Gatwick Airport station - fit for purpose? Any future plans?

Status
Not open for further replies.

GoneSouth

Member
Joined
17 Dec 2018
Messages
770
Having visited Gatwick station last week, I was just wondering if there are any plans to improve or expand the place. It seems very cramped and from what I can tell hasn’t undergone much in the way of improvements over the past 30 years since I first used the station. In fact there seemed to be significantly more space prior to the ticket gate line being installed.

I don’t think there are lifts to all platforms from the main concourse and you have to go back out into the airport to access the second bridge entrance to all platforms where there are generally not many staff to help and no facilities at all. Surely there is a grand plan to improve the place with the number of passengers using the station these days?

Apologies if there is already a discussion on this subject.
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

hwl

Established Member
Joined
5 Feb 2012
Messages
7,398
Having visited Gatwick station last week, I was just wondering if there are any plans to improve or expand the place. It seems very cramped and from what I can tell hasn’t undergone much in the way of improvements over the past 30 years since I first used the station. In fact there seemed to be significantly more space prior to the ticket gate line being installed.

I don’t think there are lifts to all platforms from the main concourse and you have to go back out into the airport to access the second bridge entrance to all platforms where there are generally not many staff to help and no facilities at all. Surely there is a grand plan to improve the place with the number of passengers using the station these days?

Apologies if there is already a discussion on this subject.
It actually got a small make over a few years ago.

Yes there are huge redevelopment plans with work due to start early next year:
https://www.constructionenquirer.com/2019/07/08/gatwick-airport-train-station-to-get-150m-upgrade/
 

Surreytraveller

On Moderation
Joined
21 Oct 2009
Messages
2,810
It received a new platform (number 7) about 5 years ago. From next summer it is being rebuilt, with an altered timetable in place for the duration of the works
 

GoneSouth

Member
Joined
17 Dec 2018
Messages
770
Thanks for the info.

Good news, it’s currently a bit of a mess and can be a thoroughly miserable experience when they make last minute platform changes with the lack of lifts!
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
24,925
Location
Nottingham
There's at least once place where the yellow safety line is so close to the buildings that it's not possible to walk between them while carrying any sort of suitcase. Are there any plans to de-clutter the platforms Piccadilly 13/14 style or even widen them?
 

GoneSouth

Member
Joined
17 Dec 2018
Messages
770
Its certainly not a place to choose to change trains at
Sadly don’t have a choice when flying. :'(

The Reading trains always seem to have the worst crowding on the platforms, everybody bunched up on the same 30m of platform waiting for what might only be a 2 coach train. The Gatwick express on the other hand... how well is that used?

Is there enough space for widening existing platforms or adding new? I thought there was a road beside the station making it impossible to extend on one side.
 

djdanny77

Member
Joined
21 Feb 2019
Messages
9
And the fact that not all bridges go to Platform 7 and some escaltors/entrances to the other platforms are 1 way only, a real pain in the backside when trying to naviagate a 2 minute change
 

Hophead

Established Member
Joined
5 Apr 2013
Messages
1,193
Trawling the Network Rail website, I perused the "Gatwick Airport station upgrade" page and found firm plans for the work:

Work dates
  • Enabling and escalator replacement works – September 2019 to April 2020
  • Main station work starts – May 2020
  • Platform 7 closes – May 2020 – December 2020
  • Platform 5 and 6 close – December 2020 to early 2021
  • Platform 3 and 4 close – early 2021 to November 2021
  • Station concourse work – June 2021 to May 2022
  • Project completion – 2022
 

cle

Established Member
Joined
17 Nov 2010
Messages
4,033
There is a spot for an eighth line and p8 face, but the p7 escalator is right on the edge - might it be a bay?
 

sheff1

Established Member
Joined
24 Dec 2009
Messages
5,496
Location
Sheffield
Its certainly not a place to choose to change trains at

Heading from St Pancras to Sussex destinations not served by a through train I always change at Gatwick. The large volume of alighting passengers means the chances of getting a seat are much better than if I changed at East Croydon.
 

bubieyehyeh

Member
Joined
25 Feb 2016
Messages
321
I change regularly at gatwick because first/last place where I can switch to/from the cheaper oyster fares.
 

bubieyehyeh

Member
Joined
25 Feb 2016
Messages
321
I change regularly at gatwick because first/last place where I can switch to/from the cheaper oyster fares.

It is a pain though, especially with tourist standing around blocking the route to the tickets gates.

They've also just started on refurbishing the escalator which makes thinks worse.

Truely awful station design.
 

Geogregor

Member
Joined
16 Sep 2016
Messages
206
Location
London
When can we expect first works at this station? Does any one know how will they phase the coming redevelopment?
 

Railcar

Member
Joined
27 Nov 2017
Messages
228
The Gatwick express on the other hand... how well is that used?
Whenever a Gatwick Express comes through East Croydon I make a point of counting heads as it goes past. Never full. Usually almost empty. Truly the 'Fresh Air Express'. What a waste.

By contrast the fast Southern services to Victoria coming up from the coast become jam-packed at Gatwick.
 