Calder Valley disruption 3/12/19

Status
Not open for further replies.

SteveM70

Established Member
Joined
11 Jul 2018
Messages
3,871
Over running engineering works causing delays / cancellations of all the first services.

0605 HBD - MCV left about 25 late and stopped at the signal just beyond the end of the platform, and is now showing as cancelled beyond HBD on the screens and national rail enquiries. Not sure what they’re going to do with that. [edit - this is now reversing into the platform making a noise like a ship in fog]

0631 Chester stood at the signal just outside Hebden. [edit - this is now showing as cancelled beyond Hebden]

No announcements, nobody knows what’s going on
 
Sponsor Post - registered members do not see these adverts; click here to register, or click here to log in
R

RailUK Forums

SteveM70

Established Member
Joined
11 Jul 2018
Messages
3,871
So the 605 has disgorged all its passengers and is now running all stops back to Leeds. The conductor announced this on the platform after about 50 people wanting to go west had got on. No announcements (automated, local, twitter) as to when anything will go towards Manchester
 

Gems

Member
Joined
10 Nov 2018
Messages
656
Double whammy.

Over running engineering works and a police incident.

What amazes me is why Network rail allowed the train to leave Leeds in the first place. They must have known that engineering works were over running.
Far too much of this behaviour goes on. It's like watching a game of football between two pub teams, they mean well, but it is always a game of kick and hope.
 
Last edited:

Spartacus

Established Member
Joined
25 Aug 2009
Messages
2,926
Double whammy.

Over running engineering works and a police incident.

What amazes me is why Network rail allowed the train to leave Leeds in the first place. They must have known that engineering works were over running.
Far too much of this behaviour goes on. It's like watching a game of football between two pub teams, they mean well, but it is always a game of kick and hope.

It was at the moment it left Hebden Bridge that the police incident occurred placing a block on traffic from the east, so without crystal balls nobody could have known. As you’re finding this are developing all the time.

As for from Leeds, if it could run, even late, why would you not, surely better than saying to hell with it all.
 

Andyh82

Established Member
Joined
19 May 2014
Messages
3,535
Over running engineering works causing delays / cancellations of all the first services.
No announcements, nobody knows what’s going on

National Rail says the problembeyond Hebden Bridge is due to a police incident

There are also over running engineering works between Brighouse and Halifax?
 

Spartacus

Established Member
Joined
25 Aug 2009
Messages
2,926
National Rail says the problembeyond Hebden Bridge is due to a police incident

There are also over running engineering works between Brighouse and Halifax?

More a points issue at Greenland Jn.
 

SteveM70

Established Member
Joined
11 Jul 2018
Messages
3,871
730 Hebden to Chester running approx 20 late is the first westbound train to depart
 

Bantamzen

Established Member
Joined
4 Dec 2013
Messages
9,735
Location
Baildon, West Yorkshire
Double whammy.

Over running engineering works and a police incident.

What amazes me is why Network rail allowed the train to leave Leeds in the first place. They must have known that engineering works were over running.
Far too much of this behaviour goes on. It's like watching a game of football between two pub teams, they mean well, but it is always a game of kick and hope.

Well at least one didn't make it far out of Leeds, the 06:21 Leeds-Southport via Dewsbury promptly sat down before making the signals at Leeds West, blocking some of the lines to the bays meaning that Aire / Wharfe / Harrogate services had to be held whilst it limped back to P6 (150 134 for reference).
 
Joined
4 Jan 2011
Messages
448
Location
Nelson
Person hit by a train between Rochdale and Smithy Bridge, that's likely to be the police incident.

Tamper reportedly stopped broken down on or in the vicinity of Greetland Junction is the overrunning engineering works.
 

TB

Member
Joined
8 Aug 2013
Messages
84
Tamper ran through the points.

Leeds to Hebden Bridge via Bradford open, Leeds to Hebden via Brighouse open, Halifax to Huddersfield closed with bus replacements.

GC diverted between Wakefield and Bradford.
 
Joined
4 Jan 2011
Messages
448
Location
Nelson
Tamper ran through the points.

Leeds to Hebden Bridge via Bradford open, Leeds to Hebden via Brighouse open, Halifax to Huddersfield closed with bus replacements.

GC diverted between Wakefield and Bradford.
Thanks.

I had a feeling it was a run-through, but all my sources said was tamper fouling the points.
 

Andyh82

Established Member
Joined
19 May 2014
Messages
3,535
Northern can’t catch a break lately. Two issues that aren’t their fault, yet people are still raging on social media and copying in Andy Burnham.
 

Rail Ranger

Member
Joined
20 Feb 2014
Messages
590
Why didn't trains from Leeds reverse at Todmorden? It's a signalled move from the Manchester-bound platform.
 

TUC

Established Member
Joined
11 Nov 2010
Messages
3,608
Northern can’t catch a break lately. Two issues that aren’t their fault, yet people are still raging on social media and copying in Andy Burnham.
Mainly because they do little to win public support and confidence the rest of the time, so there is no goodwill to draw on for events like this.
 

Geeves

Established Member
Joined
6 Jan 2009
Messages
1,934
Location
Rochdale
It was a hard job getting all the trains back straight this morning I'll say that.

As for goodwill and public support if it was Flying Spaghetti Monster rail it would have been the same. Been done to death.
 