regularly see space at rear of HST power cars getting used for this purpose. Anyway there aren't enough 170 coaches to add into the sets so your idea will not work anyway. Unless you build more coaches.Southern had to change the couplings to match the 171s, which have Dellners. Sticking an additional vehicle into an existing set takes minutes.
Nope, they can only be extended to 2+6 formations due to platform lengths. So you can't have a train of eight passenger vehicles. The power cars are hugely wasteful of space.
Where do the luggage and cycle racks go on a 4 or 5 car HST? They can go in the same place in a 4 or 5 car DMU, oddly enough.