• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Transpennine Route Upgrade and Electrification updates

Revaulx

Member
Joined
17 Sep 2019
Messages
476
Location
Saddleworth
Completely agree. I was angry at first when Grayling announced bimodes. I have since changed my mind. As long as bimodes are part of a strategy to have a rolling program of electrification, they are very useful.
Indeed. Without the possibly of using bimodes at some point, the case for wiring even the core of the Cross Country network would be pretty weak.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

hwl

Established Member
Joined
5 Feb 2012
Messages
7,354
Indeed. Without the possibly of using bimodes at some point, the case for wiring even the core of the Cross Country network would be pretty weak.
And having cross country units as bi-modes would improves business cases on some shared routes e.g MML Derby-Sheffield
 

WAO

Member
Joined
10 Mar 2019
Messages
657
Bi-modes cut two ways of course; they can maximise electric running on the existing network but also enable an investment averse government or railway administration to avoid extending the wires. They are expensive, though.

(p s, I did say c16.5kN, c = about)

WAO
 

Class 170101

Established Member
Joined
1 Mar 2014
Messages
7,908
Bi-modes cut two ways of course; they can maximise electric running on the existing network but also enable an investment averse government or railway administration to avoid extending the wires. They are expensive, though.

WAO
Of course now that the government is paying the costs of the railway including diesel fuel and more expensive DMUs is there now any more of an incentive to change from DMUs to EMUs?
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
67,433
Location
Yorkshire
Just a gentle reminder this thread is to discuss updates regarding the Transpennine route upgrade.

Feel free to create a new thread (if there isn't one already) if you wish to discuss anything else :)
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,476
Location
Between Peterborough & Bedlington
Back on the subject of the TRU, what is the progress during the blockade?
Day 1: https://www.linkedin.com/posts/tru-...losure-31st-activity-6827220758851313664-XUHo
Day 2: https://www.linkedin.com/posts/tru-...losure-31st-activity-6827657071530455040-JwXu

The Rochdale Slows' bridge deck at Dantzic St has been removed, as has the parapet of Queens Rd at Miles Platting. Bromley St subway beneath the Rochdale Slows has been strengthened. Signal heads east of Man Vic have also been replaced.

Elsewhere, I've learnt that the first of 6 weekends of track renewals on the Normanton lines in the Burton Salmon area has just gone; this is presumably to facilitate the route via Castleford, Normanton & Healey Mills being used as a diversionary route in the not-so-distant future. NR have also set up a compound in the Burton Salmon area for this (although I can't find it on google maps)
 
Last edited:

Ploughman

Established Member
Joined
15 Jan 2010
Messages
2,882
Location
Near where the 3 ridings meet
The track access point at Burton Salmon was for many yars the old Station site where the A162 crosses the 4 tracks.
Restricted access was possible to the North side of the Normantons.
A further access to the Ferrybridge lines only was about 1/2 mile South at a farm crossing.
The 4 track LC at Betteras Hill could also be used for any track access.
 

CrickUK

Member
Joined
23 Aug 2017
Messages
30
There is a drilling rig undertaking SI in the carpark at Garforth, drilling is taking place in the disabled bays alongside the track and could either be investigation for electrification mast piles or for DDA improvements in the form of a new footbridge. Does anyone know what is going on?
 

hwl

Established Member
Joined
5 Feb 2012
Messages
7,354
So is that new signal heads on an existing gantry (pic 4)?
Presumably near the current Bromley St wiring boundary.
Possibly but physically the only look large enough to be 3 aspect so are they something else?
 

Meerkat

Established Member
Joined
14 Jul 2018
Messages
7,419
Possibly but physically the only look large enough to be 3 aspect so are they something else?
I was wondering about them - don’t signals normally have elaborate cages around them now so they can be maintained safely?
 

zwk500

Veteran Member
Joined
20 Jan 2020
Messages
13,227
Location
Bristol
Possibly but physically the only look large enough to be 3 aspect so are they something else?

I was wondering about them - don’t signals normally have elaborate cages around them now so they can be maintained safely?
The signals look quite similar to lightweight LED ones installed on the WCML among other places: https://crown-international.co.uk/gantry-pole/

Presumably they can be raised up to the gantry for work to take place, and the LED means they only need 2 heads to show the full 4 Aspects.
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
24,793
Location
Nottingham
I was wondering about them - don’t signals normally have elaborate cages around them now so they can be maintained safely?
Some of the newer post signals fold down for access. I think there are now some gantries without access arrangements - I presume maintenance of LEDs is considered to be rare enough (and these days probably needs a possession anyway) that it can be done from a road-rail platform of some type. This also avoids the need to maintain the accesses themselves.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
7,354
I was wondering about them - don’t signals normally have elaborate cages around them now so they can be maintained safely?
Not new fit and forget LED ones that don't need bulbs changing!
This then reduces reduces the size (and cost of the) gantry. (Access with RRV and OHLE isolated)

Also see new (2 person) fold down ground mounted lightweight types.
 

