Proposal to convert the Abbey Line to a busway

Status
Not open for further replies.

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,771
Buried deep within the A414 Corridor Strategy Document, which can be found here

Having made it clear that by "Mass Rapid Transit" they mean "Bus Rapid Transit" (via buslanes and possibly bus guideways), page 126 has this bit
Segment 4 will be significantly influenced by a planned Mass Rapid Transit. Reference should be made to Annex 15 which provides a breakdown of what the MRT could comprise for this segment. It is envisaged that MRT Routes A (Watford-St Albans) and Route B (Watford-Welwyn Garden City) could utilise the A412 and A405 and therefore will require some form of traffic signal-operated priority at key junctions. In the longer term, the existing Abbey Line alignment could form part of a wider MRT network. A MRT could have a substantial influence on travel choices available within Bricket Wood, and the use of the A405 for inter-urban trips between major settlements along the corridor.
(bold emphasis mine)

This isn't exactly a firm commitment to rip up the rails, but is certainly interesting to see in an official County Council transport strategy.

Is it worth it for higher frequencies and through connectivity?
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Meole

Member
Joined
28 Oct 2018
Messages
452
45 min frequency in a heavily urbanised area, low demand, busway may well be a better and more flexible use of the linear route attracting more traffic and reducing car use.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
28,013
Location
UK
This idea seems to pop up more often than a jack-in-a-box.

I think HCC just cuts and pastes this every few years. The idea will die as soon as the council is asked to put any money down!
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
38,818
Location
Yorks
This idea was previously a tram of some description.

Interesting to see that its now been downgraded to a crummy guided busway.

Just pay for a passing loop and have done with it.
 

A0wen

On Moderation
Joined
19 Jan 2008
Messages
7,450
45 min frequency in a heavily urbanised area, low demand, busway may well be a better and more flexible use of the linear route attracting more traffic and reducing car use.

Problem is the Abbey Line doesn't really serve a useful purpose. At each end the stations are away from their respective centres. St Albans to London commuter traffic is far better served from St Albans City and people travelling from further afield ie Hatfield, Welwyn or Hertford don't want or need to go via St Albans to get to Watford and beyond.
 

DPWH

On Moderation
Joined
8 Sep 2016
Messages
244
Problem is the Abbey Line doesn't really serve a useful purpose. At each end the stations are away from their respective centres. St Albans to London commuter traffic is far better served from St Albans City and people travelling from further afield ie Hatfield, Welwyn or Hertford don't want or need to go via St Albans to get to Watford and beyond.

So why not close it?
 

Antman

Established Member
Joined
3 May 2013
Messages
6,842
So why not close it?

Why on earth would you want to close it?

Clearly an extension to the respective town centres at each end would be beneficial and this can only be achieved by conversion to light rail or a busway.
 

jopsuk

Veteran Member
Joined
13 May 2008
Messages
12,771
Anyway, now is the time to break out the crayons to scrawl my plan for a light rail based mass rapid transit from Rickmansworth to Broxbourne incorporating the Metropolitan's Watford Branch, the Abbey Line, the route of the Hatfield & St Albans Railway, the route of the Hertford & Welwyn Junction Railway and the Hertford East branch, with oh so many deeply expensive tunnels and branches to Hemel Hempsted and Harlow.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
14,191
Location
St Albans
So how much will clearing existing infrastructure and laying 6 miles of concrete cost compared to a Penryn style passing loop at Bricket Wood cost?
 

AM9

Veteran Member
Joined
13 May 2014
Messages
14,191
Location
St Albans
Anyway, now is the time to break out the crayons to scrawl my plan for a light rail based mass rapid transit from Rickmansworth to Broxbourne incorporating the Metropolitan's Watford Branch, the Abbey Line, the route of the Hatfield & St Albans Railway, the route of the Hertford & Welwyn Junction Railway and the Hertford East branch, with oh so many deeply expensive tunnels and branches to Hemel Hempsted and Harlow.
Any undermining of the Alban Way's current status would get very stiff resistance. Far more cost effective to improve the routes 300/1, 320, 724, 341/641, 610 etc., with appropriate priority established at junctions. Maybe make some more services (additional to the 724), express.
 

