• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Recent content by relayer

  1. R

    Signalling Map of the UK

    1628172039 Hope this helps ignore dates - they are up to date
  2. R

    Swindon Cocklebury yard ?

    hope this helps
  3. R

    Ballast under cutter

    Under cutter ? being unloaded Westbury
  4. R

    Disused abutments on A40

    It hadPlank is god painted on it for years, Plank is Petr Clements Uberroady for genx
  5. R

    Chiltern Oxford Link completed

    My understanding is that there is a new line going to be built at the back of the station "Micks" caff side joining up with the new loop (being constructed at Port Meadow) at the moment. is the bridge at Aristotle lane high enough for electrics ?
  6. R

    Chiltern Oxford Link completed

    My understanding is that the workk at Oxford north jcn. is the first stage of remoddeling Oxford. Is this correct?
  7. R

    Oxford Down Loop

    To summerise : they are just reinstating the old layout at Oxford
  8. R

    GWML Electrification progress: Newbury-Reading B&H section

    Three bridges in the Aldermaston area are being raised
  9. R

    Felixstowe-Nuneaton

    is this where the new chord is being built?
  10. R

    De stressing on steel sleepers

    Done miles of stressing on steels.:D Try the vortock rollers it makes life a lot easier. Put the rollers in closer together than the standards state (eg every 10 sleepers instead of 12) Use a rrv to clip unclip or the Cembre machines
  11. R

    Evergreen 3 Phase 1

    Sorry all. thanks to the link posted I can now see that what is called water eaton is actually Banbury Rd grain silo. I was thinking about the hamlet 2 miles away
  12. R

    Evergreen 3 Phase 1

    Sorry I may have missed something!!! But as I live near Water Eaton I know that there is nothing there is a halt to be built there?
  13. R

    Evesham-Worcester redoubling

    OOeer will check my calculations, Oxford North Junction 64 M 00 to Godstow 65 M 20 bit further tham 775 M . But the loop has going to be built with a view to be incorperated with any future OWW works. I dont know if the bridges are all right at the junction. If only the Fairford branch was...
  14. R

    Evesham-Worcester redoubling

    My understanding is that in 2014 a loop line is being installed from Oxford north Junction to Wolvercote

Top