The North Downs line has had some issues over the past week with speed restrictions due to a track defect but has now been escalated as a landslip at Wanborough with earthworks required to rectify the issue. The Up Line is currently blocked and is expected to open around 9-11th January. Trains are terminating at Ash.
Last edited: