TPE Mark 5A coaching stock progress

Status
Not open for further replies.

TT-ONR-NRN

Established Member
Joined
30 Dec 2016
Messages
10,438
Location
Farnham
Announcements/time/progress/reservations all working correctly on TP11 when I traveled last Sunday, assume same updates will be installed on TP09 in due course.
Speaking of which, I am APPALLED to see that TransPennine Express have retained the same shocking excuse for an announcement voice on the Mark 5s as used on the 185s, and by that I mean the tortuously sarcastic Northern man. Even the depressing woman who used to do it is better than him.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

tpjm

Member
Joined
25 Jan 2019
Messages
484
Location
The North
Possibly, but what I have seen is the trolley unloading on a ramp through the (only) passenger door, not the staff door. It seems unlikely that plans ever anticipated use of separate ramps at separate doors for both wheelchairs and the trolley, so with the other door used only by the guard, the disabled toilet end of the first class coach will suffer congestion.
Long-term, catering will be loaded using a station ramp (where installed) through the staff only door. The current method of work is a result of only having the one daily diagram. The catering operation on Nova is dramatically different to Cl 185 so when more of the fleet is introduced, it will be a little easier to deliver the proposition.
 

sjpowermac

Established Member
Joined
26 May 2018
Messages
1,989
6C5C535A-7202-47AE-8F53-1A2263CF6C9E.jpeg
68027 at York on 1E23 today (loco on the Liverpool end). On time away from York.

Scheduled diagram
5E23/1E23/1F60/1E37/1F74/1E51/1P98/5F86
 

68011

Member
Joined
8 Oct 2016
Messages
206
68025/TP04 didn’t work back on 1P98 last night due to a brake fault, unit off the 1E53 was stepped up to work 1P98 departing at 00:08hrs 92L
 

geoffk

Established Member
Joined
4 Aug 2010
Messages
3,234
View attachment 68639
68027 at York on 1E23 today (loco on the Liverpool end). On time away from York.

Scheduled diagram
5E23/1E23/1F60/1E37/1F74/1E51/1P98/5F86
1F60 was delayed at York and left 4 late, 6 late at Huddersfield and the stopper to Piccadilly preceded it at 11.28, so the Liverpool was 16 late away. The delay at York seems to have been caused by other late trains. 1E37 cancelled, problem with the brakes.
 
Last edited:

sjpowermac

Established Member
Joined
26 May 2018
Messages
1,989
1E37 12:56 Liverpool LS-Scarborough cancelled throughout. 68027 plus TP09 forward as 5H37 15:40 Liverpool LS-Longsight.

Rest of the diagram 1F74/1E51/1P98/5F86 currently shown as running, maybe 6025 to plus TP04 back from Scarborough?

EDIT: Looks like the 185 off the 13:56 Liverpool-Scarborough is being stepped up to work 1F74.
 
Last edited:

sjpowermac

Established Member
Joined
26 May 2018
Messages
1,989
TPE Nova 3 sets
The big news this week has been the introduction into passenger service of 68025 ‘Superb’ working with TP04, bringing the active passenger fleet up to three sets.

TP11 has had some software updates so that glitches with automated announcements and information display time have been fixed. Electronic reservations are now in operation on all sets.

There have been a few cancellations due to a shortage of train crew.

Happy to be corrected on any of the info, details of workings below:)

Fingers crossed for the second diagram to start from Monday 23.09.2019.

Saturday 14.09.2019
68026 plus TP11 (Liverpool end)
5E23/1E23/1F60/1E37/1F74/1E51/5E51/5J98/5H96

Notes
1E51 cancelled Man Vic-Scarborough (shortage of train crew)
Train forward ecs as
5E51 20:32 Manchester Victoria-Scarborough
5E51 cancelled York-Scarborough (arrived York 40 late)
1J98 cancelled throughout
(shortage of train crew)
Train forward from York as
5J98 23:39 York-Manchester Piccadilly
5H96 Man Picc-Longsight

Sunday 15.09.2019
68026 plus TP11 (Scarborough end)
5E29/1E29/1F66/1E43/1F80/5H93

Monday 16.09.2019
68026 plus TP11 (Scarborough end)
5E23/1E23/1F60/1E37/1F74/1E51/5T51

Notes
1E51 cancelled between Manchester Victoria and Scarborough (shortage of train crew)

Originally the train was shown as working forward as 5E51 but that was cancelled.

