The upgrade work on the above route is anticipated to be complete by 2014. Will this result in all container trains from Felixstowe presently routed via North London Line being rerouted via Nuneaton - and what if any time savings will this provide?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

GB

Established Member
Joined
16 Nov 2008
Messages
6,457
Location
Somewhere
The route is also generally shorter with regards to time and distance for most of the services but you will still get the odd working via London.
 

Flywaver

Member
Joined
10 Nov 2009
Messages
190
The route already has been upgraded. GBRF have a fair few diagrams that way. FL are doing road learning trips Peterborough Leicester last week.
 

londonmidland

Established Member
Joined
22 Dec 2009
Messages
1,827
Location
Leicester
The route already has been upgraded. GBRF have a fair few diagrams that way. FL are doing road learning trips Peterborough Leicester last week.

Do they do the route learning on weekdays or is it just on weekends?
 
Last edited:

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
29,155
The upgrade work on the above route is anticipated to be complete by 2014. Will this result in all container trains from Felixstowe presently routed via North London Line being rerouted via Nuneaton - and what if any time savings will this provide?

In two words, no and maybe.

The upgrade is to cater for growth from the ports - the recently approved third terminal at Felixstowe for example. The exception is for engineering work - when the GEML is blocked overnight (as happens most weeknights from this January) all the night traffic will have to go via Peterboro'.

Time savings will be entirely due to not having to change engines or run round at Ipswich yard following completion of the new chord. On base timings it is quicker via London.
 

eastdyke

Established Member
Joined
25 Jan 2010
Messages
1,923
Location
East Midlands
'The route already has been upgraded'

Still work to be done which has not yet started on site.

eg (as above) the Ipswich 'bacon' Chord due for construction 2012-14, I believe.
 
Last edited:

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
29,155
It's a classic incremetal upgarde project, with bits coming into service regularly.

First was W10 clearance, next is a capacity upgrade between Bury St Edmunds and Ely (commissioning weekend after next), then Nuneaton North chord (under construction), then Ipswich Chord (2013), Ely - Soham doubling (2014), Leicester resignalling etc etc.

Each bit unlocks a little bit more capacity.
 

TheBigD

Established Member
Joined
19 Nov 2008
Messages
1,991
It's a classic incremetal upgarde project, with bits coming into service regularly.

First was W10 clearance, next is a capacity upgrade between Bury St Edmunds and Ely (commissioning weekend after next), then Nuneaton North chord (under construction), then Ipswich Chord (2013), Ely - Soham doubling (2014), Leicester resignalling etc etc.

Each bit unlocks a little bit more capacity.

Stand to be corrected but Ely-Soham isn't being doubled, but two long loops will be added to the single line.

Also, noticed this morning that the track between Peterborough and Leicester is getting quite rough in places.
 

fsmr

Member
Joined
11 Feb 2009
Messages
659
The route already has been upgraded. GBRF have a fair few diagrams that way. FL are doing road learning trips Peterborough Leicester last week.

tell us about it
The b!! crossings are down in Oakham all the time now before even more containers arrive

There is going at have to be some serious rethinks about the road network around here as it is splitting the town in half. Not using the up goods loop would help, as it can be 10 minutes if the train such as the Ketton cement has to start from the loop with Brooke rd crossing down (interlocked into the starter)
Of course if all those GBRF sheds were replaced by some 37s, things might be better:D
On another note, isnt 2014 a bit late, i thought it was being done due to the Olympics next year with pathing pressure around london not withstanding the loading gauge upgrade
 

Flywaver

Member
Joined
10 Nov 2009
Messages
190
Cambridgeshire County Council are asking local opinions in Ely and surrounding areas about options for a Bypass.. Too little too late. 23mill or 28mill for proposed bridges. The holding Lorry park seems to be best option. Ely already suffers and in these economic times i can't see how a bypass will get the green late. This was all discussed in 2003... Oh dear...
 

Flywaver

Member
Joined
10 Nov 2009
Messages
190
Just realised i meant Peterborough Nuneaton already upgraded....
Although it would be nice to have four tracks from Syston to South Wigston...
 

GB

Established Member
Joined
16 Nov 2008
Messages
6,457
Location
Somewhere
On another note, isnt 2014 a bit late, i thought it was being done due to the Olympics next year with pathing pressure around london not withstanding the loading gauge upgrade

The initial time frame was 2012 to account for the olympics but I suspect there is enough capacity via cross country to cope. There will be no significant increase in traffic from Felixstowe untill the new terminal (end of 2012 currently) is built and even then pathings is severly limited on the branch.

