R

RailUK Forums

hwl

Established Member
Joined
5 Feb 2012
Messages
7,354
Do you honestly (HONESTLY) think people invovled in introducing new rolling stock just sit back and say nah mate dont worry about being 6 months late. It'll be reet? We wont bother with the penalties. You just crack on when you are ready?

I despair at this place. I really do.
The problem is that some of the newer to the UK manufacturers have already maxed out on damages payable to operators for delays/problems so don't really give stuff about getting things sorted in a hurry (just in the cheapest (slowest) way for the manufacturer!)
 

jon0844

Veteran Member
Joined
1 Feb 2009
Messages
28,013
Location
UK
I do think that businesses need some sort of protection like consumers get, but that will obviously mean raised costs. If companies have to insure (either via an underwriter or self-insuring) they'll increase their fees. As such I am sure contracts limit the liability, or else nobody would bid and nothing would get done. The end result is companies get away with murder and we suffer (either through loss of service or having to pay indirectly for things to be rectified).

You see it all the time where equipment fails and if it were you or me, there would be a chance to claim that something wasn't fit for purpose even outside of the warranty period. Take platform screens where there are clearly some design defects on older screens, given the consistency of the problems, but the TOC/NR or whoever simply has to buy a new one to replace - rather than get the manufacturer to issue new parts for free.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
7,354
I do think that businesses need some sort of protection like consumers get, but that will obviously mean raised costs. If companies have to insure (either via an underwriter or self-insuring) they'll increase their fees. As such I am sure contracts limit the liability, or else nobody would bid and nothing would get done. The end result is companies get away with murder and we suffer (either through loss of service or having to pay indirectly for things to be rectified).

You see it all the time where equipment fails and if it were you or me, there would be a chance to claim that something wasn't fit for purpose even outside of the warranty period. Take platform screens where there are clearly some design defects on older screens, given the consistency of the problems, but the TOC/NR or whoever simply has to buy a new one to replace - rather than get the manufacturer to issue new parts for free.
There are limited amounts of damages in all these contracts, the problem is that the maxima are being reached very quickly in some cases but them manufacturer behaviour shows 2 patterns:
a) keep doing the best they can and throw plenty of resources at it.
or
b) deprioritise and do minimum
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
29,178
Location
Fenny Stratford
The problem is that some of the newer to the UK manufacturers have already maxed out on damages payable to operators for delays/problems so don't really give stuff about getting things sorted in a hurry (just in the cheapest (slowest) way for the manufacturer!)

Each contract should be independent rather than cumulative damages wise. We also have to acknowledge the impact of client changes to specification and the associated contractual variations involved!

There are limited amounts of damages in all these contracts, the problem is that the maxima are being reached very quickly in some cases but them manufacturer behaviour shows 2 patterns:
a) keep doing the best they can and throw plenty of resources at it.
or
b) deprioritise and do minimum

My view is you are often better off acknowledging but parking the damages until a later date and focusing on recovery. Option b happens when the contractual relationship is confrontational and litigious.
 

hwl

Established Member
Joined
5 Feb 2012
Messages
7,354
Each contract should be independent rather than cumulative damages wise. We also have to acknowledge the impact of client changes to specification and the associated contractual variations involved!
They are independent but just indicative that all contracts for certain manufacturers are problematic.

My view is you are often better off acknowledging but parking the damages until a later date and focusing on recovery. Option b happens when the contractual relationship is confrontational and litigious.
a vs b seem very manufacturer dependant
 

TUC

Established Member
Joined
11 Nov 2010
Messages
3,563
Do you honestly (HONESTLY) think people invovled in introducing new rolling stock just sit back and say nah mate dont worry about being 6 months late. It'll be reet? We wont bother with the penalties. You just crack on when you are ready?

I despair at this place. I really do.
Given the number of occasions when new trains are late or have quality issues one can only assume either the penalties are not enforced or they are not severe enough.
 