Revaulx

Member
Joined
17 Sep 2019
Messages
476
Location
Saddleworth
Not new fit and forget LED ones that don't need bulbs changing!
This then reduces reduces the size (and cost of the) gantry. (Access with RRV and OHLE isolated)

Also see new (2 person) fold down ground mounted lightweight types.
Can one buy these for domestic use? LEDs seem to last barely longer than incandescent bulbs in my house.
 

Mollman

Established Member
Joined
21 Sep 2016
Messages
1,211
There is a drilling rig undertaking SI in the carpark at Garforth, drilling is taking place in the disabled bays alongside the track and could either be investigation for electrification mast piles or for DDA improvements in the form of a new footbridge. Does anyone know what is going on?
I'd go for footbridge as Garforth was on the 2019 list for step free access (actually differed from CP5):
https://www.gov.uk/government/speec...ations-set-to-benefit-from-additional-funding

The stations deferred from Control Period 5, which will now be progressed are:

  • Alfreton (Parkway)
  • Barnes
  • Barry (Town)
  • Battersea Park
  • Cathays
  • Chatham
  • Garforth
  • Grays
  • Hither Green
  • Liverpool Central
  • Llanelli
  • Luton
  • Market Harborough
  • Northallerton
  • Peckham Rye
  • Petts Wood
  • Queen’s Park
  • Seven Sisters
  • Southend East
  • St Mary Cray
  • Streatham
  • Theale
  • Trefforest
  • Walton-on-Thames
  • Warwick
  • Weston-Super-Mare
  • Worcester Shrub Hill
All work at the stations is due to be completed by the end of March 2024.
 

matacaster

On Moderation
Joined
19 Jan 2013
Messages
1,595
Can one buy these for domestic use? LEDs seem to last barely longer than incandescent bulbs in my house.
LEDs will last a very long time if constantly on (which is how they are able to make the excessive claims for longevity). Turning them on and off shortens their life considerably. At least they give a decent light which those horrible fluorescent bulbs didn't. The halogens were a miss-step too, making Chinese electrical manufactures ecstatic.
 

Revaulx

Member
Joined
17 Sep 2019
Messages
476
Location
Saddleworth
LEDs will last a very long time if constantly on (which is how they are able to make the excessive claims for longevity). Turning them on and off shortens their life considerably. At least they give a decent light which those horrible fluorescent bulbs didn't. The halogens were a miss-step too, making Chinese electrical manufactures ecstatic.
Ah that makes sense. It’ll be why the motion detecting floodlight in my back yard only lasts a few months. I’d assumed it was related to the awful Pennine weather :D
 

InOban

Established Member
Joined
12 Mar 2017
Messages
4,208
Ah that makes sense. It’ll be why the motion detecting floodlight in my back yard only lasts a few months. I’d assumed it was related to the awful Pennine weather :D
It's probably the electronics in the base that fails - transformer/rectifier to create low voltage dc.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
7,354
Ah that makes sense. It’ll be why the motion detecting floodlight in my back yard only lasts a few months. I’d assumed it was related to the awful Pennine weather :D
It's probably the electronics in the base that fails - transformer/rectifier to create low voltage dc.
Plenty of cheap stuff LED stuff fails for a whole variety of reasons mostly not the LEDs themselves!

I gave up buying cheap LED stuff, pay a bit more and it seems to last well
 

matacaster

On Moderation
Joined
19 Jan 2013
Messages
1,595
Ah that makes sense. It’ll be why the motion detecting floodlight in my back yard only lasts a few months. I’d assumed it was related to the awful Pennine weather :D
Oops, done a little research. I am wrong! it's the electronic components rather than led that die on cheaper LEDs. Apologies for misleading you.
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,476
Location
Between Peterborough & Bedlington
Day 5: https://www.linkedin.com/posts/tru-...day-railway-activity-6828937066122940416-KRUV

Network Rail have also updated their page relating to the closure of Lady Anne Level Crossing in Batley: https://www.networkrail.co.uk/runni...nnine-route-upgrade/lady-anne-level-crossing/

Network Rail said:
Having completed a consultation period and revising the designs of the footbridge following detailed feedback, we will be hosting information events to talk with the local community about the designs and answer any questions they might have. We invited local residents to an information event on Thursday 29 July, and we will be hosting a virtual event on Tuesday 03 August for anyone that couldn’t make it.

With these designs shared, our next steps will be to submit a planning application so that we can start to get a better idea of exactly when we will be working in the area. Once we know this, we will be getting back in touch with local residents, to make sure they are up to date with the project.

Lady Anne footbridge proposed sketch

Aerial view sketch of the proposed footbridge

Lady Anne proposed footbridge sketches


The footbridge is more or less a foregone conclusion now, and some artists' impressions have been shared. It looks like part of the abutment of the old Birstall branch will have to be demolished to make way for the new footpath.
 
Last edited:

Top