Anyone seen what caused the overhead line damage between Retford and Newark this morning? We were advised at Retford to either go to Donny and get a service routed via Lincoln or drive to Newark, I bailed, fortunately it was easy to cancel my meeting.

I think in 15-20 years of using the ECML that's only the 2nd time I've had to bail.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

Highlandspring

Established Member
Joined
14 Oct 2017
Messages
2,777
A broken insulator which left the contact wire (the bit the train’s pantograph touches) sagging too low for trains to pass under safely.
 

tiptoptaff

Established Member
Joined
15 Feb 2013
Messages
3,021
Wires down on the ECML, what a rarity :rolleyes::rolleyes:

I assume it's far too expensive to rewire it with something other than cheesestrings?
 

Monkeyhead

Member
Joined
21 Sep 2016
Messages
68
Took me 40 mins to get from Northallerton to York, where my train was cancelled. Got on another that got to Donny to have a thunderbird attached and a diversion with no given time into London, but minimum of extra 60 mins. Decided to bail out, 15 mins later said train set off without thunderbird, presumably no longer diverted....... Back to York via Cross Country, and to Northallerton via TPE. Spent the afternoon in the Potting Shed in trying to skype into the meeting I was meant to be in. Something of a wasted day.....
 
Last edited:

londonmidland

Established Member
Joined
22 Dec 2009
Messages
1,828
Location
Leicester
1E18 1400 Edinburgh to London Kings Cross has failed in the affected area (neutral section?) causing further disruption.

Not a good day on the ECML and also the WCML following a fatality at Milton Keynes Central.
 

tsr

Established Member
Joined
15 Nov 2011
Messages
7,400
Location
Between the parallel lines
1E18 now arriving almost 4 hours late into Newark. Suspect passengers will be put on one of the trains stuck in the queue behind.
 

Glenn1969

Established Member
Joined
22 Jan 2019
Messages
1,983
Location
Halifax, Yorks
It has been diverted to Platform 3 at Newark. 1Y44 and 1Y90 are right behind it and still going to London even though they are heavily delayed. If pax miss those 2 the next is 2205 according to RTT
 

tsr

Established Member
Joined
15 Nov 2011
Messages
7,400
Location
Between the parallel lines
It has been diverted to Platform 3 at Newark. 1Y44 and 1Y90 are right behind it and still going to London even though they are heavily delayed. If pax miss those 2 the next is 2205 according to RTT

1Y44 may well terminate at Peterborough judging by TOC deliberations.
 

Glenn1969

Established Member
Joined
22 Jan 2019
Messages
1,983
Location
Halifax, Yorks
1Y44 is terminating at Peterborouigh. 1Y90 is still going to London and 1E22 was terminated at Doncaster. 1E24 has a 90 minute delay
 

lincolnshire

Member
Joined
12 Jun 2011
Messages
884
I was on the second train ( 05-37 from Doncaster ) and we was stopped twice and in total was 2hours 10 mins late into Kings Cross, it was very quiet sat there on the train with the driver busy taking pictures of the pantograph from the bankside. Nothing also passed us going the other way either for along while and the phone and computer gang was getting worried as the sockets had gone off too.
After we had been issued with our 330ml bottle of water we was advised that the doors on the coach ends may need some assistance as we was running short of air in the system. When we did get under way not far away was about 6 guys with long poles looking towards the train on the edge of a field down a farm track what was they doing?
I also returned last night from Kings Cross, 21-00 was cancelled , 21-30 to Leeds had not arrived and 22-00 to Newcastle had also not arrived at 22-00 not an LNER train to be seen in any platform.My train eventually left at 23-30 and arriving back into Doncaster at 01-30 after trying to find a crew for it. Before we left there was a few LNER & a Grand Central arrival,s so how long they had been delayed was anyones guess. Not very handy arriveing into Kings Cross at 23-30 and then going elsewhere at that time of night.
All in all it can only be described as a CRAP day for East Coast Mainline services.How much did this cost Network Rail in train delay payments I wonder? does anyone know ?
 

