Is there somebody on here who can report on progress with redoubling of (I think) a seven mile section of the Ebbw Vale branch?
I'm sure it was due to be finished in 2016, and when I last travelled on the line in January of that year, a lot of the new track was already down. We're all used to rail infrastructure projects sliding to the right, but an update on how things are going would be very welcome to this interested observer.
Thanks in advance.
I'm sure it was due to be finished in 2016, and when I last travelled on the line in January of that year, a lot of the new track was already down. We're all used to rail infrastructure projects sliding to the right, but an update on how things are going would be very welcome to this interested observer.
Thanks in advance.