Dawlish Sea Wall (Section Two) Proposals Unveiled by Network Rail.

Status
Not open for further replies.

fgwrich

Established Member
Joined
15 Apr 2009
Messages
9,279
Location
Between Edinburgh and Exeter
As revealed by Network Rail today. This section covers the area from Coastguards to Colonnade breakwaters and includes the station area. Whilst I like the idea of the bridge, I cannot say that I'm a fan of it to be honest, with the rather bulky concrete "promenade" sweeping up the underside of the station, and the now standard and rather ugly new compliant footbridge completely breaking the character of the station.

Edit. The more I look at it, the less I like it. The footbridge has the appearance as if it's landed straight from a 1960s council estate again, the era of Concrete Brutalism. I also wonder how effective the lifts will be after a drenching in a storm, and why does the footbridge have to be an open design - That'll be useless in stormy weather.

https://www.networkrailmediacentre....the-vital-link-it-provides-for-the-south-west

Plans unveiled for remaining section of £80m Dawlish sea wall that will protect the railway and the vital link it provides for the south west​


As work progresses on the first section of the new sea wall at Dawlish, Network Rail has shared plans for the remaining section of the £80m project which will protect the railway, passengers and pedestrians whilst improving the long-term resilience of the line which links Devon and Cornwall to the rest of the UK.

The plans for the latest section of the new sea wall, which runs for 415m between Coastguards and Colonnade breakwaters, includes a new taller sea wall incorporating a high-level wider and safer public promenade, pedestrian access to the beach and footbridge to link the two parts of the sea wall and an accessible station footbridge with lifts.

The reconstruction of the timber seaward platform at Dawlish station will also improve accessibility, making it easier for passengers to get on and off trains at the Grade II listed station, which is used by more than half a million people each year.

The new structure will provide greater protection from rising sea levels and extreme weather for generations to come. The wider, safer promenade will retain the views of the renowned coast – and allow walkers, families and people with disabilities to safely enjoy the coastal path between the railway and the sea.

There will be raised areas with seating on the promenade, which will be enhanced by the removal of pigeon roosts – leading to a cleaner walkway and improved water quality....
 
Last edited by a moderator:
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

30907

Veteran Member
Joined
30 Sep 2012
Messages
17,989
Location
Airedale
Given that Dawlish station, unusually for the area, seems to be a concrete construction, a concrete lift tower isn't totally out of place (though they could have done slightly better IMO).
 
Joined
21 Oct 2012
Messages
937
Location
Wilmslow
Crumbs - this looks like the German fortifications on Guernsey or the Normandy beaches. The station is Grade II listed - only the 1950s canopies are of 'concrete construction' - I predict this will get rejected at planning.
 

Devonian

Member
Joined
10 Sep 2019
Messages
195
Location
Totnes
Crumbs - this looks like the German fortifications on Guernsey or the Normandy beaches

My thoughts precisely - at least those sea walls have proved to be extremely durable!

The existing station is a mixture of render, stucco and granite facing. The new footbridge will offer a distinct contrast, and blend better with the new wall than the station. It does seem a little strange, when such care was taken in 2013 to build a fibre-reinforced polymer replica of the Dawlish's traditional covered bridge (which will remain open), to add such a discordant structure now - but I suspect the need for long-term strength and low maintenance trumps aesthetics here.
 

Revilo

Member
Joined
13 Jan 2018
Messages
279
I have a number of concerns with this:

1. Hidden as the last item on the consultation is demolition of the Coastguard’s Boathouse, said to have been designed by Brunel. Though not listed, it is a positive building in the Conservation Area (though listed status did not stop NR getting permission to demolish the signal box).

2. I think the footbridge is massive, and over-engineered. There is already step-free access to the Exeter-bound platform. Surely there’s a easier way of accessing the Teignmouth-bound platform. Or it has to be accepted that the station just can’t be 100% step free.

3. In time there’s a risk the original footbridge will be closed and removed, as at St Austell. Network Rail have tried and so far failed to replace the footbridge at St Erth though.
 

