• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Locomotive Hauled GE Trains now no more

Status
Not open for further replies.

Tio Terry

Member
Joined
2 May 2014
Messages
1,178
Location
Spain
I've just read an article in the Eastern Daily Press that tells us that the last timetabled loco hauled train on the GE between Liverpool St and Norwich has run. It says because of the Coronavirus issues there was no celebration run to mark this event, which seems a pity after about 170 years of loco hauled trains. Seems the 91's are off to freight work and the coaches will be scrapped because they don't comply with the current PRM requirements.

I remember watching Britannia's at Thorpe Junction as a child, EE Type 4's (D200 was one) and 47's before being part of the electrification project north of Colchester and the introduction of electrically hauled trains.

Seems a pity it's passed without some form of recognition.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Brissle Girl

Established Member
Joined
17 Jul 2018
Messages
2,619
I agree it's a shame, but in the grand scheme of things it falls into the very unimportant category at the moment. Though I am wishing I had caught a 91 on the services, as that would have been a real coup.

It's amazing how one's attitude to things that would have seemed important suddenly changes when one's main hope for the year is that I see the end of it.
 

gimmea50anyday

Established Member
Joined
8 Jan 2013
Messages
3,456
Location
Back Cab
91? You mean 90’s. 91s are still in service with LNER and some of the 90s will be deployed on Blackpool-Euston services so all is not lost
 

chubs

Member
Joined
30 Oct 2012
Messages
656
As far as commuters and average travellers are concerned GOOD, good riddance.

Shame a farewell tour cant be organised for those interested but maybe in a few months time there will be enough junk left that hasn't been scrapped yet to cobble together to run a tour.
 

Tio Terry

Member
Joined
2 May 2014
Messages
1,178
Location
Spain
As far as commuters and average travellers are concerned GOOD, good riddance.

Shame a farewell tour cant be organised for those interested but maybe in a few months time there will be enough junk left that hasn't been scrapped yet to cobble together to run a tour.

Would be nice!

Maybe Britannia on the Norwich end and a preserved 40 (EE Type 4 to me!) on the London end! Yes, I'm dreaming again.
 

brad465

Established Member
Joined
11 Aug 2010
Messages
7,026
Location
Taunton or Kent
Was this the planned time for Class 90s to cease on this route, or has the emergency timetable meant that fewer services overall for the foreseeable future meant that the Stadler introduction has been sufficient enough to cover the current service?
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
Was this the planned time for Class 90s to cease on this route, or has the emergency timetable meant that fewer services overall for the foreseeable future meant that the Stadler introduction has been sufficient enough to cover the current service?

The original plan was that they were all gone before 2020 (PRM-TSI deadline) but they were subsequently granted derogations until April because of lack of (reliable!) 745s so more or less on time to that plan. COVID19 will have shortened it by a little, but not much
 

306024

Established Member
Joined
23 Jan 2013
Messages
3,946
Location
East Anglia
Ahhhh, the days of the Stratford 47's....

Now you are talking :) Everyone will have their favourite era.

The virus has done GA a favour with regard to the Mk3 withdrawal. Could have been a bit tight providing enough trains from 01/04/20.
 

chubs

Member
Joined
30 Oct 2012
Messages
656
The original plan was that they were all gone before 2020 (PRM-TSI deadline) but they were subsequently granted derogations until April because of lack of (reliable!) 745s so more or less on time to that plan. COVID19 will have shortened it by a little, but not much

I think you mean the lack of 745's rather than reliable ones? Reliability has been pretty good.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
31,385
Was this the planned time for Class 90s to cease on this route, or has the emergency timetable meant that fewer services overall for the foreseeable future meant that the Stadler introduction has been sufficient enough to cover the current service?
Yes it was already the plan, the GA LHCS only had a PRM dispensation for use until 30 Mar 2020 - there’s another discussion about it in the rolling stock forum:
https://www.railforums.co.uk/threads/ga-class-90-mark-3-sets-withdrawal.197429/page-5#post-4508231
 

Domh245

Established Member
Joined
6 Apr 2013
Messages
8,426
Location
nowhere
I think you mean the lack of 745's rather than reliable ones? Reliability has been pretty good.

Generally yes, although there was a period following a lengthy sit-down for one of the units were nothing was introduced for a while. I think the debacle with the 755s at the end of last year also impacted on the introduction of the 745s
 
Status
Not open for further replies.

Top