• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

ScotRail HST Introduction - Updates & Discussion

Status
Not open for further replies.

Steven_G

Member
Joined
5 Mar 2018
Messages
140
So another breakdown blamed on the Speedo

ScotRail has a program of maintenance including sorting that.

So frustrating
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

option

Member
Joined
1 Aug 2017
Messages
636
55 years old. Has any railway in Europe ever run such geriatric stock on long distance services?

Not everything is 55years old though, & that would be the earliest built ones.
The engines will be 25years old in 2030.

They will also not be running at anywhere near the stresses that they used to; 4/5 carriages instead of 6-9, 100mph instead of 125mph.
 

CEN60

Member
Joined
17 Dec 2018
Messages
267
Spotted on scot-rail - ScotRail to scrap seat reservations- https://www.scotsman.com/news/trans...IqGPpVdQV3KkW_b9ECLi3Pw-lBGAOu4n6BlmTEv_jb6iw - presumably this is to save all the “reservations may not match” messages that you see on Journeycheck when a 170 or 158 replaces an HST and they’ll be retaining some sort of quota controlled advance product

I am not looking forward to my Glasgow - Inv trip pre Christmas (and return) on the back of this news - it's bad enough with reservations in place - this will be total carnage!
 

Speed43125

Member
Joined
20 Jul 2019
Messages
1,136
Location
Dunblane
Not everything is 55years old though, & that would be the earliest built ones.
The engines will be 25years old in 2030.

They will also not be running at anywhere near the stresses that they used to; 4/5 carriages instead of 6-9, 100mph instead of 125mph.
Although, lots of stop start, especially with a few new stations planned. At some point hopefully we'll get parts of the HML cleared to >100 mph, but for now, that lower speed stop start will not do the engines any favours,
 
Last edited:

InOban

Established Member
Joined
12 Mar 2017
Messages
4,213
Although, lots of stop start, especially with a few new stations planned. At some point hopefully we'll get parts of the HML cleared to >1000 mph, but for now, that lower speed stop start will not do the engines any favours,
I assume that you mean that all diesel engines need significant periods of full throttle working. In which case they will get plenty on the climb from Inverness to Slochd and either side of Drumochter.
 

BRX

Established Member
Joined
20 Oct 2008
Messages
3,625
55 years old. Has any railway in Europe ever run such geriatric stock on long distance services?
There are still quite a lot of Eurofirma coaches knocking around on the continent, and they are similar age or slightly older than the HSTs. I think there are also some of these, dating from the 50s/60s, still around in various states of refurbishment. So I think the answer is yes.
 

John Bishop

Member
Joined
15 Nov 2018
Messages
584
Location
Perth
I assume that you mean that all diesel engines need significant periods of full throttle working. In which case they will get plenty on the climb from Inverness to Slochd and either side of Drumochter.

You say that, but HSTs will climb Drumochter in notch 3 once up to line speed if stopping at Blair Atholl. Same with up to Slochd, very little time spent in notch 5.
 

Speed43125

Member
Joined
20 Jul 2019
Messages
1,136
Location
Dunblane
I assume that you mean that all diesel engines need significant periods of full throttle working. In which case they will get plenty on the climb from Inverness to Slochd and either side of Drumochter.
My understanding is, like a car, they are happiest cruising along at their design speed (be it 100, 125 or otherwise), accelerating hard out of little stations will only create wear and tear on traction motors and the power units that will decrease the life of the power cars. That's why the LNER sets tend to be in better condition, less people getting on and off, less accelerating back up to line speed, just loads of miles sitting happily at 125.
 

y3j

Member
Joined
29 Nov 2019
Messages
21
So another breakdown blamed on the Speedo

ScotRail has a program of maintenance including sorting that.

So frustrating

Which power car had the fault? I understand they are still removing the ATP kit which is the prime cause of the speedo failures. Once configured back to original speedo its just a meter, two wires and the WSP rack.
 

43096

On Moderation
Joined
23 Nov 2015
Messages
15,255
My understanding is, like a car, they are happiest cruising along at their design speed (be it 100, 125 or otherwise), accelerating hard out of little stations will only create wear and tear on traction motors and the power units that will decrease the life of the power cars. That's why the LNER sets tend to be in better condition, less people getting on and off, less accelerating back up to line speed, just loads of miles sitting happily at 125.
They’ve done 40 years reliably on a variety of high speed duties, from long-distance high speed to GW “Thames Valley” metro. Engines and other components are on a maintenance regime that reflects their duty cycle - so I really don’t see the issue.
 

