Just seen pic; of the new footbridge at Debden Central line and am encouraged to see that as far as I can tell ,it seems to have clearance for full-size stock. This is an unusually forward-looking step for these days- anything to do with the use of a surface- gauge Tmm7 track vehicle which had to be bought in by road to Hainault?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Lewlew

Member
Joined
15 Oct 2019
Messages
748
Location
London
That part of the line and station was built by the Great Eastern Railway running full size steam trains. It was taken over by London Transport in 1949. The bridge is quite old so will assume it dates back to BR days

Ignore me! Didn't know the station was going step free and got a new bridge
 
Last edited:

BrianW

Established Member
Joined
22 Mar 2017
Messages
1,448
Just seen pic; of the new footbridge at Debden Central line and am encouraged to see that as far as I can tell ,it seems to have clearance for full-size stock. This is an unusually forward-looking step for these days- anything to do with the use of a surface- gauge Tmm7 track vehicle which had to be bought in by road to Hainault?
That part of the line and station was built by the Great Eastern Railway running full size steam trains. It was taken over by London Transport in 1949. The bridge is quite old so will assume it dates back to BR days

Ignore me! Didn't know the station was going step free and got a new bridge
 

SynthD

Member
Joined
4 Apr 2020
Messages
1,155
Location
UK
Was it easier to be given planning permission if it matches the old one in some way?
 

AM9

Veteran Member
Joined
13 May 2014
Messages
14,243
Location
St Albans
Was it easier to be given planning permission if it matches the old one in some way?
I would say that it was easier to install a standard type and size of an approved, partly prefabricated footbridge with lifts such as is being installed at many NR stations. Engneering a structure that is three foot lower just because the trains running under it have a smaller loading gauge would probably cost a lot more in total. Of course there's marginally more electricity going to be used raising the lifts to that extra height, but some of that can be reclaimed by regen and feeding it back into the grid. ;)
 

bassmike

On Moderation
Joined
23 Aug 2010
Messages
143
Location
lenham kent
Not quite what was done with the M 25 bridge on the Ongar section, or in several places on the northern and piccadilly-----
 
Status
Not open for further replies.

Top