Belperpete
Established Member
- Joined
- 17 Aug 2018
- Messages
- 1,646
Disruption on the Cambrian today, as the Welshpool to Sutton Bridge section was being worked by pilotman. OTT showed my train arriving at Welshpool, but didn't see it departing. About 3/4 hour late arriving at New Street, where it was terminated short.
What kind of fault could cause the loss of just one of the sections on an ETCS scheme? GSM-R failure at the Shrewsbury end?
What kind of fault could cause the loss of just one of the sections on an ETCS scheme? GSM-R failure at the Shrewsbury end?