Did the same run on Monday to Thursday all week and most of last week too. Even on Saturday.

Nice to see the training (?), is going along.

Can't be too long before we have one in revenue service now, which I'm sure a lot of people will be pleased about, not just on this forum!
 

Energy

Established Member
Joined
29 Dec 2018
Messages
4,418
Can't be too long before we have one in revenue service now, which I'm sure a lot of people will be pleased about, not just on this forum!
Lots of people in the area which LNWR operate will also be pleased as their 350/4s will be arriving, hopefully some 319s can be taken out of service now although looking at wikipedia the 350/4s are helping the cascade of class 323s to northern, maybe some more 323s will be coming to northern soon.
 

hexagon789

Veteran Member
Joined
2 Sep 2016
Messages
15,713
Location
Glasgow
Lots of people in the area which LNWR operate will also be pleased as their 350/4s will be arriving, hopefully some 319s can be taken out of service now although looking at wikipedia the 350/4s are helping the cascade of class 323s to northern, maybe some more 323s will be coming to northern soon.

A win-win all round then ;)
 

NewSt

Member
Joined
24 May 2019
Messages
379
Location
A Class 172
Lots of people in the area which LNWR operate will also be pleased as their 350/4s will be arriving, hopefully some 319s can be taken out of service now although looking at wikipedia the 350/4s are helping the cascade of class 323s to northern, maybe some more 323s will be coming to northern soon.

Class 350/4s aren’t coming to replace 323s - they’re for capacity increase on existing lines only and to help with the withdrawal of Class 319s.
 

Bletchleyite

Veteran Member
Joined
20 Oct 2014
Messages
97,531
Location
"Marston Vale mafia"
Class 350/4s aren’t coming to replace 323s - they’re for capacity increase on existing lines only and to help with the withdrawal of Class 319s.

I doubt 319s will go, there are too many of them now for /4s to replace them all. They'll be used for strengthening and 319s will stay until the new stock arrives.
 

Class172

Established Member
Associate Staff
Quizmaster
Joined
20 Mar 2011
Messages
3,770
Location
West Country
Class 350/4s aren’t coming to replace 323s - they’re for capacity increase on existing lines only and to help with the withdrawal of Class 319s.
They’re also to be used to release the final 170 workings from Chase Line services. WMR have promised users on the Hereford Line that every service will be one carriage longer upon the December timetable change, but this is contingent on sufficient 350/4s arriving to allow it to happen.
 

92002

Member
Joined
27 Mar 2014
Messages
1,124
Location
Clydebank
They’re also to be used to release the final 170 workings from Chase Line services. WMR have promised users on the Hereford Line that every service will be one carriage longer upon the December timetable change, but this is contingent on sufficient 350/4s arriving to allow it to happen.

Suggestions earlier on here that the 397s are to be rolled out on 5th November. Fully in service from the December chsnge.
 

sprinterguy

Established Member
Joined
4 Mar 2010
Messages
11,048
Location
Macclesfield
Suggestions earlier on here that the 397s are to be rolled out on 5th November. Fully in service from the December chsnge.
Pretty rapid fleet rollout if so, which sounds promising: I've been wondering whether there'll be many class 397s in use at the end of November, or whether to stick to changing onto the Virgin service at Preston on my way up to Edinburgh from Manchester at that time.
 

NewSt

Member
Joined
24 May 2019
Messages
379
Location
A Class 172
I doubt 319s will go, there are too many of them now for /4s to replace them all. They'll be used for strengthening and 319s will stay until the new stock arrives.

I did think that it sounded unlikely to be able to replace all of the 319s and provide a capacity boost elsewhere with 10 4-car units.
 

Jamesrob637

Established Member
Joined
12 Aug 2016
Messages
5,205
So 05 Nov is a Tuesday. Maybe as per the other two Novas this will change to the Saturday before or after? The Nova 3 launch I heard about on here but Nova 1 I had to depend on a tip-off from a pal in the industry (not TPE though)
 

yorkie

Forum Staff
Staff Member
Administrator
Joined
6 Jun 2005
Messages
67,429
Location
Yorkshire
Just a reminder this is a Traction & Rolling stock discussion thread for TPE Class 397 ('Nova 2') construction and updates.

I have split some posts here: https://www.railforums.co.uk/thread...nt-capacity-on-northern-wcml-services.194318/

Also people have previously asked why TPE ordered these trains instead of more 80x trains, but due to the length of this thread, the question and answers tends to get buried so I have split some posts here too: https://www.railforums.co.uk/thread...a-2-instead-of-more-80x-series-trains.194316/

In order to keep this thread reasonably concise and on topic, please create a new thread (if there isn't one already) or use an existing one (if there is) if you wish to discuss anything other than Class 397 construction and updates specifically; other topics (even if related) should go in a separate thread.

Once they enter passenger service, a separate diagrams thread will need to be created.
 
Last edited:
Joined
1 Feb 2019
Messages
422
Here is my photo from last nights mega move of 397011 at Crewe
script>

https://flic.kr/p/2hDw8D6
 

kc_

Member
Joined
1 Nov 2019
Messages
132
Location
North West England
After speaking to TPE customer service, appears that they're aiming for Nova 2 rollout by 14th Dec, as seat reservations are unavailable until that date, and was told this is related to Nova 2. The conductor on the 350 I was on yesterday made an announcement to the same effect, stating it's because they're testing the new systems for electronic seat reservations.
 