AM9

Veteran Member
Joined
13 May 2014
Messages
14,191
Location
St Albans
Have you ever used the Leigh Guided Busway in Greater Manchester that has modern double-deck buses? The passenger usage on there since inception has lived well up to expectations.
Not surprising that Leigh residents, (from the largest town without a railyway at all) took to an improved bus service, - probably most of them transferring from a degraded street bus service. There wasn't of course a working railway to dismantle there.
 

yorksrob

Veteran Member
Joined
6 Aug 2009
Messages
38,818
Location
Yorks
Have you ever used the Leigh Guided Busway in Greater Manchester that has modern double-deck buses? The passenger usage on there since inception has lived well up to expectations.

I did consider using it due to the never ending disruption on the railway this year, but given that it seemed to take an hour to get from Atherton to Manchester, I ended up getting a taxi to Wigan and getting the train from there instead.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
97,532
Location
"Marston Vale mafia"
I did consider using it due to the never ending disruption on the railway this year, but given that it seemed to take an hour to get from Atherton to Manchester, I ended up getting a taxi to Wigan and getting the train from there instead.

The fundamental issue with that busway is that it only goes half way to Manchester. The Cambridge one (much as it has a lovely rural branchline feel about it, and it offers a far superior service than the hourly Class 153 it'd have been as a railway) has a similar issue.
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
28,013
Location
UK
Anyway, now is the time to break out the crayons to scrawl my plan for a light rail based mass rapid transit from Rickmansworth to Broxbourne incorporating the Metropolitan's Watford Branch, the Abbey Line, the route of the Hatfield & St Albans Railway, the route of the Hertford & Welwyn Junction Railway and the Hertford East branch, with oh so many deeply expensive tunnels and branches to Hemel Hempsted and Harlow.

HS2 cost savings by using buses instead anyone?
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
32,266
Location
A semi-rural part of north-west England
The fundamental issue with that busway is that it only goes half way to Manchester. The Cambridge one (much as it has a lovely rural branchline feel about it, and it offers a far superior service than the hourly Class 153 it'd have been as a railway) has a similar issue.

The Leigh Guided Busway as such was built on the line of the railway from Leigh to Ellenbrook (both station areas on the now-defunct Tyldesley loop line) but from Ellenbrook it uses the major East Lancashire Road (where a large Park and Ride facility was installed at the M60 link) and from there, long road stretches now have special bus lanes to aid the service provision. Now that the Manchester terminus is extended to the very large multi-million pound Manchester Royal Infirmary complex, these buses serve both the large university campus sites of both Salford University and Manchester University as well as city core areas of Manchester.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
97,532
Location
"Marston Vale mafia"
The Leigh Guided Busway as such was built on the line of the railway from Leigh to Ellenbrook (both station areas on the now-defunct Tyldesley loop line) but from Ellenbrook it uses the major East Lancashire Road (where a large Park and Ride facility was installed at the M60 link) and from there, long road stretches now have special bus lanes to aid the service provision. Now that the Manchester terminus is extended to the very large multi-million pound Manchester Royal Infirmary complex, these buses serve both the large university campus sites of both Salford University and Manchester University as well as city core areas of Manchester.

They do, but they are still too slow because they still don't have fully dedicated infrastructure all the way in.

They are certainly better than a conventional bus (or indeed "nothing") but not better than a railway.
 

Xenophon PCDGS

Veteran Member
Joined
17 Apr 2011
Messages
32,266
Location
A semi-rural part of north-west England
They do, but they are still too slow because they still don't have fully dedicated infrastructure all the way in.

They are certainly better than a conventional bus (or indeed "nothing") but not better than a railway.

Years and years had elapsed since the closure of that railway line which I had used in my early youthful days and nothing whatsoever had been done to reinstate it. Being in the "Land of the TfGM Empire" (as I choose to call it, living as I do outside the area clutches of that body) one might well have seen another arm of the Manchester Metrolink system, but the powers-that-be made the decision to install the Guided Busway at that time.
 

Mutant Lemming

Established Member
Joined
8 Aug 2011
Messages
3,194
Location
London
The advantage of any bus over the branch would be in taking you to and from the respective town centres. All that would happen with the busway is that the bus would be taken away from areas (like Chiswell Green) not served by the train only for the bus to still end up being stuck in congested traffic in Watford and St.Peter's Street, St.Albans

So how much will clearing existing infrastructure and laying 6 miles of concrete cost compared to a Penryn style passing loop at Bricket Wood cost?

