Blackpool - Manchester Electrification

Status
Not open for further replies.

Chrisyd

Member
Joined
16 May 2015
Messages
204
Would this method mean you could have more trains on the line at the end of the day when The Open was at Royal Lytham and St Annes?
So when the first train went a second could come from Blackpool South.

I think the station used is Ansdell & Fairhaven
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

42626

Member
Joined
9 May 2011
Messages
129
Location
Horwich
Noticed this evening that there is now a mast up at Clifton on the station. Will try and get a photo tomorrow.
 

Elecman

Established Member
Joined
31 Dec 2013
Messages
2,899
Location
Lancashire
Would this method mean you could have more trains on the line at the end of the day when The Open was at Royal Lytham and St Annes?
So when the first train went a second could come from Blackpool South.

I think the station used is Ansdell & Fairhaven

It was indeed Ansdell& Fairhaven that was used as the split station, Preston to Ansdell as 1 shuttle and Ansdell to Blackpool South as the other
 

snowball

Established Member
Joined
4 Mar 2013
Messages
7,718
Location
Leeds
The new issue of Rail (845) has an article about recent signalling changes nationwide. The first half of it is about the Blackpool lines. The diagram of the new layout at Kirkham is obviously wrong as it includes no route from Blackpool South to the up line towards Preston.
 

slipdigby

Member
Joined
24 Feb 2011
Messages
38
The new Pendolino services that will be serving Blackpool from the May timetable change now appear in Realtime Trains. There are 3 return trips from/to Euston Monday-Friday stopping at Rugby, Warrington, Wigan and Preston. These are in addition to the existing daily Voyager service.

Hi SansHache!

Just had a quick look at Opentimetrains and cannot see the existing daily Voyager service (calling Poulton and Kirkham) continuing post May-18? Ditto the VT West Coast boking site. Could you advise as to where you got the above information?

Best regards!
Slip
 

Chrisyd

Member
Joined
16 May 2015
Messages
204
Have been through Bolton this morning and it appears that all the safety fencing etc has been removed from near the lift on Platform 5 so the whole length is now available.

Can someone please confirm as a train rather thoughtlessly pulled into Platform 3 blocking my view.
 

bonzawe

Member
Joined
30 May 2014
Messages
89
The new issue of Rail (845) has an article about recent signalling changes nationwide. The first half of it is about the Blackpool lines. The diagram of the new layout at Kirkham is obviously wrong as it includes no route from Blackpool South to the up line towards Preston.

upload_2018-1-31_10-43-43.png

Traksy shows the missing crossing not shown in Rail
 

ALX400

Member
Joined
7 Dec 2009
Messages
324
Location
Bolton
Just seen on twitter that they are installing foundations at Red Moss in Horwich this weekend, it looked as though all the masts were up along that stretch:rolleyes:
 

SansHache

Member
Joined
31 Mar 2015
Messages
141
Location
Manchester
Hi SansHache!

Just had a quick look at Opentimetrains and cannot see the existing daily Voyager service (calling Poulton and Kirkham) continuing post May-18? Ditto the VT West Coast boking site. Could you advise as to where you got the above information?

Best regards!
Slip

I did a search on Realtime Trains for Virgin West Coast services at Blackpool North from 21st May. The link below should work. If you click on a specific train you can see the full journey details.
http://www.realtimetrains.co.uk/sea...1/0000-2359?stp=WVS&show=all&order=wtt&toc=VT
I don't think they will be shown on the other booking sites until the end of February.
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Wrinkley has sent encouraging photos of Farnworth to Kearsley, accompanied by this text:

There is progress at Farnworth and Kearsley .

There are two new masts between the footbridge and the station at Kearsley, plus more cantilevers added to masts south of the station. Also new ballast through the station.

Farnworth tunnel appears to have all the stalactites in place. Still no progress between Rawson Street and the station.

No noticeable changes around Lostock/Ladybridge/Dean Clough area, but the units for the substation should start arriving tomorrow.

I'll post the photos this evening, am up to my ears in family stuff.
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Just seen on twitter that they are installing foundations at Red Moss in Horwich this weekend, it looked as though all the masts were up along that stretch:rolleyes:

Aha! That sounds like foundations for the footbridge which will replace the Red Moss foot crossing which has been closed for ages.