Speed43125

Member
Joined
20 Jul 2019
Messages
1,136
Location
Dunblane
They’ve done 40 years reliably on a variety of high speed duties, from long-distance high speed to GW “Thames Valley” metro. Engines and other components are on a maintenance regime that reflects their duty cycle - so I really don’t see the issue.
I agree, It shouldn't be an issue, but current ScR reliability shows otherwise.
 

InvHst

Member
Joined
9 Dec 2018
Messages
268
Ah the good old Speedo fault ironically that none of the fitters can fix before the train leaves the station funny thing is it's actually a really easy fix Inverness had the issue once with the 1727 Inverness to Glasgow service HST was about to be cancelled as the fitters couldn't fix it driver train manager came downloa and fixed immediately.... So how are the maintenance teams not knowing this fix
 

cf111

Established Member
Joined
13 Nov 2012
Messages
1,348

mcmad

Member
Joined
11 Mar 2015
Messages
978
What's your solution then, given where we are now? And no, you can't have a time machine to go back and change things.
SO we've just to sit in silence with a steadily declining service North of the central belt until the franchise is up in 2025?
 

Struner

Member
Joined
13 Dec 2018
Messages
767
Location
Ommelanden, EU
55 years old. Has any railway in Europe ever run such geriatric stock on long distance services?
There are still quite a lot of Eurofirma coaches knocking around on the continent, and they are similar age or slightly older than the HSTs. I think there are also some of these, dating from the 50s/60s, still around in various states of refurbishment. So I think the answer is yes.
but those are coaches.
& there are some Mk2s in regular service as well I believe. They predate the HSTs.
 

Highland37

Established Member
Joined
29 Jun 2012
Messages
1,259
Is that your solution?

My solution would be to firstly recognise the current situation which is that the fleet does not exist and the little that has been delivered, isn't that great.

Secondly, continue with the bear minimum of HSTs and units as the interim situation as long as required to deliver a new fleet which is probably at least 6 years.

But recognise that the current plans aren't working.
 

Paul Kerr

Member
Joined
6 Nov 2017
Messages
143
My solution would be to firstly recognise the current situation which is that the fleet does not exist and the little that has been delivered, isn't that great.

Secondly, continue with the bear minimum of HSTs and units as the interim situation as long as required to deliver a new fleet which is probably at least 6 years.

But recognise that the current plans aren't working.

I agree things need to change, but as someone pointed out earlier the issue which caused a cancellation yesterday was a speedo fault which is a simple fix and could have been reset if the fitter had the knowledge. Something is failing badly organizationally if a driver knows how to fix it and the maintenance crew doesn't. It looks like a classic case of the left hand not talking to the right. As @43096 and others have pointed out, these trains are running better elsewhere, and the data backs that up. I would argue the problems aren't with the trains themselves, and Wabtec seems to become a scapegoat for other issues which are much closer to home. I'm not blaming the crews; they are doing their best I'm sure. This seems to be a training or management system issue if the crews don't have adequate knowledge of the kit they're working with. Fix the organizational issues and make sure the teams are properly equipped for success; bringing in a new fleet of trains is just going to result in the same problems if the training and management system is inadequate.
 
Last edited:

Highland37

Established Member
Joined
29 Jun 2012
Messages
1,259
How on earth you can look at the facts and not blame wabtec is beyond me. They have failed in every possible way.

At a time when every other operator of HSTs is reducing their use, for good reasons, ScotRail are attempting to do the opposite.

How anyone can objectively look at the situation, without nostalgia goggles on, and not conclude that the entire project is a disaster...
 

Cashew

Member
Joined
22 Mar 2019
Messages
32
I agree things need to change, but as someone pointed out earlier the issue which caused a cancellation yesterday was a speedo fault which is a simple fix and could have been reset if the fitter had the knowledge. Something is failing badly organizationally if a driver knows how to fix it and the maintenance crew doesn't. It looks like a classic case of the left hand not talking to the right. As @43096 and others have pointed out, these trains are running better elsewhere, and the data backs that up. I would argue the problems aren't with the trains themselves, and Wabtec seems to become a scapegoat for other issues which are much closer to home. I'm not blaming the crews; they are doing their best I'm sure. This seems to be a training or management system issue if the crews don't have adequate knowledge of the kit they're working with. Fix the organizational issues and make sure the teams are properly equipped for success; bringing in a new fleet of trains is just going to result in the same problems if the training and management system is inadequate.
I totally agree with everything you have said, but I do think that Wabtec have to take some of the blame too.
 
Status
Not open for further replies.

Top