Recent content by jyte

  1. J

    Signal upgrade set to modernise Cornwall’s railway

    See, this is what I'd expect them all to look like, I guess. Turns out they don't need to be as complex UX wise.
  2. J

    Signal upgrade set to modernise Cornwall’s railway

    It makes sense (to me, at least!) to keep Roskear as it's such a 'new' panel. I wonder if it's also a convenient interface between St Erth (bells/absolute block) and the new Cornwall workstation (axle counters/train description). Anyone know more? I presume they do somewhere, but do any IECC...
  3. J

    Signal upgrade set to modernise Cornwall’s railway

    Huh, I'm guessing Liskeard signal box is staying. Why did I think that was closing? I think it's funny to think trains will go Plymouth PSB->Liskeard->Cornwall Workstation (at Exeter!)
  4. J

    WCML Trent Valley upgrade

    After TV four tracking, the location of the down fast line switched from being the outer paired by direction line to inner paired by direction line. The logic of this is debatable (as it forces trains further north to slow to 60mph to cross back onto the slow lines to go via Stafford) but at...
  5. J

    HS2 construction updates

    Well apparently Dorothy has got a little over-excited and is now en route to Norway, according to the map...
  6. J

    HS2 construction updates

    Excellent (as normal) ianvisits writeup available here featuring some new photos: https://www.ianvisits.co.uk/blog/2021/07/20/photos-from-the-hs2-tunnel-site-in-northwest-london/ Not sure I can quote the article here, unless I did the whole thing?
  7. J

    Crossrail - Construction updates and progress towards opening (now expected 24 May 2022)

    The number of people who get on the Bakerloo at Paddington then use the cross platform interchange at Baker Street for the jubilee remains impressively high - so crossrail will certainly help with some of those passenger flows.
  8. J

    HS2 construction updates

    Ooh this is fun, I remember the one they did for Crossrail.
  9. J

    HS2 construction updates

    Ahaha, wow. Multiple sources - thanks!
  10. J

    HS2 construction updates

    Just out of interest where are you getting the 15metres/day figure from?
  11. J

    Travel updates related to grounding of Class 80x fleet

    Well that's pretty impressive, it definitely plugs the gap between Swindon and Didcot that at the moment requires you wait for an IET... Any chance they might go a little further (thinking Parkway) if the 800 issues are fairly 'long haul?'
  12. J

    Kings Cross ‘uncrossed’ Layout/Remodelling - Information and Updates

    Is that a signalling gantry spanning all platforms? Do any other large termini have a similar arrangement?
  13. J

    Are the Semaphore signals in Cornwall due for replacement?

    https://www.railengineer.co.uk/cornwalls-capacity-challenge/ https://www.railengineer.co.uk/cornwalls-capacity-triumph/ Plymouth Power Signal Box is really quite old now. Initially the plan was to close that and resignal all of the Plymouth box and the entirety of Cornwall into a new box at...
  14. J

    HS2 construction updates

    This was my first thought, to be honest, but this Crossrail article suggests the machines were fitted with toilets: https://www.bbc.com/future/article/20150602-crossrail-the-monster-tunnelling-under-london-streets. If it's the case they forgot to specify toilets, really need toilets, and...
  15. J

    Question: Upgrade or large renewal schemes successfully completed by RailTrack

    I might be wrong but I remember reading that the Norton Bridge Flyover/Grade Separation was in the original WCRM 'plan', removed, and then built as a separate enhancement in 2016 after NR realised that it would be really useful, but I'm not entirely sure.