4-SUB 4732
Established Member
- Joined
- 7 Jan 2018
- Messages
- 2,150
ORR Track Access - Go to Page 348.
So, are we expecting to see an hourly service on the EWRL right through from "Out East" to/from Bristol via Bath using 185s?
Departure times are already modelled for Bristol Temple Meads including 08:09, 09:14, 10:11 and 11:02.
East-West Rail services to Bristol are proposed to travel via Bath Spa. This means they will need to arrive and depart Bristol East Junction via the Down and Up Main Lines from North Somerset Junction. According to the Timetable Planning Rules, services from Oxford and the Cotswolds require a 15- minute turnround time at Bristol Temple Meads. This is possible by flexing the time of one service: amending the arrival of 1C02DA at Bristol East Junction until 08:13:00 (therefore arriving into Bristol Temple Meads at 08:14:30) Table 16 shows the times of the trains created in TPS. These are based on Class 185 Diesel Multiple Units (DMUs) operating on two engines.
So, are we expecting to see an hourly service on the EWRL right through from "Out East" to/from Bristol via Bath using 185s?
Departure times are already modelled for Bristol Temple Meads including 08:09, 09:14, 10:11 and 11:02.