HowardGWR

Established Member
Joined
30 Jan 2013
Messages
4,983
Crumbs - this looks like the German fortifications on Guernsey or the Normandy beaches. The station is Grade II listed - only the 1950s canopies are of 'concrete construction' - I predict this will get rejected at planning.
Planning consent or Listed Building consent? Both will need to be applied for.
 

Malcolmffc

Member
Joined
19 Mar 2017
Messages
300
I have a number of concerns with this:

1. Hidden as the last item on the consultation is demolition of the Coastguard’s Boathouse, said to have been designed by Brunel. Though not listed, it is a positive building in the Conservation Area (though listed status did not stop NR getting permission to demolish the signal box).

2. I think the footbridge is massive, and over-engineered. There is already step-free access to the Exeter-bound platform. Surely there’s a easier way of accessing the Teignmouth-bound platform. Or it has to be accepted that the station just can’t be 100% step free.

So disabled people can’t use the railway because you don’t like the look of the bridge? Seriously?!
 

MotCO

Established Member
Joined
25 Aug 2014
Messages
4,124
Presumably concrete has been used for its resilience, but that does not excuse poor design.

The ultimate question is will it mean that the line is not closed during bad weather. Is there enough foreshore protection? Thinking further about this, can the line along the coast at the vulnerable parts be placed in a tunnel type cover to mitigate against trains being unable to use the line in stormy weather? Surely this would be cheaper than the much requested Dawlish Avoiding Line.
 

37424

Member
Joined
10 Apr 2020
Messages
1,064
Location
Leeds
Well I can see a couple of my favorite photo locations around there going down the pan, but then there isn't a lot worth photographing for me on that line these days. Still that's not going to factor into the equation. Considering they are already on with the 1st bit i'm surprised they have yet to submit the plans.

The footbridge does look like something out of the late 60's but I guess it needs to be robust, and clearly the whole seaward platform does need a much more robust solution which this certainly is, but the whole area is going to look somewhat ugly concrete jungle compared to now, surely they could engineer the concrete with some kind of stone block facing that's a bit more in character.
 

HSTEd

Veteran Member
Joined
14 Jul 2011
Messages
16,701
I'm not sure the footbridge being unusable in stormy weather is that big of a problem given that the same weather will make standing on the seaward platform unpleasant, and going down onto the beach even more so.

Ofcourse there is always the alternative of reducing Dawlish to a single platform, and having appropriate crossovers at each end to allow bypass trains to use the track that is currently served by the seaward platform.
 

30907

Veteran Member
Joined
30 Sep 2012
Messages
17,989
Location
Airedale
Surely there’s a easier way of accessing the Teignmouth-bound platform.
A simple lift tower at the down 3nd of the platform would provide access under the existing Dawlish Water viaduct. If that's impassable, I presume the down line will be closed (or you could put a covered way under the viaduct)

Ofcourse there is always the alternative of reducing Dawlish to a single platform, and having appropriate crossovers at each end to allow bypass trains to use the track that is currently served by the seaward platform.
Not with the present level of service, I think - 4-5 tph each way. Though it will be interesting to work out how far the works will reduce the need for restrictions.
 
Joined
4 May 2012
Messages
309
Quoting a short section of the statememt:
"The Department for Transport and Network Rail have been working tirelessly to determine what needs to be done in order to protect this vital transport artery for Devon and Cornwall" (my italics). Now, assuming the people involved are professionally qualified, knowledgeable of different options, and aware of cost limitations etc, should they not deserve some credit and support for achieving the goals of greater resilience for the route, and access to the station for all, which many of us take for granted. With some of the attitudes here, we would still be using horses and carts for transport.
 

