• Our booking engine at tickets.railforums.co.uk (powered by TrainSplit) helps support the running of the forum with every ticket purchase! Find out more and ask any questions/give us feedback in this thread!

Recent content by Southsider

  1. S

    East Kilbride/Barrhead electrification updates

    There are now formers for concrete bases throughout the cutting between Giffnock station and Church road bridge, some have had the concrete poured.
  2. S

    Charlestown, Fife

    Took a trip to Limekilns and Charlestown in Fife this morning.
  3. S

    East Kilbride/Barrhead electrification updates

    Some large trees have been felled at Busby station, presumably in preparation for masts. 1713687851 The platform at Giffnock is not quite finished but six car trains are running again.
  4. S

    East Kilbride/Barrhead electrification updates

    The signs at the station say the works will complete on 23 April.
  5. S

    East Kilbride/Barrhead electrification updates

    Giffnock platform nearly done. I thought they might have laid in mounting points for the electrification masts but nothing visible.
  6. S

    East Kilbride/Barrhead electrification updates

    The Giffnock platform is almost complete, another couple of weeks should see it done. Also, all the twin track cantilevers between Giffnock and Clarkston have booms and wire supports fitted.
  7. S

    East Kilbride/Barrhead electrification updates

    The 14 month timescale has certainly raised lots of eyebrows.
  8. S

    Issue on the West Coast Main Line?

    Heading into Glasgow Central yesterday afternoon and passed a Pendolino between Mount Florida and Crosshill. Was there a problem with the main line? Odd to see such a big train passing through the tight cuttings in that area.
  9. S

    East Kilbride/Barrhead electrification updates

    Booms and other bits have been fitted to some of the masts on the embankment between Church Road and Sutherland Drive.
  10. S

    Car Transporter trains on WCML

    Used to see train loads of Fords in the sidings at Arkleston near Paisley. I often wondered how many of them made it to the dealerships with all their parts intact.
  11. S

    GW 769s to Scotrail?

    What’s that in layman’s terms?
  12. S

    East Kilbride/Barrhead electrification updates

    Some more shots, this time from the Giffnock area. Masts for what I assume will be twin track cantilevers on the embankment between Church Road and Sutherland Drive bridges. Large mast and cantilever at the end of the Giffnock platform extension. Giffnock platform extension. Giffnock...
  13. S

    East Kilbride/Barrhead electrification updates

    I was crossing Strawhill Road bridge this morning and could see lots of single track cantilever masts heading in the direction of Busby. Will get some photos next time I’m on foot. 1711103494 Looking south from Strawhill Road, Clarkston station behind me. Edit : Two large, poured foundations...
  14. S

    East Kilbride/Barrhead electrification updates

    Going by the noise in the distance overnight, there was piling between Clarkston and Busby. They’re certainly pressing on with it.
  15. S

    East Kilbride/Barrhead electrification updates

    There are still some single track structures, look through the trees and you’ll see a couple with cantilevers already attached.

Top