If so, that is good news.
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Joseph Locke's, Wrinkley's and ALX400's findings enable us to amend the worry list as follows:

1. Missing bases Salford Crescent Platform 2
2. Missing bases Pendleton Old to Cockrobin Bridge
3. Missing bases North of Agecroft Road bridge
4. Structure to be installed between Agecroft Road bridge and Clifton station?
5. Power lines oversailing between M60 and Kearsley?
6. Foot crossings either side of M60, close or bridge? Work bases appear to be in place
7. Stalactites in Farnworth Tunnel? Yes

8. Missing bases Farnworth station to Squeeze Belly Entry footbridge
9. Lever Street footbridge, demolish, replace, leave as is?
10. Missing base Bolton Platform 5
11. Stalactites in Bullfield Tunnel?
12. Missing base(s) between Bullfield Tunnel and Newport Street, Bolton?
13. Big electric kit Lostock Junction
14. Incomplete footbridge Anderton Hall Lane
15. Foot crossing between Horwich and M61, close or bridge? Foundation work may be imminent
16. Missing bases on viaduct south of Chorley? (there may be fixings on the outside of the structure)
17. Stalactites in Chorley Tunnel?
 

LNW-GW Joint

Veteran Member
Joined
22 Feb 2011
Messages
19,652
Location
Mold, Clwyd
The new issue of Rail (845) has an article about recent signalling changes nationwide. The first half of it is about the Blackpool lines. The diagram of the new layout at Kirkham is obviously wrong as it includes no route from Blackpool South to the up line towards Preston.

The article confirms that new axle counters are used west of Salwick in the new Manchester ROC control area, so I must have missed them on Monday.
It's also 4-aspect signalling.
The route east of Salwick is still signalled by Preston PSB and has track circuits, though the 3-aspect signal heads have been changed.
Apparently the wiring will not extend into P1 at Kirkham, and only P3 can send trains towards Preston.
The article says none of the new station platforms will be able to handle 11-car Pendolinos, but there is passive provision for extension to 277m to handle them.
 

ALX400

Member
Joined
7 Dec 2009
Messages
324
Location
Bolton
Aha! That sounds like foundations for the footbridge which will replace the Red Moss foot crossing which has been closed for ages.

If so, that is good news.

I was thinking that but wasn’t sure, Is that the one I photographed with the new fencing being put on the other week
 

Foggycorner

Member
Joined
16 Nov 2016
Messages
179
Location
bolton
The reason for the mix of 3 & 4 aspect signalling Preston Kirkham is down to money
It is far easier to just change existing 3 aspect signals to new LED type and use the existing circuitry in Preston control area
All new signaling Salwick to Blackpool done to new 4 aspect LED signals as it was all done as one job signals controls locs cables and axle counters
 

snowball

Established Member
Joined
4 Mar 2013
Messages
7,718
Location
Leeds
There's going to be a closure at Manchester Victoria in Easter - https://www.northernrailway.co.uk/n...r-journeys-due-to-manchester-victoria-closure

Does this have anything to do with the electrification work?

According to recent discussion on page 9 of the Stalybridge electrification thread it's to lower the tracks leading to platforms 5 and 6 where they pass under Cheetham Hill Road bridge. Apparently they were not included when the platform 3 and 4 tracks were lowered a couple of years ago. There may also be other works as part of the electrification for a few hundred yards eastward out of Victoria, which is all that remains following the cutback of the plan to electrify to Stalybridge.
 

LDECRexile

Established Member
Joined
30 Jan 2014
Messages
2,149
Location
Southport, UK
Further to the discussion about the layout at Kirkham and Wesham, the diagram in Traksy and my own observations and photos show signals in both directions from all three platforms at Kirkham and Wesham.

Where would a train heading towards Preston from Platform 1 or Platform 2 go to? As a layman all I can see would be that they could head a few hundred yards towards Preston then come back again, perhaps swapping platforms in the process.

I would have expected a crossover not far on the Preston side of the station so that (say) a train could travel Blackpool South-K&W Platform 2-crossover-Preston. Put another way, the layout as shown allows Preston to B South trains to use Platform 1 or Platform 2; with a crossover as I describe trains from B South to Preston could use Platform 2 or Platform 3, but as shown they can only use Platform 3.

Without such a crossover, what does the bi-directional signalling enable?
 

bonzawe

Member
Joined
30 May 2014
Messages
89
Am I missing something? How are you getting to the Blackpool lines on traksy - doesn't seem to be in the selection list for maps?
upload_2018-2-1_8-21-57.png

Not sure I understand, I see Blackpool in the search. Go to BPS and scroll will show the current services. It looks to me that the map at BPN has been redrawn ready for the reopening.
 