5T51 20:43 Manchester Victoria-Longsight

Tuesday 17.09.2019
68027 plus TP09 (Liverpool end)
5E23/1E23/1F60/1E37/1F74/1E51/1P98/5F86

Wednesday 18.09.2019
68027 plus TP09 (Liverpool end)
5E23/1E23/1F60/1E37/1F74/1E51/1P98/5F86

Thursday 19.09.2019
68025 plus TP04 (Scarborough end)
5E23/1E23/1F60/1E37/1F74/1E51

Notes
1E51 lost 20 minutes between York and Scarborough. The return 1P98 was worked by a Class 185 with the Nova 3 staying at Scarborough.

Friday 20.09.2019
68027 plus TP09 (Liverpool end)
5E23/1E23/1F60

Notes
1E37 cancelled throughout. Train forward as 5H37 15:40 Liverpool LS-Longsight.

68025 plus TP04 (Scarborough end)
5F76 17:44 Scarborough to Manchester Victoria
5W76 20:15 Manchester Victoria-Longsight

Selected days Mon-Sat
5E23 04:06 Longsight-LIV
1E23 05:56 Liverpool LS-Scarborough
1F60 09:41 Scarborough-Liverpool LS
1E37 12:56 Liverpool LS-Scarborough
1F74 16:44 Scarborough-Liverpool LS
1E51 19:56 Liverpool LS-Scarborough
1P98 22:46 Scarborough-Manchester Picc
5F86 01:32 Manchester Picc-Longsight

Selected Sundays
5E29 07:09 Longsight-Liverpool LS
1E29 08:56 Liverpool LS-Scarborough
1F66 12:41 Scarborough-Liverpool LS
1E43 15:52 Liverpool LS-Scarborough
1F80 19:44 Scarborough-Liverpool LS
5H93 22:52 Liverpool LS-Longsight
 
Last edited:

sjpowermac

Established Member
Joined
26 May 2018
Messages
1,989
Fault Free Running
In previous weeks 68030 plus TP12 had been active but there hasn’t been any activity the past week. I wonder if TP12 has been accepted by TPE?

Yorkshire locos
A very quiet week indeed. I wonder if Scarborough drivers are now being trained on Nova 3 sets?

Monday 16.09.2019
68032 0B60/61/62/63

Tuesday 17.09.2019
68028 York Siemens Depot-York platform 2 (stabled with 68032)


Wednesday 18.09.2019 to Friday 20.09.2019
Nothing running
 

Skie

Member
Joined
22 Dec 2008
Messages
1,085
The HVAC seems to lack filtration, so whilst it's nice being blasted in your armpits by a breeze it's not so good when you pass by a freshly manured field, a fire or someone onboard decides to dose themselves in perfume.
 

gimmea50anyday

Established Member
Joined
8 Jan 2013
Messages
3,456
Location
Back Cab
Internal email update says both Nova 3s running today cancelled due to interface issues on the units. 1F60 being the last service to run with a 68 today.
What this means I don't know, wether this will see any running tomorrow I also don't know. What both Nova 3s means again unknown as I wasn't aware of more than one diagram today but the fact it was said raises an eyebrow. There was a begging email from resources yesterday stating rest day work was available for a Mk5 signed crew which may tie in with today's cancellations....
 

gimmea50anyday

Established Member
Joined
8 Jan 2013
Messages
3,456
Location
Back Cab
Speaking of which, I am APPALLED to see that TransPennine Express have retained the same shocking excuse for an announcement voice and by that I mean the tortuously sarcastic Northern man.

Don't listen to BBC Humberside then! The "Voice" is sports presenter Neil Rudd, who also works for TPE out of Hull.

Could have been worse, might have been my voice....

XD
 

68011

Member
Joined
8 Oct 2016
Messages
206
Sat 21/09

68026 / TP11 1E23 05:56 LIV-SCA then the usual 1F60, 1E37, 1F74, 1E51 & 1P98
 

4630

Member
Joined
9 Jan 2007
Messages
39
1F60, 0941 SCA to LIV was cancelled at Manchester Victoria 'due to a problem with the traction equipment' and was then 5H60, 12.25 to Longsight.
 
Joined
1 Feb 2019
Messages
422
21/09: Nova 3 Update 1146

Due to a fault on the unit, it will be taken out of service at 1155 when it reaches Manchester Victoria (Running as 1F60).
1E37 and 1F74 have been cancelled, we are hoping to find a 185 unit so we can run 1E51.


21/09 Nova 3 0822

1E23 0556 LIV-SCA
1F60 0841 SCA-LIV
1E37 1256 LIV-SCA
1F74 1644 SCA-LIV
1E51 1956 LIV-SCA
1P98 2246 SCA-MAN
 

EE Andy b1

Established Member
Joined
12 Dec 2013
Messages
1,212
Location
CLC
Quite a bad week for the Mk5a sets then, just ahead of the supposedly 2 trains in passenger service.
Maybe next week will be better.
 

