Most/least successful recent large infrastructure project?

Status
Not open for further replies.

Horizon22

Established Member
Associate Staff
Jobs & Careers
Joined
8 Sep 2019
Messages
7,446
Location
London
Thameslink, but specfically the Bermondsey fly-unders. Countless hours of delays saved.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

telstarbox

Established Member
Joined
23 Jul 2010
Messages
5,928
Location
Wennington Crossovers
Quite so. Probably the one route in the south-east which has always been least-suited for electrification. It freezes up numerous times even during a mild winter, the third rail is so badly installed that it occasionally falls over (literally - last occasion was in Bletchingley Tunnel a couple of weeks ago), it’s got numerous foot crossings and entirely unstaffed stations where people have historically come to grief on the third rail - and virtually all the freight needs to be diesel-hauled anyway, with only an hourly passenger train service most of the time, too.
Didn't the service run through to Maidstone West and/or Tunbridge Wells at some point in the 2000s?
 

hwl

Established Member
Joined
5 Feb 2012
Messages
7,354
Thameslink, but specfically the Bermondsey fly-unders. Countless hours of delays saved.
GTR and SE heading to the top of the "complex network"* performance stats...

*i.e. simple network includes C2C and Chiltern
 

MML

Member
Joined
25 Oct 2015
Messages
587
Redhill station layout is appalling.
The new platform 0 is normally home to a reversing 3-car GWR turbo-star, thereby blocking through services using this platform.
Platform 1 is now a very long 10-car bay platform, home to the 3-car Electrostar shuttle to Tonbridge.
Platform 2 is a busy through platform for Northbound services.
Platform 3 is a busy through platform for Southbound services.

I travel on Thameslink services and the services are invariably always held outside the station awaiting a platform to become free.
The reason, there is only a single through platform for Southbound services.
Thameslink services complete with local Southern services to Reigate. And there is also crossing Southern and GWR services.

Platform 1 should become a through platform once again. This would allow northbound services to use this platform and free capacity on platform 2 to be used for more southbound services.

Platform 0 and 1 for Northbound and terminating services.
Platform 2 for Southbound and Northbound services.
Platform 3 for Southbound and terminating services.
 

Dr Hoo

Established Member
Joined
10 Nov 2015
Messages
3,912
Location
Hope Valley
I thought that the idea of making Platform 1 at Redhill into a bay was to avoid any issues with overruns, overlaps or conflicting moves with Platform 2 in either direction. I presume that it would not be acceptable to have a 12-car running northbound into a through Platform 1 as a southbound train ran into Platform 2 and a train from the Reigate line arrived in parallel at Platform 0 for example.

Given that there are often four trains per hour terminating or reversing at Redhill from the south in the space of an hour, having one south-facing bay hardly seems excessive when compared with other stations.

(I am well aware of the more detailed criticisms of Redhill such as revenue protection from Platform 3, the positioning of indicators and stop boards in relation to canopies but am not attempting to re-open discussion on these points.)
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
31,267
I thought that the idea of making Platform 1 at Redhill into a bay was to avoid any issues with overruns, overlaps or conflicting moves with Platform 2 in either direction...
I didn’t think Redhill would rate the description “large infrastructure project” anyway? On a scale of 1 to 10 I’d give it about 1.1... :D
 

markymark2000

On Moderation
Joined
11 May 2015
Messages
3,538
Location
Western Part of the UK
I thought that the idea of making Platform 1 at Redhill into a bay was to avoid any issues with overruns, overlaps or conflicting moves with Platform 2 in either direction. I presume that it would not be acceptable to have a 12-car running northbound into a through Platform 1 as a southbound train ran into Platform 2 and a train from the Reigate line arrived in parallel at Platform 0 for example.
Could P1 not be linked into the top half of Platform 0 and then have a midway signal on platform 0 to protect the points (if that makes sense). If a 12 car then needs to use Platform 0, it can do but P1 then can only be used southbound. If however it's a GWR 'reverse', it could be done on P0 still while allowing platform 1 to be used as a through platform.
 

R G NOW.

Member
Joined
25 Jan 2019
Messages
418
Location
gloucester
Redhill station layout is appalling.
The new platform 0 is normally home to a reversing 3-car GWR turbo-star, thereby blocking through services using this platform.
Platform 1 is now a very long 10-car bay platform, home to the 3-car Electrostar shuttle to Tonbridge.
Platform 2 is a busy through platform for Northbound services.
Platform 3 is a busy through platform for Southbound services.

I travel on Thameslink services and the services are invariably always held outside the station awaiting a platform to become free.
The reason, there is only a single through platform for Southbound services.
Thameslink services complete with local Southern services to Reigate. And there is also crossing Southern and GWR services.

Platform 1 should become a through platform once again. This would allow northbound services to use this platform and free capacity on platform 2 to be used for more southbound services.

Platform 0 and 1 for Northbound and terminating services.
Platform 2 for Southbound and Northbound services.
Platform 3 for Southbound and terminating services.

Do they not have signals at each end for reversible working, as it is at reading?. If so why don't they use it, save on trains waiting.
 

Train Maniac

Member
Joined
28 Sep 2018
Messages
367
Redhill station layout is appalling.
The new platform 0 is normally home to a reversing 3-car GWR turbo-star, thereby blocking through services using this platform.
Platform 1 is now a very long 10-car bay platform, home to the 3-car Electrostar shuttle to Tonbridge.
Platform 2 is a busy through platform for Northbound services.
Platform 3 is a busy through platform for Southbound services.

I travel on Thameslink services and the services are invariably always held outside the station awaiting a platform to become free.
The reason, there is only a single through platform for Southbound services.
Thameslink services complete with local Southern services to Reigate. And there is also crossing Southern and GWR services.

Platform 1 should become a through platform once again. This would allow northbound services to use this platform and free capacity on platform 2 to be used for more southbound services.

Platform 0 and 1 for Northbound and terminating services.
Platform 2 for Southbound and Northbound services.
Platform 3 for Southbound and terminating services.
Beginning to wander off topic, but I've always thought Redhill could do with some high level platforms and connect the Tonbridge-Redhill and Redhill- to Reading lines into one. (bonus frieght avoiding London as well if need be) The only problem in that plan being the geography, the station being situated in a rather steep valley.

To answer the question, The Borders line is quite popular, so must be in with a shout.
 

Railwaysceptic

Established Member
Joined
6 Nov 2017
Messages
1,408
Beginning to wander off topic, but I've always thought Redhill could do with some high level platforms and connect the Tonbridge-Redhill and Redhill- to Reading lines into one. (bonus frieght avoiding London as well if need be) The only problem in that plan being the geography, the station being situated in a rather steep valley.
That was one of Dr. Beeching's ideas. About 55 years ago!
 

Railwaysceptic

Established Member
Joined
6 Nov 2017
Messages
1,408
And it wasn’t a very good idea then either.
Dr. Beeching of course was thinking about it as a trunk route for freight from Dover to the West Midlands and the North, not as a passenger railway. I doubt if platforms at Redhill entered his mind!
 

MML

Member
Joined
25 Oct 2015
Messages
587
Redhill issues are normally a Thameslink service being held due to the Reigate service blocking platform 3, because it is being held up by a late running GWR Reading service.
While the other 3 platforms stand empty.
A total bottleneck.
 

james60059

Member
Joined
6 Jul 2006
Messages
839
Location
Hinckley
MOST: Norton Bridge grade separation
LEAST: Nuneaton North chord, unless it's 4M81, nothing else uses it.

Not seen any official news, but Kenilworth seems to be a successful reopening.
 