37424

Member
Joined
10 Apr 2020
Messages
1,064
Location
Leeds
Quoting a short section of the statememt:
"The Department for Transport and Network Rail have been working tirelessly to determine what needs to be done in order to protect this vital transport artery for Devon and Cornwall" (my italics). Now, assuming the people involved are professionally qualified, knowledgeable of different options, and aware of cost limitations etc, should they not deserve some credit and support for achieving the goals of greater resilience for the route, and access to the station for all, which many of us take for granted. With some of the attitudes here, we would still be using horses and carts for transport.
True but it is a very scenic coastal resort that happens to have a mainline railway plonked on its frontage, it would be nice to try and come up with solutions that are a bit more in character of the area. This does look a bit like something designed in the 60's when no consideration was given to such things.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
31,376
The continuous high level “promenade” along the sea wall past the station must be considered a good thing, with the new bridge over the colonnade section. Doesn’t that make the walkway available at all states of the tide?

I‘m slightly surprised that they’re embedding access for all lifts into the same application. I’d have thought it possibly better to get the coastal defence issues sorted, and apply for lifts separately.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
38,933
Location
Yorks
I see from the Cornwall Railway Society's website that the new coastal wall is in place along stretches.

My question is to anyone who has been along this stretch in the train since. Can you still see the sea from the train window ?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
31,376
I see from the Cornwall Railway Society's website that the new coastal wall is in place along stretches.

My question is to anyone who has been along this stretch in the train since. Can you still see the sea from the train window ?
Yes you definitely can, from a normal seated position. The new wall is about level with the bottom of the windows; what you can no longer see easily is the beach. The finished walkway level will leave the wall height at about 1.1m, it is yet to be installed.

But live progress can be seen on one of the Dawlish beach cams, the one that’s live streamed on YouTube is easy to find...
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
38,933
Location
Yorks
Yes you definitely can, from a normal seated position. The new wall is about level with the bottom of the windows; what you can no longer see easily is the beach. The finished walkway level will leave the wall height at about 1.1m, it is yet to be installed.

But live progress can be seen on one of the Dawlish beach cams, the one that’s live streamed on YouTube is easy to find...

Ah thanks. So does that mean that when the walkway is finished, it will come above window height ?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
31,376
Ah thanks. So does that mean that when the walkway is finished, it will come above window height ?
No, the walkway will be significantly higher than it was, and above typical rail level, but still 1.1m below the wall top.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
31,376
Ah cheers.

I'm glad the sea is still visible from the train !
I‘ve taken a screen grab from a planning drawing which gives the general idea. Many of the outer wall sections are in place but I don’t think they’ve done any of the lower wall on the railway side.
C83137D8-70DE-4871-B6D6-EEFD39EC12D4.jpeg
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
38,933
Location
Yorks
Thanks, that's the best diagram I've seen of it, in terms of visualising the difference.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
31,376
Thanks, that's the best diagram I've seen of it, in terms of visualising the difference.
As I write they are just starting to install more outer wall sections, extending towards the station end of the previously installed wall, the work is visible in a fair amount of detail on the Dawlish Beachcam...
 
Last edited:

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
38,933
Location
Yorks
As I write they are just starting to install more wall sections at the station end of the existing sea wall, the work is visible in a fair amount of detail on the Dawlish Beachcam...

Ah cheers, I might check that out !
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
31,376
Ah cheers, I might check that out !
Further quick update, if you check out the Dawlish beachcam you can now see just a few inner wall sections in place. The walkway slab will eventually be raised to the height of the drain holes half way up the outer wall sections.
 

nlogax

Established Member
Joined
29 May 2011
Messages
5,368
Location
Mostly Glasgow-ish. Mostly.
Thanks for the beachcam link. I now get a view of the beach, the trains and the sun. Far nicer to look at than the soggy view of a car park out of my own window :)

As for the design.. nothing wrong with it as long as it gets the job done by increasing the reliability of the railway while maintaining the views for both rail passengers and pedestrians.
 

Cletus

Established Member
Joined
11 Dec 2010
Messages
2,230
Location
Dover
There's also the other direction for a view towards Dawlish Warren.
 

Cletus

Established Member
Joined
11 Dec 2010
Messages
2,230
Location
Dover
Interesting video from the Dawlish Camera people showing work going on from the sea-side of the station.
 