Moderator note: split from https://www.railforums.co.uk/threads/windermere-line-electrification-progress.191705/
How about these?
https://twitter.com/philatrail/status/1169280188930281472
Only a couple of hundred more supports needed and someone can start hanging wires from them.
How about these?
https://twitter.com/philatrail/status/1169280188930281472
Seems that Network Rail has no need for these electrification masts and booms. It’s selling by tender 170 tonnes of them from Newport.
Last edited by a moderator: