In addition to the carriage shed extension, there is an additional building being erected on the apron to the West of the main shed. This is for the S & T dept and is a substantial 42m x 12m with a mezzanine floor to be incorporated.
Needless to say the project turned out to be more complicated than originally expected as the ground - particularly in the NE corner was very poor. This is higher than the adjacent field and had the level built up sometime in the past (could this have been done during the Second World War as part of the D Day build up???).
Needless to say the project turned out to be more complicated than originally expected as the ground - particularly in the NE corner was very poor. This is higher than the adjacent field and had the level built up sometime in the past (could this have been done during the Second World War as part of the D Day build up???).