Glenn1969

Established Member
Joined
22 Jan 2019
Messages
1,983
Location
Halifax, Yorks
Given that the 2330 KGX- Leeds is showing as having departed Peterborough 36 late but then lost 40 minutes between Newark and Retford they clearly still hadn't solved the problem. That area does have a fair few equipment issues. When is that stretch of the ECML due to be upgraded?
 

londonmidland

Established Member
Joined
22 Dec 2009
Messages
1,828
Location
Leicester
I know in some areas they have been converting the troublesome headspans by removing the cross span and headspan wire and placing a boom between the two masts. The registration arms have also been replaced so the wires are independently supported.
 

td97

Established Member
Joined
26 Jul 2017
Messages
1,298
When is that stretch of the ECML due to be upgraded?
By 2020.
https://www.volkerrail.co.uk/en/projects/detail/east-coast-main-line-power-supply-upgrade
The alliance, comprising of Network Rail, VolkerRail, Siemens, J Murphy and Sons, Jacobs and TSP, will construct new substations, install over 600km of new cabling and renew overhead line equipment (OLE) and structures over 246km of the ECML, from Wood Green in London to Bawtry near Doncaster.
 

ricoblade

Member
Joined
28 Sep 2015
Messages
370
I was on the second train ( 05-37 from Doncaster ) and we was stopped twice and in total was 2hours 10 mins late into Kings Cross, it was very quiet sat there on the train with the driver busy taking pictures of the pantograph from the bankside. Nothing also passed us going the other way either for along while and the phone and computer gang was getting worried as the sockets had gone off too.
After we had been issued with our 330ml bottle of water we was advised that the doors on the coach ends may need some assistance as we was running short of air in the system. When we did get under way not far away was about 6 guys with long poles looking towards the train on the edge of a field down a farm track what was they doing?
I also returned last night from Kings Cross, 21-00 was cancelled , 21-30 to Leeds had not arrived and 22-00 to Newcastle had also not arrived at 22-00 not an LNER train to be seen in any platform.My train eventually left at 23-30 and arriving back into Doncaster at 01-30 after trying to find a crew for it. Before we left there was a few LNER & a Grand Central arrival,s so how long they had been delayed was anyones guess. Not very handy arriveing into Kings Cross at 23-30 and then going elsewhere at that time of night.
All in all it can only be described as a CRAP day for East Coast Mainline services.How much did this cost Network Rail in train delay payments I wonder? does anyone know ?

Sounds like good job I bailed, I was only thinking that I wouldn't get to London until late morning at the earliest, I hadn't even thought of hassle getting back!
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
24,880
Location
Nottingham
I know in some areas they have been converting the troublesome headspans by removing the cross span and headspan wire and placing a boom between the two masts. The registration arms have also been replaced so the wires are independently supported.
Newark to Retford is mostly double track with the normal single track cantilevers each side. Headspans are normally only on sections with three or more tracks.
 

Crossover

Established Member
Joined
4 Jun 2009
Messages
9,253
Location
Yorkshire
Given that the 2330 KGX- Leeds is showing as having departed Peterborough 36 late but then lost 40 minutes between Newark and Retford they clearly still hadn't solved the problem. That area does have a fair few equipment issues. When is that stretch of the ECML due to be upgraded?

That service is a booked HST (to allow it to do the diversions around Knottingley). I highly suspect the 2330 KGX - LDS ran to Newark and then diverted to Doncaster via Lincoln(?) to avoid the affected area. I would further presuppose that it ran via Wakefield Westgate on departure from Doncaster
 

lincolnshire

Member
Joined
12 Jun 2011
Messages
884
Putting up or taking earth straps on/ off the OLE probably
Having been out with the OHL staff putting on earth straps , they didn.t look to be them poles and they was also all in cars and no one in Orange overalls so they wouldn,t be going on the track.
Was they LNER staff making sure that the cause was not there pantograph? by taking pictures to prove it was not them as there would be some very large payments to be paid out that day for train delays to the companies affected and then to the passengers also affected.
 

D365

Veteran Member
Joined
29 Jun 2012
Messages
11,448
I didn't even have to look at the thread to know this would be a Retford problem...
 