If anyone's short of ideas, the points I made relate to:
* Extra capacity and more frequent service on North TPE being good
* Electrification helping to bring down running costs
* 4 car 319s only providing limited additional capacity over existing doubled up Sprinters and unable to run in multiple due to platform lengths and 319s not having SDO. I suggested something like a 377, with enough to run doubled up services at peak time would be better suited to the North West routes.
* More capacity needed through Stockport, in particular for more frequent Chester and Buxton services at peak times.
The topics asked relate to the Ordsall Chord, redevelopment of Victoria station, electrification and Northern Hub in general.
If anyone's short of ideas, the points I made relate to:
* Extra capacity and more frequent service on North TPE being good
* Electrification helping to bring down running costs
* 4 car 319s only providing limited additional capacity over existing doubled up Sprinters and unable to run in multiple due to platform lengths and 319s not having SDO. I suggested something like a 377, with enough to run doubled up services at peak time would be better suited to the North West routes.
* More capacity needed through Stockport, in particular for more frequent Chester and Buxton services at peak times.