I asked the fleet service manager (who was the guard) , he said deadline for the Desiro referb is now January!
 

WVL14

Member
Joined
23 Jan 2011
Messages
194
Location
London
You said 450013 was done then but it's being done again?

Got a bit ahead here with the prediction of 450013 going to Eastleigh. The unit went to Eastleigh 13-5 but returned to service with no work done due to delays with 450010 on site there.
 
Last edited:

Goldfish62

Established Member
Joined
14 Feb 2010
Messages
9,932
I asked the fleet service manager (who was the guard) , he said deadline for the Desiro referb is now January!
Sounds about right given the slow pace! I wonder if that means that the repaints won't now commence until next year either.
 

WVL14

Member
Joined
23 Jan 2011
Messages
194
Location
London
444041 worked 5B99 00+13 Basingstoke to Eastleigh Works 20-6-19.
.
444009 was released from Eastleigh 20-6-19 and worked 5B96 to Basingstoke.
.
 

molecrochip

Member
Joined
14 Jul 2017
Messages
57
To the casual observer, eg me, it finally feels as though it's a now rare thing to stumble across red seat covers in a 450.
On the Portsmouth line, I feel like we still see a significant number more Red seats than Blue - same on the 444s. Wondering if unrefurbished units are being focused on Fratton?
 

SWRtrain_fan

Member
Joined
18 Dec 2018
Messages
378
Location
Berkshire
Sounds about right given the slow pace! I wonder if that means that the repaints won't now commence until next year either.
I would presume the Desiro repaints will occur only when the internal work is complete, so unfortunately they will probably start next year, which is a shame because the Desiro paintwork is really dirty now; particularly the 444s.
 
Last edited:

VT 390

Established Member
Joined
7 Dec 2018
Messages
1,366
Is there a reason why the interiors are being done first as I would have thought it would be quicker and easier to do exterior work so it would be done first, this does seam to be the case with most other operators such as the WMR 172's.
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
31,265
Is there a reason why the interiors are being done first as I would have thought it would be quicker and easier to do exterior work so it would be done first, this does seam to be the case with most other operators such as the WMR 172's.
They probably need as many of the trains as possible to run the timetable in the absence of the expected number of 442s
 

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,476
Location
Between Peterborough & Bedlington
Is there a reason why the interiors are being done first as I would have thought it would be quicker and easier to do exterior work so it would be done first, this does seam to be the case with most other operators such as the WMR 172's.
Contractual arrangements. The WMR 172s are maintained by WMR in-house at Tyseley, while the SWR Desiros are maintained by Siemens at Northam. Northam doesn't have revinyling facilities, while Tyseley does.
 

VT 390

Established Member
Joined
7 Dec 2018
Messages
1,366
Contractual arrangements. The WMR 172s are maintained by WMR in-house at Tyseley, while the SWR Desiros are maintained by Siemens at Northam. Northam doesn't have revinyling facilities, while Tyseley does.
Where will the SWR units be done then?
 

swt_passenger

Veteran Member
Joined
7 Apr 2010
Messages
31,265
Contractual arrangements. The WMR 172s are maintained by WMR in-house at Tyseley, while the SWR Desiros are maintained by Siemens at Northam. Northam doesn't have revinyling facilities, while Tyseley does.
Northam isn’t big enough to do the interior modifications either, which is why that work is done at Eastleigh. I think the Desiros will ultimately have at least a properly repainted base colour, and I expect that will probably happen at Bournemouth depot, where there’s a modern paint facility.
 
Last edited:

59CosG95

Established Member
Joined
18 Aug 2013
Messages
6,476
Location
Between Peterborough & Bedlington
Northam isn’t big enough to do the interior modifications either, which is why that work is done at Eastleigh. I think the Desiros will ultimately have at least a properly repainted base colour, and I expect that will probably happen at Bournemouth depot, where there’s a modern paint facility.
Weren't the 442s repainted into base grey at Bournemouth?
 

Goldfish62

Established Member
Joined
14 Feb 2010
Messages
9,932
Contractual arrangements. The WMR 172s are maintained by WMR in-house at Tyseley, while the SWR Desiros are maintained by Siemens at Northam. Northam doesn't have revinyling facilities, while Tyseley does.
SWR have stated that they will be painted, not vinyled, ie same as the 158/9s.
 
Joined
29 Sep 2018
Messages
435
So the majority of the 159/0s are now in SWR colours. I reckon they’ll start repainting the 159/1s from next year including the desiros.
 

Nammer

Member
Joined
1 May 2016
Messages
119
Does anyone know if the large litter bins will be fitted by the doors on the ex-HC refurbished units? The small bins between the seats are not clearly visible on 450543 so the train appears messier as passengers leave their rubbish on the floors and seats.
 

WVL14

Member
Joined
23 Jan 2011
Messages
194
Location
London
Desiro refurbishments:
.
444041 (unit 24) has been released from Eastleigh and is now back in traffic.
444027 (unit 25) arr 28-6-19, undergoing work
.
450031 (unit 52) arr 22-6-19, undergoing work, now due out 1-7-19
450123 (unit 53) arr 22-6-19, out 27-6-19
450114 (unit 54) arr 27-6-19, undergoing work
.
Hope that helps :)
.
 

Dan15812

Member
Joined
18 Oct 2018
Messages
422
Location
SW
SWR Desiro Refurbishment

NB: SWR Desiro refurbishment is currently being done at a slower rate due to class 442 delay

Partly refurbished 450s:

003, 007, 011, 014, 026, 027, 028, 030, 031, 035, 036, 040, 074, 076, 086, 087, 093, 099, 109, 110, 124, (21 units)

Fully refurbished 444s:

003, 005, 006, 007, 008, 009, 010, 013, 015, 019, 020, 022, 025, 027*, 029, 033, 034, 035, 038, 039, 040, 041, 042, 044, 045(24 units completed)(53% complete)

Fully refurbished 450s:

001, 002, 005, 006, 008, 010, 012, 013, 015, 016, 018, 019, 020, 024, 025, 031, 032, 033, 037, 038, 041, 543, 073, 075, 078, 079, 080, 081, 082, 083, 084, 085, 091, 092*, 094, 095, 097, 100, 102, 103, 105, 106, 111, 112, 113, 114*, 115, 117, 119, 121, 122, 123, 125 and 126(52 units completed)(41% complete)

*currently being done

Let me know if any more trains have been refurbished and I will edit this post regularly
 
Last edited:

WVL14

Member
Joined
23 Jan 2011
Messages
194
Location
London
Changes to Desiro's at Eastleigh:
.
450123 (unit 52) in 22-6-19, out 1-7-19.
.
450092 (unit 55) in 1-7-19, on hand.
.
 

Dan15812

Member
Joined
18 Oct 2018
Messages
422
Location
SW
So is 450031 still undergoing referbishment as I thought it was due out today?
 