DarloRich

Veteran Member
Joined
12 Oct 2010
Messages
29,178
Location
Fenny Stratford
Given the number of occasions when new trains are late or have quality issues one can only assume either the penalties are not enforced or they are not severe enough.

because, of course, penalties will ensure timely delivery.

sigh.

Oh and BTW it seems the answer to my question was yes.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
4,418
Considering the order was only six vehicles and they had to adapt the tram trains to work in the UK, I'm not surprised they have had the occasional issue, 6 units doesn't give enough money to make sure everything works.
 

eastwestdivide

Established Member
Joined
17 Aug 2009
Messages
2,532
Location
S Yorks, usually
Considering the order was only six vehicles and they had to adapt the tram trains to work in the UK, I'm not surprised they have had the occasional issue, 6 units doesn't give enough money to make sure everything works.
For the sake of accuracy, seven vehicles, from which they need only three to run the normal tram-train service. In fact two of the seven (205/207) haven't yet reached Parkgate, and won't until they're re-equipped with tram-train profile wheelsets (they currently have tram system-only wheelsets).
 

Harpers Tate

Established Member
Joined
10 May 2013
Messages
1,679
The wheelsets can be interchanged between tram sets if and when necessary. I'm not claiming it's trivial to do - but it is quite possible. Indeed, when two TT vehicles were damaged in RTAs, they made up one complete unit from the "good" ends of these two - and then put railway wheels on another, so as to maintain the TT fleet of 4 total (3 in use; one spare).
 

edwin_m

Veteran Member
Joined
21 Apr 2013
Messages
24,793
Location
Nottingham
Hydraulic brakes are common on trams, though I can't say whether this tram-train uses them. Transmission is electric motors driving the wheels so no hydraulics there.
 

duffield

Established Member
Joined
31 Jul 2013
Messages
1,301
Location
East Midlands
Hydraulic brakes are common on trams, though I can't say whether this tram-train uses them. Transmission is electric motors driving the wheels so no hydraulics there.
So there's a definitely possibility that this was a potential serious safety issue with the brakes? This would certainly fit with abruptly withdrawing the entire fleet.
 

Crossover

Established Member
Joined
4 Jun 2009
Messages
9,246
Location
Yorkshire
The wheelsets can be interchanged between tram sets if and when necessary. I'm not claiming it's trivial to do - but it is quite possible. Indeed, when two TT vehicles were damaged in RTAs, they made up one complete unit from the "good" ends of these two - and then put railway wheels on another, so as to maintain the TT fleet of 4 total (3 in use; one spare).

I think the two havles making up one good unit has (or had) tram-train profile wheels on it, as I am fairly sure it was used on a BLS tour earlier in the year
 

Harpers Tate

Established Member
Joined
10 May 2013
Messages
1,679
I think the two havles making up one good unit has (or had) tram-train profile wheels on it, as I am fairly sure it was used on a BLS tour earlier in the year
Both halves were damaged in RTAs on the original network while operating the TT (Rotherham/Parkgate) service, so yes. But, as I said, as the bent composite one was sent away, another unit had its wheelset swapped to maintain the fleet of 4 with TT wheels.
 

Energy

Established Member
Joined
29 Dec 2018
Messages
4,418
For the sake of accuracy, seven vehicles, from which they need only three to run the normal tram-train service. In fact two of the seven (205/207) haven't yet reached Parkgate, and won't until they're re-equipped with tram-train profile wheelsets (they currently have tram system-only wheelsets).
Maybe I should stop trusting wikipedia!
 

woodhouse122

Member
Joined
9 Aug 2011
Messages
206
Tram train service now resumed - 2 trams per hour until further notice (they were promising the return of 3 trams per hour service from the 15th :) )
 
Joined
4 Apr 2017
Messages
5
How's the Sheffield Tram Train service been since the December hydraulics problem? Still running during the Lockdown?
 

Andyh82

Established Member
Joined
19 May 2014
Messages
3,489
The tram train has been running an hourly service requiring just one unit
 