• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Recent content by Mike C

  1. M

    Special Offers Discussion

    To clarify: Std Premier gives you a seat in a 1st class carriage and a meal with drinks (the type will depend on the time of travel) which usually consists of 3 small courses served to your seat. Business Premier adds a larger cooked meal (and a choice of meals), and a shorter check in time...
  2. M

    HST Electro-Diesel | Is it possible?

    The transformer doesn't convert from AC to DC - that would be a rectifier (of which there are many different types). A typical modern scheme would be: 1) 25kV/50Hz AC Single phase supply 2) Transformer to step down to something in the ~1000 to 1500v range (still AC) 3) This is then fed to a...
  3. M

    Trains running with one headlight lit.

    It is on HS1 and on SNCF LGV's...
  4. M

    Class 365 Service / Technical Problems

    In my experience: - The "coasting" issue when they lower pantographs under "DC" mode (which is no longer existing) and the AWS can't be over-ridden. - Couplers: I have had a few where there is a unit short of formation because they couldn't couple up. Not in icy weather either - I have...
  5. M

    HST Electro-Diesel | Is it possible?

    They do. Even our 1993 vintage rolling stock has 3 phase motors.
  6. M

    Unpopular opinions

    Spotters think they know more about rolling stock design and operation than those doing it for a living.
  7. M

    Intercity Express Programme going ahead

    I just echo the other comments here. 365s are a good unit, but have even more potential. I can well believe that with some sensible engineering I think 110 is not only possible but actually a good idea. The Peterborough fasts will be able to clear further north before a 125mph train catches up...
  8. M

    Another bad day on the ECML

    Agreed - they did a good job. It has been a hard week for them, but today there was a definite sense of order and control. Job well done under difficult circumstances.
  9. M

    Another bad day on the ECML

    Didn't look good on the way past this morning but the line was reopened at about 0800h.
  10. M

    Favourite Class/Stock

    It used to be Gordon, but I think Henry is under-rated.
  11. M

    Worlds fastest accelerating trains?

    In terms of outright speed, yes, TGV is the world's fastest on a max speed record and in-service average journey speed basis. However I would guess that an N700 or similar would have greater acceleration, especially from a stand due to the extra number of powered axles. I think a TGV-R has the...
  12. M

    Another bad day on the ECML

    Well, yes obviously, but my point is that there is a way around for those going further north. If there wasn't, it would affect many more than use just those 5 stations.
  13. M

    Another bad day on the ECML

    I travelled to work in London this morning from Huntingdon, everything was fine and on time. I left KGX on the 1640 and it arrived spot on time. I guess I have been lucky by the sound of it - dodging the chaos. At least with those stations affected today you can use the Hertford loop.
  14. M

    TGV La Poste at St Pancras 21-03-12

    Being a diesel, the NMT has yet another issue there. It would need to be dragged through. Yes, overhauling carriages to be fire compliant is practically a re-build. Even re-engineering the locos would be prohibitively expensive. You would need to do the same work - new cabling throughout...
  15. M

    TGV La Poste at St Pancras 21-03-12

    In a word - No. In some more words: They won't have the necessary fire compliance (French standard NFF 16-101 for anyone who cares). They don't have the required signalling systems, they don't have the required redundancy (only one pantograph for a start), and in order to make the train long...

Top