As for the curve at Ipswich, I don't think its going to be the saving grace people (inc NR) wan't it to be as alot of services will still need to run round via the yard which in its self is due to be "remodeled".
 

Waverley125

Member
Joined
2 Sep 2008
Messages
1,008
Location
Leeds, West Yorkshire
the next step i suppose is OHL, which given that the line will, after the stuff announced in the IIP, form a link between 5 northbound electrified main lines is probably a good thing, as well as helping provide the capacity for a half-hourly passenger service (which there's certainly demand for east of Leicester)
 

MK Tom

Established Member
Joined
31 Aug 2011
Messages
2,422
Location
Milton Keynes
Does anyone have a plan of the Nuneaton chord? I went past the works today on my way to Stafford and the preparatory works go a lot further north than I expected.
 

Flywaver

Member
Joined
10 Nov 2009
Messages
190
It's being discussed in mess room talk that the route is starting to get rough in a fair few places. I'm sure a few Speed Restrictions will be in place soon... Oh great more talk of O.H.L... Only means more chaos.. No thanks.. Left all that.
 

Cherry_Picker

Established Member
Joined
18 Apr 2011
Messages
2,796
Location
Birmingham
Does anyone have a plan of the Nuneaton chord? I went past the works today on my way to Stafford and the preparatory works go a lot further north than I expected.

gAbFU.jpg


Its the top link on Google if you search for "Nuneaton Chord"

Looks fairly straightforward. Trains come from the Leicester branch as before but continue through platform 6, they then go over the bridge which takes Birmingham bound trains over the four tracks of the WCML. Instead of going on to Birmingham the new chord swings back towards the WCML, runs alongside it for a while before rejoining X number of SLUs up the road. I presume there will be an up to down crossover on the WCML so trains heading from the north to Felixtowe can also access the new chord and pass through Nuneaton via platform 7. If you are unfamiliar with the area then Nuneaton station is in the extreme top right of the map (actually it is just off the edge of the map) and the whole map has been rotated from the "normal" view because north-south runs from left to right of the picture instead of top to bottom. The WCML is pretty visible as a straightish line four fifths of the way up the map.

It is a pretty significant and rather elegant upgrade if you ask me.
 
Last edited:

TheBigD

Established Member
Joined
19 Nov 2008
Messages
1,991
It's being discussed in mess room talk that the route is starting to get rough in a fair few places. I'm sure a few Speed Restrictions will be in place soon... Oh great more talk of O.H.L... Only means more chaos.. No thanks.. Left all that.

From my trip across to Brum yesterday I can assure you that it's getting very rough in several places. Ketton-Luffenham-Manton and Whissendine-Saxby seemed particularly bad.
 

MK Tom

Established Member
Joined
31 Aug 2011
Messages
2,422
Location
Milton Keynes
That's a good image of it, but yeah I had already found that one :p I was wondering if anyone has a schematic that shows the track layout and bridges etc?
 

The Planner

Veteran Member
Joined
15 Apr 2008
Messages
15,924
Looks fairly straightforward. Trains come from the Leicester branch as before but continue through platform 6, they then go over the bridge which takes Birmingham bound trains over the four tracks of the WCML. Instead of going on to Birmingham the new chord swings back towards the WCML, runs alongside it for a while before rejoining X number of SLUs up the road. I presume there will be an up to down crossover on the WCML so trains heading from the north to Felixtowe can also access the new chord and pass through Nuneaton via platform 7.

That's changed then since I last saw the plans then, if they are coming from Leicester and using the chord, you go bang road through 7. You won't need a crossover as you can reach the Leicester lines from the WCML anyway.
 

Cherry_Picker

Established Member
Joined
18 Apr 2011
Messages
2,796
Location
Birmingham
It was pure conjecture on my part, just going on the map and what makes sense. Having platform 7 as a bi directional platform works too and in a lot of ways makes more sense. I wonder if it would be a true bi directional platform open for passenger services too?
 

Flywaver

Member
Joined
10 Nov 2009
Messages
190
That's going to be an interesting Roller Coaster at Nuneaton. The curve upto the Arley route from WCML is already climbing..
 

Bald Rick

Veteran Member
Joined
28 Sep 2010
Messages
29,155
That has been put back for several years.:-x

Because the port are on the hook for it, know it is expensive, and don't want to pay.

But it raises a good (hypothetical) question.

What would benefit UK plc the most -
a) spending £30m+ on another track for an extra 20 freight trains a day, or,
b) replacing the Felixstowe passenger service with a bus to free up the same capacity
 