Wonder if someone could provide timescales for the planned resignalling of the North Wales coast line, between Chester and Llandudno,

1) When is work on the ground likely to start? (As far as I know it hasn't yet).

2) When are the signal boxes due to close?

I would like to photograph this line beforehand if possible, and need to plan holiday dates!
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

55z

Member
Joined
21 Nov 2014
Messages
183
According to Modern Railways the Rail Minister Claire Perry confirmed phase 1 of the North Wales resignalling scheme will be complete by the end of Control Period 5 (2019) - phase 1 is Fflint to Llandudno Phase 2 Llandudno to Holyhead would follow in 2021 - either bad reporting or lack of geographical knowledge by the minister as Llandudno gets resignaled twice ! Presumably Llandudno Junction should have been quoted . The Cardiff Area resignalling scheme has been defered until Christmas 2016.
 

jamess

Member
Joined
24 Jul 2011
Messages
80
I was with the Arriva Wales commercial team at a stakeholder yesterday and they advised that the scheme had been abandoned. Any chance that you could send me a copy of the plans please?
 