Solent&Wessex

Established Member
Joined
9 Jul 2009
Messages
2,683
68025 + TP04 failed at Scarborough late on Thursday, reportedly due to a parking brake fault on the DT. Was abandoned overnight with the final service using a 185 and over 80 mins late leaving Scarborough.

68027 + TP09 failed in service on Friday. Suggestion was the same fault, but not sure.

68026 + TP11 failed in service today.

Yep, I can see everything is ready for 2 diagrams a day from Monday.
 

yrreb

Member
Joined
6 Aug 2016
Messages
80
Location
Manchester
68025 + TP04 failed at Scarborough late on Thursday, reportedly due to a parking brake fault on the DT. Was abandoned overnight with the final service using a 185 and over 80 mins late leaving Scarborough.

68027 + TP09 failed in service on Friday. Suggestion was the same fault, but not sure.

68026 + TP11 failed in service today.

Yep, I can see everything is ready for 2 diagrams a day from Monday.
It'll have to happen at some point eventually and when it does it'll be rather fantastic for the North route, I find your tone of voice in this rather pessimistic - It's time for change!
 

sjpowermac

Established Member
Joined
26 May 2018
Messages
1,989
Quite a bad week for the Mk5a sets then, just ahead of the supposedly 2 trains in passenger service.
Maybe next week will be better.

68025 + TP04 failed at Scarborough late on Thursday, reportedly due to a parking brake fault on the DT. Was abandoned overnight with the final service using a 185 and over 80 mins late leaving Scarborough.

68027 + TP09 failed in service on Friday. Suggestion was the same fault, but not sure.

68026 + TP11 failed in service today.

Yep, I can see everything is ready for 2 diagrams a day from Monday.

Days a Nova 3 has completed a full diagram:
August 25/30
September 3/4/5/7/8/9/10/13/14/15/16/17/18

Days a Nova 3 didn’t complete a full diagram due to the train:
August 24/26/27*/28*/29*
September 6/19/20/21

*Nova 3 started diagram part way through the day.

Days when the diagram was part cancelled due to ‘shortage of train crew’ I’ve counted as ‘completed’.

I think overall it looks like a good introduction into service, especially given the small number of sets available and the high daily mileages (the current diagram being over 800 miles).

The first week was bound to be a bit fraught as all staff got used to the new trains.

Interestingly though things settled down very quickly and we have that long string of ‘good’ days in September.

Three problems in three days seems a bit odd after that excellent run, especially with only three prior occasions where a diagram terminated due to the train.

Happy to be corrected on the above and I’ll update. I don’t have access to any official industry information, I’ve used the TPE ‘Journey Check’ to classify the days, which obviously doesn’t give the full story behind the days the train didn’t complete its diagram...
EDIT: Lists altered to show 29/08 as * since the initial part of the diagram was missed. Thank you to @68011 for the correction.
 
Last edited:

Ben Bow

Member
Joined
20 Sep 2018
Messages
342
Days a Nova 3 has completed a full diagram:
August 25/29/30
September 3/4/5/7/8/9/10/13/14/15/16/17/18

Days a Nova 3 didn’t complete a full diagram due to the train:
August 24/26/27*/28*
September 6/19/20/21

*Nova 3 started diagram part way through the day.

Days when the diagram was part cancelled due to ‘shortage of train crew’ I’ve counted as ‘completed’.

I think overall it looks like a good introduction into service, especially given the small number of sets available and the high daily mileages (the current diagram being over 800 miles).

The first week was bound to be a bit fraught as all staff got used to the new trains.

Interestingly though things settled down very quickly and we have that long string of ‘good’ days in September.

Three problems in three days seems a bit odd after that excellent run, especially with only three prior occasions where a diagram terminated due to the train.

Happy to be corrected on the above and I’ll update. I don’t have access to any official industry information, I’ve used the TPE ‘Journey Check’ to classify the days, which obviously doesn’t give the full story behind the days the train didn’t complete its diagram...

Fascinating stuff, thank you for all your summaries, they are very, very interesting. Although its early days, and discounting 68025 as its only worked once, would it be true to say that 68027 and its set has proved to be more reliable that 68026 and its set?
 

EE Andy b1

Established Member
Joined
12 Dec 2013
Messages
1,212
Location
CLC
The business end of a 68!

You can understand how difficult it is getting two different manufacturers systems working together properly especially when neither of them helped TPE fully in this matter and so they have had to try and sort the problem themselves.



20190917_154603.jpg
 