The original passing loop at Bricket Wood featured at the closing scenes of Night of the Demon


 

trebor79

Established Member
Joined
8 Mar 2018
Messages
4,435
I don't understand what the attraction of a guided busway is. Taking the Cambridgeshire one as an example, there were massive cost and time over runs due to problems with the construction.
Why not just build it as a conventional road, access controlled so only buses can use it (the busway has "car catchers" installed in any case).
What real benefit does a guideway provide over a dedicated road, which must surely be cheaper and quicker to construct?
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
97,532
Location
"Marston Vale mafia"
I don't understand what the attraction of a guided busway is. Taking the Cambridgeshire one as an example, there were massive cost and time over runs due to problems with the construction.
Why not just build it as a conventional road, access controlled so only buses can use it (the busway has "car catchers" installed in any case).
What real benefit does a guideway provide over a dedicated road, which must surely be cheaper and quicker to construct?

It can be narrower than a conventional road. Other than that, not really any advantage. You can control car access by putting cameras at the access points so everyone who drives a private vehicle onto it gets fined - far less disruption than them going into "car traps" and needing recovery, and at say £100 a time it's a nice source of income if people still do it even having been warned.
 

XDM

Member
Joined
9 Apr 2016
Messages
483
Another option for the St Albans Abbey line would be to use it as a test bed for really modern railway operation.
Convert it to Docklands light railway type operation ( high quality fencing required.)
Turnround at at each end could be reduced as per DLR to less than a minute & you could operate a 30 min service.
The technology is there & well proven over 35 years in east London so there is no risk.
Probably cheaper than even a simple loop at Bricketts Wood & far less costly than a busway with those ridiculous concrete foundations.

Either use the DLR units which will soon be replaced or, bette, convert three existing EMUs to DLR control & get a decent ride at good speeds.

Plenty of space to keep the running unit & the spares at Watford.
 

TheGrew

Member
Joined
31 Jul 2012
Messages
334
How about building a bridge over the WCML from Watford High Street over to Watford North (I think their is sufficient space to build a flyover) and extending some of the Watford DC services up to St Albans Abbey to get the frequency right the passing loop should be reinstated.
 

Railwaysceptic

Established Member
Joined
6 Nov 2017
Messages
1,408
How about building a bridge over the WCML from Watford High Street over to Watford North (I think their is sufficient space to build a flyover) and extending some of the Watford DC services up to St Albans Abbey to get the frequency right the passing loop should be reinstated.
Very, very expensive . . . and how many people would use it?
 

PeterC

Established Member
Joined
29 Sep 2014
Messages
4,066
The busway idea is tempting as it will take travellers into the town centres at both ends. The down side is that it is the last mile at each end is where there is serious congestion.
 

gallafent

Member
Joined
23 Dec 2010
Messages
517
They are certainly better than a conventional bus (or indeed "nothing") but not better than a railway.

… better in some ways, in my (very limited) experience (of the Luton–Dunstable one), namely that they don't get stuck in traffic, on the guided bit. Clearly the fact that the bus's direction is controlled mechanically rather than by a human in “free space” (and that the busway doesn't have any other traffic, including pedestrians or cyclists, on it) is a safety improvement too, but I can't think of many other advantages.

Mine did then get stuck in traffic as soon as it went back on to “normal” roads, to the extent that I missed the train I was planning to change on to. Furthermore, the ride quality on the guided busway bit was absolutely abysmal, far worse than in the same bus on the normal road sections. If I find myself living back in that part of the world in future I won't be using it again, instead driving or cycling. It's a real shame that the Thameslink extension (along the then still-extant railway) to Dunstable never happened.
 

furnessvale

Established Member
Joined
14 Jul 2015
Messages
4,558
I for one welcome our sentient 400km/h autonomous bus overlords.
Shades of the proposal to convert Marylebone into a coach station years ago.

Unguided coaches passing through the tunnels at a closing speed of 140mph with 18 inches between them!
 

cle

Established Member
Joined
17 Nov 2010
Messages
4,005
A lot of the major employment centres in Watford are closer to the Junction. Not everything revolves around the Harlequin...

Not to mention the connections both north and south - which with HS2 will bounce back to the WCML railhead it used to be. Shame about the Met - but even still, it's a future hub. Usage has increased massively.
 