simple simon
Member
ThanksI would wait. There will then be more than one 68 running plus 331s on Airedale and Wharfedale services, so more bang for your buck.
ThanksI would wait. There will then be more than one 68 running plus 331s on Airedale and Wharfedale services, so more bang for your buck.
Could they have got the none loco end to look almost the same as the class 68. Would have made sense.
Many, many moons ago I think it was stated that initially Mk5a would be top and tail, but I think that story was prior to the stock being built!
Thanks for reminding me: the original plan was that the DTs would be delivered last, with T&T 68s prior to their arrival. A 2+4 formation would be grossly under capacity (or over-powered, or both) but would have given extra opportunity for driver training on the 68s. But then after the whole Pretendolino debacle it's no surprise.Many, many moons ago I think it was stated that initially Mk5a would be top and tail, but I think that story was prior to the stock being built!
The cab interiors are identical from what I understand although I have yet to see this for myself
Why is the loco wearing a snorkel?1E25 06:56 Liverpool Lime Street to Scarborough started at Manchester this morning due to a track defect. 68027 on the ‘Scarborough’ end, seen here leaving York.
View attachment 67908
It's No.26 & Set 11 today.Any sets out this morning folks?
Cheers
Thanks.It's No.26 & Set 11 today.
Usual Monday - Friday diagram
At the minute the plan is for a day off tomorrow and then to start again SundayWhat's the plan for tomorrow does anyone know?
York floods in heavy rainWhy is the loco wearing a snorkel?
Fantastic image, what a wonderful perspective.
Thanks. Very convenient that it comes through eastbound before work and westbound at lunchtime!Fantastic image, what a wonderful perspective.
Does this come in English (for us non-techie guys)?Just looking at the front there, it looks like a Harting HMC connector on there.
*sighs* Wrong selection for an inter-car connection and that's gonna hurt soon. Should have been a Han HPR for this kind of installation, or something from LPA.
I think Nym is trying to say the socket on the front looks very vulnerable to damage and orange LPA equipment would be more robust like what is fitted to most other T&RS.Does this come in English (for us non-techie guys)?
I think Nym is trying to say the socket on the front looks very vulnerable to damage and orange LPA equipment would be more robust like what is fitted to most other T&RS.
Agreed, only much more funI've had both 68026 and 027 in the past two days and was mightily impressed by them acceleration was like being on a emu