Thepacerfan
Member
I noticed that thameslink trains have started running under a headcode 2 instead of 9. Does anyone know why this is. Thanks
The London Kings Cross to Cambridge slows have always had a class 2 headcode. The through trains are still class 9.I noticed that thameslink trains have started running under a headcode 2 instead of 9. Does anyone know why this is. Thanks
I noticed that thameslink trains have started running under a headcode 2 instead of 9. Does anyone know why this is. Thanks
Did it last year with a rail replacement bus from Mill Hill Broadway to St Pancras.If you’ve ever wanted to travel on the Down Fast in the Up direction between Radlett and Mill Hill, now is your chance.
Did it last year with a rail replacement bus from Mill Hill Broadway to St Pancras.
Still a few moves I like to do on the MML including using the Hendon lines and flyover.
Will look at timings then as it's the only major infrastructure I've not done south of Bedford.You could have done that over the last 4 days too. Also a chance to do it over the early May Bank Holiday weekend. You’ll need to get on an EMR service to/from St Pancras.
Will look at timings then as it's the only major infrastructure I've not done south of Bedford.
You could have done that over the last 4 days too. Also a chance to do it over the early May Bank Holiday weekend. You’ll need to get on an EMR service to/from St Pancras.
Any Thameslink train that travels through the thameslink core, or runs on the south east route must have a class 9 headcode if its passenger service.
Thanks that makes senseThe London Kings Cross to Cambridge slows have always had a class 2 headcode. The through trains are still class 9.
No class 2 headcodes at Blackfriars today.
https://www.realtimetrains.co.uk/se...02/0200-0159?stp=WVS&show=pax-calls&order=wtt
Mill Hill / Harpenden to Bedford today are class 2 because they aren't running through the Core due to engineering work.
https://www.realtimetrains.co.uk/se...2/0200-0159?stp=WVS&show=all&order=wtt&toc=TL
Thanks that makes sense
The latest NR Train Planning Rules (available to all on their website) states that 9Uxx will no longer be CBG-MDEI think the Cambridge to Maidstone service (if it ever happens!) would be 9Uxx.
The May 2018 had a couple of fragments of this left in, for example a 5U33 ECS move. Subsequent timetables tidied this up to something more akin to what we usually see on the GN side.
Welwyn to Sevenoaks I suspect would be 9Yxx.
The latest NR Train Planning Rules (available to all on their website) states that 9Uxx will no longer be CBG-MDE